Evaluasi Terhadap Kondisi Fisik, Pengelolaan, dan Pemanfaatan Pembangkit Listrik Tenaga Mikrohidro di Desa Palakka, Kec. Maiwa, Kab. Enrekang (original) (raw)

Analisis Kelayakan Pembangkit Listrik Tenaga Mikrohidro (PLTMH) DI Embung Kuniran Kecamatan Sine Kabupaten Ngawi

Jurnal Teknik Elektro, 2021

Potensi Energi Baru Terbarukan (EBT) yang ada di Indonesia tergolong banyak, meskipun demikian pengembanganya belum optimal sehingga di masa depan dapat lebih dioptimalkan. Rasio Elektrifikasi (RE) di Kabupaten Ngawi sendiri sebesar 89,23 persen kerenanya masih dibutuhkan pengembangan guna kebutuhan dari masyarakat yang belum terpenuhi. Embung Kuniran di Kabupaten Ngawi merupakan salah satu tempat yang berpotensi untuk dibangunnya Pembangkit Listrik Tenaga Mikrohidro (PLTMH). Dasar dari mikrohidro adalah pemanfaatan potensial energi tinggi jatuh air (head) dimana semakin tinggi air tersebut jatuh maka akan lebih besar pula energi listrik yang didapat dari diubahnya energi potensial tersebut. Analisis kelayakan ini dilakukan dengan beberapa metode yang dilakukan guna mengetahui headnett.dengan google maps koordinat atau google earth , kemudian untuk mengetahui data debit dipakai metode apung dengan cara mengapungkan botol plastik 600 mL diberi isi air tidak penuh.dengan jarak sesuai dengan aliran embung dimana sudah diketahui.ke.dalamannya dan lebar embung tersebut. Penelitian ini bertujuan untuk menghitung besar potensi daya listrik dari Embung Kuniran apabila headnett sebesar 3 meter maka daya listrik rata-rata yang dapat dibangkitkan sebesar 2918.3 kW, meskipun head yang dimiliki Embung Kuniran tergolong rendah tetapi debit air yang di hasilkan Embung Kuniran tergolong besar dan stabil. Tipe Turbin air yang paling optimal adalah Turbin air dengan jenis Turbin Kaplan karena memiliki head yang rendah yaitu 3 m, juga rata rata debit airnya adalah 123.95 m 3 /s.

Evaluasi Pembangkit Listrik Tenaga Mikro Hidro Di Desa Seburuk Kecamatan Belitang Hulu Kabupaten Sekadau

2021

Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Desa Seburuk Kecamatan Belitang Hulu Kabupaten Sekadau yang telah beroperasi dari tahun 2016 dengan kapasitas 30 kW. PLTMH langsung dikelola oleh masyarakat setempat dan PLTMH ini beroperasi memanfaatkan aliran sungai ngaring kajang yang merupakan sungai kecil di daerah tersebut.Penelitan yang dilakukan yaitu bertujuan untuk menentukan debit air rencana dengan mencari intensitah hujan harian menggunakan metode Mononobe dan analisa Flow Duration Curve (FDC) mendapatkan efesiensi turbin air PLTMH yang ada di Desa Seburuk, Kecamatan, Belitang Hulu, Kabupaten Sekadau dan Mengevaluasi kapasitas PLTMH yang dibangkitkan dengan daya teoritis yang terhitung. Dalam penelitian ini untuk mendapatkan debit air yaitu dengan pengukuran secara langsung dan menggunakan metode mononobe untuk menghitung intensitas hujan dengan mengolah data curah hujan harian dari Balai Wilayah Sungai Kalimantan I (BWSK), Kemudian dilakukan analisa Flow Duration Curve (FD...

Perancangan Pembangkit Listrik Tenaga Mikrohidro. Studi Kasus DI Curug Cigeuntis, Kecamatan Tegalwaru, Kabupaten Karawang, Jawa Barat

Journal of Electrical Vocational Education and Technology, 2021

This research aims to create a design model of microhydro powerplant, and implement that design model to particular location, which decided location in this research is Cigeuntis Waterfall. Output of this research can be utilized by microhydro power plant practitioners as a tool, and stakeholders to valuing natural resources potential in their area. Cigeuntis Waterfall is selected because it has sufficient water in raining season, and more important, in dry season. Analysis descriptive method is used in this research with qualitative approach. Technics of Engineering is type of this research, encompassing design formulation of microhydro power plant, formula validation by comparing design of microhydro power plant based on formula with existing microhydro power plant in PLN Laboratory, and designing microhydro power plant components like intake, settling basin, penstock pipe, turbine, pulley, and generator regarding water flow and net head of Cigeuntis Waterfall. Results of this res...

