Draft program plan for TNS: The next step after the Tokamak fusion test reactor. Part 1: Summary (original) (raw)
Draft Program Plan For Tns the Next Step After the Tokamak Fusion Test Reactor Part 1 Summary, 1977
Abstract
A draft program plan for TNS was prepared which consists of two basic parts-an R and D Needs Assessment and a Project Plan with schedules and necessary implementation steps. In this effort, questions concerning (1) the present basis for the TNS program, (2) the principal gaps in the supporting program, and (3) the necessary actions to be taken to implement the TNS program were examined. The study supported the thesis that the physics and technology bases do exist from which to start the TNS design as a central fusion program goal. Specific recommendations are made to emphasize those physics, technology, and engineering areas in which there are program gaps. In the project engineering study, basic schedule with close support from the R and D program is developed from which recommendations on administrative actions and areas for further elucidation are made. Presented in summary form are the findings of the study, the development of the principal theses, and the recommendation to ERDA-DMFE.
Mark D Roberts hasn't uploaded this paper.
Let Mark know you want this paper to be uploaded.
Ask for this paper to be uploaded.