Proposta de uma modelagem de dados para auxiliar no controle integrado da produção e da qualidade (original) (raw)
Related papers
2014
LEÃO, C. F. Proposta de Modelo para Controle Integrado da Produção e da Qualidade Utilizando Tecnologia de Informação. 2014. Dissertação (Mestrado em Engenharia) – Programa de Pós-Graduação em Engenharia Civil, UFRGS, Porto Alegre. Unfinished work has been pointed out in the literature as an important problem that has been neglected in management systems, contributing to increase waste in construction, especially due to the need to redo tasks already performed. This type of waste also contributes to increase informal packages, since rework and small finishing tasks, sometimes, are not formally planned in short-term planning meetings. There are also evidences that the execution of informal packages also increase making-do waste, which occurs when a task is started without all necessary inputs available. The integration between production and quality control is considered as a means of reducing the incidence of informal packages and making-do. Moreover, the use of mobile devices in pr...
Proposta de modelo para controle integrado da produção e da qualidade com apoio da computação móvel
Ambiente Construído, 2016
Proposta de modelo para controle integrado da produção e da qualidade com apoio da computação móvel An integrated production and quality control model supported by mobile computing Cibeli Ferrando Leão Eduardo Luis Isatto Carlos Torres Formoso Resumo lguns estudos indicam que as perdas por making-do são frequentes na indústria da construção e constituem-se na causa-raiz de outras perdas, tais como acidentes, falhas de qualidade, retrabalho e trabalho em progresso. As perdas por making-do referem-se à situação na qual uma tarefa começa ou continua sem ter disponíveis todos os itens necessários para sua conclusão. Há evidências de que as perdas por making-do estão também relacionadas com a falta de terminalidade das tarefas e com a execução de pacotes de trabalho informais. A literatura sugere que a integração entre os controles da produção e da qualidade é um meio de reduzir a incidência de pacotes informais e, consequentemente, as perdas por making-do. Para viabilizar o desenvolvimento de sistemas de controle que permitam coletar e processar dados sobre esses problemas de forma eficiente, é necessário explorar o uso da computação móvel, que oferece oportunidades de inovação em sistemas de controle. Assim, o objetivo principal deste estudo é desenvolver um modelo de controle integrado da produção e da qualidade, vinculado ao Sistema Last Planner, com o apoio da computação móvel. Foi realizado um estudo empírico em dois empreendimentos habitacionais de baixa renda, no qual o modelo proposto foi avaliado. A aplicação do modelo permitiu coletar dados relacionados à conclusão de pacotes de trabalho, execução de pacotes informais, falta de terminalidade das tarefas, perdas por making-do e verificação da qualidade. Palavras-chaves: Controle integrado. Gestão da produção. Qualidade. Perdas. Computação móvel.
REFINAMENTO DO CONTROLE INTEGRADO DA PRODUÇÃO E QUALIDADE NO CANTEIRO COM O SUPORTE DE BIM
A ineficácia ou ausência do Planejamento e Controle da Produção (PCP) consiste em um dos principais motivos para o baixo desempenho de empreendimentos de construção, manifestando-se principalmente mediante perdas e retrabalhos durante a fase de construção. Estes pontos, associados à falta de qualidade nos trabalhos entregues, podem acarretar em um desgaste no relacionamento com os clientes internos e externos, podendo ser a causa de litígios judiciais ou exclusões para novas licitações ou concorrências. Além disso, os métodos hoje utilizados tanto para o controle produtivo como de qualidade, baseiam-se ainda em aprovações manuais, realizadas de acordo com critérios subjetivos. Estas tarefas são normalmente executadas por meios tradicionais, como planilhas de verificação, que além de gerar um grande volume de documentos para serem posteriormente arquivados, acarretam a dificuldade para a sua busca e visualização quando necessários. Dessa forma, há uma necessidade de desenvolver métodos e processos que busquem a melhoria e integração, do PCP e do controle de qualidade na construção, preferencialmente através de tecnologias de informação, como serem o BIM e a computação móvel. Palavras chave: PCP – tecnologias de informação-BIM – controle de qualidade.– retrabalho ABSTRACT The inefficiency or absence of Production Planning and Control (PPC) constitutes one of the main reasons for the low building projects' performances, being this mainly manifested through wastes and rework in the construction phase. These points, associated to the lack of quality for the delivered work, could lead to misunderstandings with internal and external clients, and thus originate possibilities for judicial disputes and exclusions from future tender processes. Moreover, the methods currently used for productive and quality control are still based on manual approvals, mainly made according to subjective criteria. In this way, control activities are normally executed by traditional means, as verification spreadsheets, which in addition to the creation of a great volume of documents to be then stored, intrinsically cause difficulties for their visualization and search when needed. Therefore, there is a need to develop methods and processes that seek the improvement and integration of both, PPC and quality control in construction, preferably through information technologies, such as BIM and mobile computing. Keywords: PPC – information technologies – BIM – quality control – rework.
