A Discussion on The Quantification Methodologies and Their Applicability in Turkey for Construction and Demolition Waste (C&D (original) (raw)
Related papers
Management and recycling of constructional solid waste in Turkey
Procedia Engineering, 2011
Control and management of solid waste materials created during/after building/demolition and renewal of a structure is one of the most important problems of modern societies today. Solid waste materials which are differentiated depending on properties of structure and construction technique generally consist of materials such as concrete, brick, stone, briquette, wood, metal, glass, gypsum, plastic, ceramic. The matter of reuse was created as a result of limited capacity of reserves of sources and increased consumption depending on increase of population. Today it is possible reuse of various solid wastes. Consequently, evaluation of construction wastes which are used as primary aggregate source in construction industry, became very important in our world where natural sources were finished. Target of that study is examining utilization ratio of materials preferred during building process of structures by recycling at the end of utilization life for "Construction/ demolition wastes management and reuse"; control of environmental pollution, ecologic balance and economical development and discussion by providing examples from Turkey.
An Examination of the Development of the Construction and Demolition Waste-Related Regulations in Turkey, 2019
In order to manage construction and demolition (C&D) waste, which is harmful to the natural environment and human health, legislation has been introduced throughout the world. In Turkey, the most comprehensive regulation that deals only with C&D waste management (WM), entered into force in 2004. However, changes in the construction sector from 2004 until the present has led to inadequacies in some areas of this regulation. Therefore, a new draft regulation was prepared in 2017. This study is conducted to understand the strengths and weaknesses of the C&D WM regulations, identify the problems, and give recommendations. A three-stage methodology is adopted that includes a literature review, classifying the findings and analysing the relevant literature under the five main topics (the objective and the extent of the regulations, occupational health and safety issues, planning the demolition, collecting and transporting the produced waste, and establishing and operating the recovery plants). The findings show that the draft regulation contains arrangements for Turkey's current conditions. The terms of the draft regulation have brought more importance to environmental and human health, and occupational health and safety issues. However, only asbestos has been highlighted in the draft regulation as a hazardous waste. The draft regulation includes a limited arrangement regarding the waste produced in the case of refurbishment projects. It is assumed that eliminating the deficiencies in the draft regulation and the enactment of it will be an important step. Thus, environmental and economic benefits for Turkey will follow.
Quantifying construction and demolition waste: An analytical review
Waste Management, 2014
Quantifying construction and demolition (C&D) waste generation is regarded as a prerequisite for the implementation of successful waste management. In literature, various methods have been employed to quantify the C&D waste generation at both regional and project levels. However, an integrated review that systemically describes and analyses all the existing methods has yet to be conducted. To bridge this research gap, an analytical review is conducted. Fifty-seven papers are retrieved based on a set of rigorous procedures. The characteristics of the selected papers are classified according to the following criteriawaste generation activity, estimation level and quantification methodology. Six categories of existing C&D waste quantification methodologies are identified, including site visit method, waste generation rate method, lifetime analysis method, classification system accumulation method, variables modelling method and other particular methods. A critical comparison of the identified methods is given according to their characteristics and implementation constraints. Moreover, a decision tree is proposed for aiding the selection of the most appropriate quantification method in different scenarios. Based on the analytical review, limitations of previous studies and recommendations of potential future research directions are further suggested.
A study conducted to reduce construction waste generation in Turkey
Building and Environment, 2007
Waste occurs within the lifecycle of buildings, during the construction, modification and demolition phases. These construction wastes become serious environmental problems in many countries and in Turkey. However, no net data regarding the amount of construction wastes exist in Turkey. During its period of usage, frequent interior modifications are made for various reasons, particularly true for residences in Turkey, thus generating construction wastes. The primary environmental target regarding this subject should be the prevention and reduction of construction waste generation. The aim of this study is to provide suggestions regarding the prevention/ reduction of waste generated due to modifications done for various purposes in residences in Turkey. To this end, a survey of homeowners in Istanbul was conducted to determine the nature and purpose of modification work done in residences. In order to come up with solutions towards reducing the construction waste generation, it is vital that these reasons are known. In light of the causes determined, suggestions for solving the problems have been developed. r
C&D waste is a remarkable waste stream, the wide measure of waste expand from the consequence of expanding construction, maintenance, retrofitting and demolition activities in India. It is evaluated that in India the construction firm produces around 18 million tons of waste every year. This makes huge difficulties regarding space for disposal, unapproved dumping, blending with biodegradable waste, and so on. Presently the construction and demolition (C&D) waste accumulation framework in India is overseen in a decentralized way by each subcontracted organization. This absence of inclusive approach for C&D waste management causes confusing and in some cases singular state of mind in regards to the different measures for C&D waste. Therefore active waste management should be enforced. Construction stakeholders have wide range of best applications in C&D waste administration that can be implemented, so they should be assessed for their effectiveness. This research study aims to assistance the construction stakeholders in making a decision on C&D waste management. This paper brings out a survey accompanied among by the construction managers and agents in directive to calculate the effectiveness of 24 standard practice measures in respects to C&D waste administration, recognizing the most suitable types of construction projects to implement these applications and also the benefits and drawbacks of their implementation in a construction project. Results of this study show that among the highly effective best applications are: the usage of industrialized frameworks and the contract of suppliers managing the waste. In addition, small containers are providing in the work spaces is also another high valued application, although only 44% of respondents frequently appliance this measure in their works.
