Disruptions Analysis for Equipments Used in Lignite Open Pits (original) (raw)

Probabilistic Issue of Reliability for Power Machinery Operating in Coal Fired Power Plants

Janusz Buchta

Journal of Power and Energy Engineering, 2014

View PDFchevron_right

Stochastic investigation of exploitation parameters to the mining cost at lignite mines of Greece

Christos Roumpos

View PDFchevron_right

COAL PRODUCTION BY LONGWALLMINING-A STUDY AND ANALYSIS OF EQUIPMENT BREAKDOWN CAUSE PATTERNS

Publisher ijmra.us UGC Approved

View PDFchevron_right

Reliability analysis of the main conveyor system in underground coal mine to determine the maintenance schedules

PRITAM KUMAR

International Journal of Mining and Mineral Engineering, 2017

View PDFchevron_right

Reliability-based maintenance scheduling of powered supports in Tabas mechanized coal mine

Amid Morshedlou

2014

View PDFchevron_right

Reliability investigation for a fleet of load haul dump machines in a Swedish mine

uday kumar

Reliability Engineering & System Safety, 1989

View PDFchevron_right

InvestIgatIon of the relatIonshIp between relIabIlIty of track mechanIsm and mIneral dust content In rocks of lIgnIte open pIts badanIe zwIązku mIędzy nIezawodnoścIą podwozIa gąsIenIcowego a zawartoścIą pyłów mIneralnych w skałach kopalnI odkrywkowych

Vladimir Milisavljevic

2015

View PDFchevron_right

Determination of Performance Analysis for an Underground Colliery Utilizing Mechanized Production System

Cem Şensöğüt

International Journal of Economic and Environmental Geology, 2019

View PDFchevron_right

Interval estimation of the availability factor of the bucket-wheel excavator based on bootstrap modeling

Irina GADOLINA

Journal of Machinery Manufacture and Reliability, 2016

View PDFchevron_right

Data Analysis for the Preventive Maintenance of Machinery

Ricardo Piqueras Bonet, José María Fernández-Crehuet

Studies in Engineering and Technology, 2020

View PDFchevron_right

Mechanical Equipment Reliability Analysis: Case Study

Ali Nouri Qarahasanlou

International journal of reliability, risk and safety: theory and application, 2021

View PDFchevron_right

A Time Picture of Work and Transportational Complex Downtime/Failure on Separation of SC Coal Mine „Gračanica“ LLC Gornji Vakuf – Uskoplje

Sunčica Mašić

Glasnik Rudarsko-geološko-građevinskog fakulteta

View PDFchevron_right

Condition-Based Conveyor Belt Replacement Strategy in Lignite Mines with Random Belt Deterioration

Ryszard Blazej

IOP Conference Series: Earth and Environmental Science

View PDFchevron_right

Selection of maintenance range for power machines and equipment in consideration of risk

Andrzej Rusin

2007

View PDFchevron_right

Analysis of Device Failure in the Mechanical Production Plant

Pavol Bozek

Multidisciplinary Aspects of Production Engineering, 2018

View PDFchevron_right

The Effect of Risk Factors on the Resilience of Industrial Equipment

Ali Nouri Qarahasanlou

Springer eBooks, 2022

View PDFchevron_right

Mathematical Model for Determining the Time of Preventive Replacements in the Agricultural Machinery Service System with Minimal Repair

Agnieszka Sołtysiak

Applied Sciences

View PDFchevron_right

Analytical determination of the availability of a rotary excavator as a part of coal mining system: Case study: Rotary excavator SchRs 800.15/1.5 of the Drmno open pit

Ugljesa Bugaric

Mining and Metallurgy Engineering Bor, 2020

View PDFchevron_right

Reliability, Maintainability & Availability analysis of a coal fired power plant in eastern region of India

Dipankar Bose

View PDFchevron_right

Reliability Analysis of Drilling Operation in Open Pit Mines / Analiza niezawodności urządzeń wiertniczych wykorzystywanych w kopalniach odkrywkowych

M. J. Rahimdel

Archives of Mining Sciences, 2013

View PDFchevron_right

Reliability Analysis of Mining Equipment Considering Operational Environments: A Case Study

Javad Barabady

International journal of performability engineering, 2013

View PDFchevron_right

Analysis of reliability and maintainability for multiple repairable units (Case study: Sungun copper mine)

Ali Nouri Qarahasanlou

Journal of Mining and Environment, 2019

View PDFchevron_right

Tracking Failures of Auxiliary Mechanization in an Open-Pit Coal Mine

Sonja Dimitrijevic, Snezana Pantelic

International conference on Applied Internet and Information Technologies AIIT2013, At Zrenjanin, Serbia, 2013

View PDFchevron_right

Investigation of various maintenance parameters for auxiliaries in a coal-handling plant aided by a Visual Basic 6.0–based scheduled program

Jackson Gurung

Engineering Reports (Wiley), 2019

View PDFchevron_right

ARENA simulation of continuous lignite excavation systems

Theodoros Michalakopoulos

View PDFchevron_right