2016
Production and quality controls undertaken in construction sites have often been associated to bureaucratic procedures, being limited to simple administrative tasks, instead of adding value for internal and external stakeholders. For that reason, some research studies have proposed approaches and indicators for the integration of production and quality controls. One of these approaches pointed out in the literature is the use of mobile devices, to support the implementation of those controls. Those devices allow the management of large information batches, reducing rework and errors derived from manual paper-based data collection and further transcription to digital media. Other efforts have focused on the integration between product and process models so that information can be more effectively used during the construction phase of the project. Process models are necessary for carrying out production planning and control, while product models are concerned with 2D or 3D design, and, most recently, with BIM models. Nonetheless, the literature on the use of information technology for implementing integrated production and quality control is scarce. The aim of this research work is to develop a model for the integration of management processes, composed by production planning, control and quality management processes, and a BIM product model, in order to facilitate the monitoring of project execution, including the performance in terms of quality and the occurrence of waste. Two empirical studies were carried out in different construction companies, using the design science research approach. The main contributions of this investigation are related to the integration between some proactive control results and the BIM model in a systematic way. Furthermore, the proposed model has the possibility to be adapted for diverse uses, such as incorporating information from different phases of the construction project life cycle.
Proposta de metodologia para controle de qualidade em uma fábrica de software
2007
Software industry has over the years put effort into reacting to changes boosted by an ultracompetitive market, with a growing demand for high-quality products. The permanence in a highly dynamic and demanding market pushes organizations towards the search for technology, techniques and methodologies that can support their activities. The goal is to produce high-quality products within realistic budget and schedule, within reasonable costs without, however, affecting the productivity and the quality of products and processes. The concern with software quality has taken the organizations to adopt distinct approaches that, if taken seriously and systematically, can contribute greatly for the solution of the problems faced by software development organizations. This work proposes a methodology for quality control that combines systematic reuse, testing and software inspection, in the context of software factories. The results of a case study are also presented in order to validate the proposed methodology, by means of the application of the UML Components model and by using X-Packager, a tool that describes and packages the assets that are generated during software development. Some of the contributions of this work are: the systematization of the application of combined activities that promote software quality; a better understanding of the concepts and approaches related to such activities; a better understanding of process and product quality models as well as software factories, a hot research topic that has deserved the attention of professionals, researchers and companies who work within this area.
Sistema puxado de planejamento e controle da produção
XV Encontro Nacional de Tecnologia do Ambiente Construído, 2014
Na indústria da construção civil continuamente são desenvolvidas pesquisas nos âmbitos da Construção Enxuta e do Planejamento e Controle da Produção (PCP), visando identificar formas mais racionalizadas de gestão da construção. Um dos principais aspectos abordados nesta área temática é compreender quando um sistema de PCP deve passar de empurrado a puxado, agregando maior previsibilidade e confiabilidade ao processo. Também se torna importante identificar quais os principais parâmetros e métricas de acompanhamento do PCP. Observou-se que existem diferentes referências que apresentam abordagens distintas de planejamento na construção a partir do entendimento do Projeto do Sistema da Produção (PSP). Assim, é objetivo deste trabalho realizar uma discussão teórica sobre o uso combinado das técnicas tradicionais de PCP com as da mentalidade enxuta para que se obtenha um sistema de fluxo contínuo e puxado de produção. As principais abordagens focam nos procedimentos do Pull Planning e do Takt Time Planning (TTP) que podem ser vinculados ao Last Planner System (LPS). Como resultado preliminar deste artigo, é gerada uma hipótese de integração dos sistemas por meio da integração das fases do PSP e do LPS, que ainda necessita ser testada.