Studi Identifikasi Potensi Pembangkit Listrik Tenaga Mikrohidro DI Desa Ambawang Kecamatan Kubu Kabupaten Kubu Raya

2021

Mikrohidro atau yang dimaksud dengan Pembangkit Listrik Tenaga Mikrohidro (PLTMH) adalah suatu pembangkit listrik skala kecil yang menggunakan tenaga air sebagai tenaga penggeraknya seperti, saluran irigasi, sungai atau air terjun alam dengan cara memanfaatkan tinggi terjunan (head) dan jumlah debit air. Studi Potensi Pembangkit Listrik Tenang Mikrohidro pada sungai Batu Wangkang memberikan tentang ilmu pengetahuan kepada masyarakat sekitar mengenai potensi dan manfaat Pembangkit Listrik Tenaga Mikrohidro. Metode yang digunakan dalam penelitian ini adalah metode casimir yang dibandingkan daya perhitungan manual serta pengambilan data langsung dilapangan. Selain itu juga dengan mendatangi beberapa pihak terkait. Potensi yang berhasil didapat dari penelitian ini dengan tinggi jatuh (head) 17,1 meter dan debit air sebesar 0,285 menghasilkan daya sebesar 26,74 kW dan dengan mengunakan program casimir menghasilkan daya sebesar 26,30 kW. Jenis turbin yang digunakan yaitu Turbin Pelton da...

Studi Potensi Pembangkit Listrik Tenaga Mikrohidro (PLTMH) DI Sungai Cikawat Desa Talang Mulia Kecamatan Padang Cermin Kabupaten Pesawaran Propinsi Lampung

Jurnal Ilmiah Teknik Mesin, 2013

Electric was the vital energy and needed by community for all activity as lighting, radio, television (information), industry , etc. Although aspecialy the urban community was needed this energy and a little rural community was needed. There was several isolated villages in Pesawaran sub province , no electricity by PLN. For this villages goverment would supply the elerctric energy and build microhydro electric plant. The purpose of this with title Feasibility Study Micro Hydroelectric Power Station (PLTMH) at cikawat river in talang mulia village pesawaran sub province is to contributed in hydro turbine management and to planning a micro hydroelectric power station that can be used and applied for a better life The research was carried out by using a very simple method is to use a floating object method to measure discharge and plastic hose method for measuring head. Based on the field data, (Head efektif = 9. 35m and water debt = 0,1029 m3/s) the crossflow Turbine can produce energy 7.07 kW. Bellow to the data above it is result that the cikawat river can be set a micro hydro electric power.

Studi Perencanaan Pembangkit Listrik Mikrohidro Di Desa Sambangan Kabupaten Buleleng Bali

Majalah Ilmiah Teknologi Elektro, 2013

Pemanfaatan PLTMH telah dilakukan di Desa Sambangan, Kecamatan Sukasada, Kabupaten Buleleng-Bali dengan nama PLTMH Cahaya Abadi. PLTMH Cahaya Abadi memanfaatkan sebagian aliran air dari Sungai Tiying Tali. Berbagai kendala berakibat PLTMH tersebut terbengkalai. Dari permasalahan tersebut, dilakukan evaluasi terhadap PLTMH Cahaya Abadi dan perancangan teknis PLTMH Baru yang sesuai potensi dan mengacu pada berbagai kriteria pembangunan PLTMH.Observasi setiap komponen sipil dan mekanikal- elektrikal PLTMH Cahaya Abadi. Debit rancangan PLTMH Baru ditentukan berdasarkan aliran terendah. Tinggi head diperoleh dengan menggunakan GPS dan Google Earth. Persamaan yang merupakan pola dari ukuran bangunan sipil dari beberapa PLTMH lain digunakan sebagai pendekatan untuk menentukan ukuran bangunan sipil PLTMH Baru. Dari hasil analisis diperoleh bahwa kondisi komponen penyusun PLTMH Cahya Abadi dibangun secara sederhana dan tidak sesuai dengan kriteria pembanguan PLTMH. Perancangan PLTMH Baru men...

