Analysis of Small Hydropower Generation Potential: (1) Estimation of the Potential in Ungaged Basins (original) (raw)
Small hydropower (SHP) plants are advantageous as they have a short construction period and can be easily maintained. They also have a higher energy density than other alternative energy sources as environmentally-friendly energy sources. In general, hydropower potential is estimated based on the discharge in the river basin, and the discharge can be obtained from the stage station in the gaged basin. However, if there is no station (i.e., ungaged basin) or no sufficient discharge data, the discharge should be estimated based on rainfall data. The flow duration characteristic model is the most widely used method for the estimation of mean annual discharge because of its simplicity and it consists of rainfall, basin area, and runoff coefficient. Due to the characteristics of hydroelectric power depending on the discharge, there is a limit to guaranteeing the accuracy of estimating the generated power with only one method of the flow duration characteristic model. Therefore, this stud...
Sign up for access to the world's latest research.
checkGet notified about relevant papers
checkSave papers to use in your research
checkJoin the discussion with peers
checkTrack your impact