Types of waste in the context of waste management and general overview of waste disposal in Turkey
International Journal of Agriculture Environment and Food Sciences
In Turkey, there has been an increase in waste management applications within the context of sustainability activities recently. The most important reason for that was the legal requirements for recycling and disposal of the waste generated by the producers. Developing nations still utilize the storage method, while developed countries recycle almost all produced waste to produce raw materials and energy. Although there is an increase in the number of work conducted on waste management in Turkey, the attained levels are still far from satisfactory. This is mainly due to waste recycling or recovery costs. In order to convert the problem of waste into economic benefits, it is of utmost importance to recycle the waste, avoid the transfer of waste to landfills and to conduct waste management. Thus, an environmentally and economically sustainable productivity would be achieved. In the present study, waste management in Turkey was scrutinized. In this context, types and volume of the wast...
Preliminary study for the management of construction and demolition waste
Waste Management & Research, 2008
This paper refers to the management of the construction and demolition (C&D) waste since, according to the EU Waste Strategy, C&D waste is considered to be one of the priority waste streams and appropriate actions need to be taken with respect to its effective management. Initially, the paper presents the state-of-the-art of the problem of C&D waste, including the amount and composition of C&D waste in EU countries, differences in the characteristics of this waste stream depending on its origin, as well as collection and management practices that are applied. A methodology is described for the estimation of the quantities of the waste stream under examination, since in most cases quantitative primary data is not available. Next, the fundamentals for the development of an integrated scheme for the management of C&D waste are presented and discussed, such as appropriate demolition procedures and location of waste management (off-site waste management, on-site waste management, direct on-site recovery, centralized on-site recovery). Finally, taking into consideration all relevant parameters, alternative systems that could be applied for the management of the C&D waste are suggested.
Construction and Demolition Waste and Its Management Challenges in Iran: A Case Study in Tabriz City
Health Scope
Background: The management of construction and demolition (C&D) waste is among the fastest-growing concerns in Iran. Moreover, the basic prerequisites for the effective performance of every waste management program are the accessibility of adequate and precise data on characteristics and its current management condition. Objectives: Estimating the amount of C&D waste in Tabriz metropolitan city (Iran) was one of the key aims of the current study. Another objective of this study was to evaluate of C&D waste handling and their final disposal. Methods: The C&D waste generation rate was estimated according to the waste weight per area of construction and demolition in Tabriz. Then the C&D waste management condition was assessed using a checklist, visiting the disposal site, intervening authorities, and analyzing scientific databases. Results: The amount of C&D waste generation rate in the Tabriz city was estimated to be in the range of 167034 to 848480 ton/year or 0.114 to 0.534 ton/year per capita and 2.267 ton/m 2 of demolition. In this area, like most other parts of the country, no scientific and systematic program was observed for source reduction (reduce, reuse, and recycle of the C&D waste). Due to the non-availability of any standard disposal site, all the C&D waste (except for some recycled items such as metals) were deposited at the nearest distance from the city in public lands, waterways, valleys, roadsides and so on. Conclusions: According to the findings there is a great urgent need for applying specific practical policies, rules, and regulations for source reduction (reduce, reuse, and recycle (3R)) of C&D waste. Moreover, a central disposal site should be allocated to dispose of the remaining C&D waste according to the environmental and health considerations.
Quality and quantity of construction and demolition waste in Tehran
Journal of Environmental Health Science and Engineering
Background: In recent years the generation rate of construction and demolition waste (C&D) has significantly augmented. The aim of this study was to assessed the quality and quantity of construction and demolition waste in Tehran (capital of Iran). Methods: Questionnaire methods were used for estimating the amount of generated C&D wastes national statistical data and typical waste generation data. In order to defining the composition of C&D waste, trucks were randomly selected and their wastes were separated and weighted. Results: According to obtained results, about 82,646,051 m 3 of C&D waste (average 16,529,210 m 3 per year) were generated during 2011 to 2016 which only about 26% of them has been recycled. Mixing sand and cement, concrete, broken bricks and soil have the highest amount of the composition of C&D waste in Tehran that was 30, 19, 18 and 11%, respectively. Based on the results, about 2,784,158 t of the waste will generate in 2025 and this is approximately 122% higher than wastes generate in 2016. Based on MAPSA's data, 360 teams of personnel cruise and control the illegal disposals, but due to the expansion of Tehran this number of teams is inadequate and can't be effective in controlling the situation. Conclusion: In general, the overall condition of C&D waste management in Tehran seems undesirable and needs to be updated based on the experience of successful countries in this field.