Studi Analisa Potensi Sumber Air sebagai Pembangkit Listrik Tenaga Mikrohidro (PLTMH) di Karungan Kelurahan Mamburungan Timur Kota Tarakan

Jurnal Inovasi Sains dan Teknologi (INSTEK), 2021

The supply of electrical energy in Tarakan City, North Kalimantan, still relies on diesel power which uses a limited number of petroleum energy sources. There is a need for research related to renewable energy sources that have the potential to become alternative energy for the people of Tarakan City. Water is an energy source that has great potential to generate electricity. The energy source that should be taken into account is micro-hydro which can be used as a Micro-hydro Power Plant (PLTMH). A survey of micro-hydro sources in Tarakan City, precisely in the Karungan area, East Mamburungan Village, has been carried out with the direct measurement method of water discharge and the relationship with the power generated. The result shows the water source has a discharge 0.00034 m3/ s, the water velocity of 0.035 m/s and generates power only up to 1.1 watts. Based on the power obtained, the water source in this place cannot be used as a source of micro-hydro energy, but has the poten...

Pembangkit Listrik Tenaga Mikrohidro Di Sulawesi

Sejalan dengan bertambahnya jumlah penduduk di provinsi Sulawesi Tenggara dengan rasio elektifitas yang mencapai 38 %, maka untuk menselaraskan kebutuhan energi di daerah terpencil yang jauh dari jaringan sistem tegangan tinggi yang ada di Sulawesi Tenggara, diperlukan percepatan pembangunan energi listrik melalui energi baru terbarukan. Pembangkit Listrik Tenaga Minihidro yang akan dirancang di kecamatan Ngapa, kabupaten Kolaka Utara, provinsi Sulawesi Tenggara, yang dialiri oleh sungai Wwatunohu dengan debit sungai 16-42 m 3 /detik. Dari kondisi hidrologi sungai maka didapatkan debit rencana sebesar 8,264 m 3 /detik. Dengan gross head sebesar 39,3 m, maka digunakan turbin francis dengan daya keluaran yang dihasilkan generator mencapai 2.301 kW (per-unit).

Perencanaan Pembangkit Listrik Tenaga Mikrohidro DI Bendungan Semantok, Nganjuk, Jawa Timur

Jurnal Hidroteknik, 2015

Abstrak-Penerapan teknologi mikrohidro sebagai pembangkit listrik merupakan solusi yang tepat untuk memanfaatkan potensi perbedaan muka air antara hulu dan hilir bendungan. Pembangkit Listrik Tenaga Mikrohidro dapat dibangun dengan syarat perbedaan ketinggian minimal 2 meter dan debit selalu tersedia, karena yang digunakan hanya energi potensialnya, sehingga debit air masih dapat dimanfaatkan untuk pengairan. Di Kali Semantok yang terletak di Desa Sambikerep, Kecamatan Rejoso, Kabupaten Nganjuk, Jawa Timur direncanakan sebuah bendungan yang mempunyai beda elevasi total setinggi 20,34 dan debit minimum 0,02m3/detik sehingga dapat dimanfaatkan sebagai Pembangkit Listrik Tenaga Mikrohidro (PLTMH). Dengan memanfaatkan debit kebutuhan irigasi Daerah Irigasi Bendungan Semantok sebesar debit rencana 0,20 m3/detik, 0,40 m3/detik, 0,60 m3/detik, dan tinggi jatuh efektif berkisar antara 24,00-26,35 meter, serta menggunakan turbin Kaplan maka perbedaan beda ketinggian muka air pada hulu dan hilir Bendungan Semantok menghasilkan daya listrik sebesar 3.407,79 Kw dan energi listrik per tahun sebesar 827.534,01 kWh. Kata Kunci-Mikrohidro, debit rencana, debit kebutuhan irigasi, ketinggian efektif, energi listrik brought to you by CORE View metadata, citation and similar papers at core.ac.uk