A new computational approach for project management networks (original) (raw)
Computers & Industrial Engineering, 1995
Abstract
Every project, whether large or small, requires a plan, a schedule, a system of control. One method of accomplishing the required function is with an activity network — most notably PERT networks. Recent research has shown numerical approximation methods to be superior to either deterministic analysis (such as critical paths) or simulation sampling techniques in terms of accuracy and run