Minimazing the total completion time in a two stage flow shop with a single setup server (original) (raw)

Approximation algorithms for two-machine flow shop scheduling with batch setup times

Vitaly Strusevich

Mathematical Programming, 1998

View PDFchevron_right

A two-stage flow shop scheduling problem with transportation considerations

Moncef Abbas

4OR, 2015

View PDFchevron_right

A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines

Enrique Gerstl

International Journal of Production Economics, 2013

View PDFchevron_right

A comparison of heuristic algorithms for flow shop scheduling problems with batch setup time and limited batch size

Frank Werner

Mathematical and Computer Modelling, Vol. 29, 1999, 101 - 126.

View PDFchevron_right

Two-machine flowshop scheduling problem with bounded processing times to minimize total completion time

Harun Aydilek

Computers & Mathematics With Applications, 2010

View PDFchevron_right

Algorithms for Flexible Flow Shop Problems with Unrelated Parallel Machines, Setup Times and Dual Criteria

Frank Werner

International Journal of Advanced Manufacturing Technology, Vol. 37, 2008, 354 - 370

View PDFchevron_right

Heuristic Flow-Shop Scheduling to Minimize Sum of Job Completion Times

Suresh Sethi

Canadian Journal of Administrative Sciences / Revue Canadienne des Sciences de l'Administration, 2009

View PDFchevron_right

A heuristic for scheduling two-machine no-wait flow shops with anticipatory setups

Chris Potts

Operations Research Letters, 2000

View PDFchevron_right

Decomposition heuristic for a two-machine flow shop with batch processing

John Fowler

Proceedings of the Winter Simulation Conference 2014, 2014

View PDFchevron_right

A new heuristic for the n-job, M-machine flow-shop problem

Yih-long Chang

European Journal of Operational Research, 1991

View PDFchevron_right

Heuristics for flow shop scheduling with multiple operations and time lags

Jan Riezebos

View PDFchevron_right

A two-stage flow shop scheduling with a critical machine and batch availability

Enrique Gerstl

View PDFchevron_right

Minimizing total completion time in two-machine flow shops with exact delays

Han Hoogeveen

Computers & Operations Research, 2009

View PDFchevron_right

Scheduling a two-stage hybrid flow shop with parallel machines at the first stage

Prof. Ahmed Hariri

Annals of Operations Research, 1997

View PDFchevron_right

Minimizing total completion time in a two-machine flow shop with deteriorating jobs

T. C. E. Cheng

Applied Mathematics and Computation, 2006

View PDFchevron_right

Some heuristics for the hybrid flow shop scheduling problem with setup and assembly operations

Fariborz Jolai

View PDFchevron_right

A heuristic approach to minimizing the waiting time of jobs in two-stage flow shop scheduling

Bharat Goyal

Badania Operacyjne i Decyzje/Operations Research and Decisions, 2024

View PDFchevron_right

Flow shop scheduling problem with limited machine availability: A heuristic approach

Riad Aggoune

International Journal of Production Economics, 2006

View PDFchevron_right

Two-machine flow shop scheduling problems with minimal and maximal delays

Jean-louis Bouquard

4OR, 2006

View PDFchevron_right

Scheduling heuristic for the n-jobm-machine flow shop

Subhash Sarin

Omega, 1993

View PDFchevron_right

Two-machine flowshop scheduling problem with coupled-operations

Mourad Boudhar

Annals of Operations Research, 2018

View PDFchevron_right

Flow shop scheduling with two batch processing machines and nonidentical job sizes

Fariborz Jolai

The International Journal of Advanced Manufacturing Technology, 2009

View PDFchevron_right

The hybrid flow shop scheduling problem

Ruben Ruiz

2010

View PDFchevron_right

Two-machine flow shop scheduling problems with no-wait jobs

Vitaly Strusevich

Operations Research Letters, 2005

View PDFchevron_right

A Comparison of Scheduling Algorithms for Flexible Flow Shop Problems with Unrelated Parallel Machines, Setup Times and Dual Criteria

Frank Werner

Computers and Operations Research, Vol. 36, No.2, 2009, 358 - 378

View PDFchevron_right

Heuristics for no-wait flow shop scheduling problem

Kawal Jeet

International Journal of Industrial Engineering Computations, 2016

View PDFchevron_right

Solving Permutation Flow Shop Scheduling Problem with Sequence-Independent Setup Time

Karam Allali

Journal of Applied Mathematics

View PDFchevron_right

Three Algorithms for Flexible Flow-shop Scheduling

Tzung-Pei Hong

American Journal of Applied Sciences, 2007

View PDFchevron_right

Scheduling two-stage hybrid flow shops with parallel batch, release time, and machine eligibility constraints

Wang I-Lin

View PDFchevron_right

On a borderline between the NP-hard and polynomial-time solvable cases of the flow shop with job-dependent storage requirements

Julia Memar

Journal of Global Optimization, 2021

View PDFchevron_right

Efficient heuristics for the parallel blocking flow shop scheduling problem

Imma Ribas

Expert Systems with Applications, 2017

View PDFchevron_right

Heuristic algorithms for scheduling hybrid flow shops with machine blocking and setup times

Anselmo R . Pitombeira Neto

Journal of the Brazilian Society of Mechanical Sciences and Engineering, 2018

View PDFchevron_right