A Better Well and Better Fracturing Improve Production in B-Field, Offshore Northwest Java (original) (raw)
Day 3 Thu, October 14, 2021
Abstract
B-Field is located in Northwest Java and holds potential hydrocarbon in its low-quality marine sandstone reservoir, BR-34A and BR-34B zones. Each zone has a permeability range between 5 and 12 mD and can only produce approximately 20 to 50 BFPD without stimulation, making the well a non-economic producer. In 2020, two infill development wells, A-08 and K-08, were drilled targeting these zones. Both wells were planned to be completed with hydraulic fracturing stimulation to boost the production. The first well, A-08 was completed earlier than K-08, but the production result from the well was unsatisfactory. The pressure evaluation analysis indicated high near-wellbore pressure of more than 1,000 psi. There were no reliable mechanical properties data in the well, which led to a conservative final hydraulic fracture design to avoid fracture growth into the nearby watered-out zone, BR-35. Therefore, only 30,000 lbm of proppant were pumped, resulting in minimal proppant concentration in ...
Yasinta Setiawati hasn't uploaded this paper.
Let Yasinta know you want this paper to be uploaded.
Ask for this paper to be uploaded.