日本建設業界にとっての黒船 (original) (raw)
日本建設業界にとっての黒船
Japan Society of Civil Engineers, International Activities Center, No. 23
Sign up for access to the world's latest research.
checkGet notified about relevant papers
checkSave papers to use in your research
checkJoin the discussion with peers
checkTrack your impact
Related papers
2015
We point out the dark side of Japanese corporate systems, by means of the concept of 'Evil Corporation'. It is described in Japanese media as a company that exhibits coercive power relationship with employees by exploiting their feelings of loyalty. Employees are physically and psychologically (e.g., long overtime-work without pay) suffering from internal selection process. An example of Evil Corporation is illustrated showing that the rhetoric of 'family' is used as a means to exploit
Journal of The Japanese Institute of Landscape Architecture, 2021
This research aims to analyze the implementation process and framework of disaster risk reduction (DRR) design through BIG-U Project’s Rebuild by Design (RBD) competition phase and implementation phase in the City of New York, USA. Background of this research challenges creating a new type of holistic framework towards strategic implementation of DRR design. Research methods include detailed literature review and interviews with RBD organizer, the City of New York Park and Recreation Department, and design consultant BIG to understand the framework of BIG-U’s DRR design. Research results are as follows. We analyzed BIG-U’s framework in strategies and clarified clear DRR strategies sustained and influenced to projects. For organizational structures, government bodies, design team and citizens or stakeholders worked together to realize DRR targets. For project implementation and methods, one BIG-U project divided into ESCR and LMCR in order to implement incrementally in coordination with appropriate parties. Both projects tried to hybridize designing functional spaces to reduce impact of climate change risks and creating social, connecting places at the same time. Further investigation required for clarifying relationship between RBD projects and policies related to DRR as well as detailed analysis on space to achieve DRR design.
Removal of electric poles seen in reconstruction plans in pre-and postwar in TOKYO
HISTORICAL STUDIES IN CIVIL ENGINEERING, 1999
During the period from the inauguration of the Tokyo Reconstruction Project to the end of World War II , all done by the project was the efforts to decrease the number of electric poles on Otsuka Roads by putting some overhead cables together on common poles. Among many plans, the Tokyo Health Road Plan and the Tokyo Postwar Reconstruction Plan were prominent. The former aimed to remove poles and billboard , building pedestrian-dedicated roads with an affluence of greenery. The latter attempted to remove electric poles from roads which are wider than 36m. Some cables still remained over head were moved to alleyways behind detouring around the roads. Further , the plan was proposing to include the common ducts and poles in the category of urban planning. The plan specified the areas from which electric poles were removed to provide educational and public space for scenic view. However, these plans were not fulfilled due to the reduction of the scale in Postwar Reconstruction Land Readjustment Project .
Loading Preview
Sorry, preview is currently unavailable. You can download the paper by clicking the button above.