Models for capacitated lot-sizing problem with backlogging, setup carryover and crossover (original) (raw)
Solving the capacitated lot sizing problem with setup carryover using a new sequential hybrid approach
semra tunalı
Applied Intelligence, 2014
View PDFchevron_right
Empirical Evidence of an Efficient Formulation for the Multi-period Setup Carryover Lot Sizing Problem
Harvey Millar
IFIP Advances in Information and Communication Technology, 2013
View PDFchevron_right
A note on "the capacitated lot-sizing and scheduling problem with sequence-dependent setup costs and setup times
Bernardo Almada-Lobo
Computers & Operations Research, 2008
View PDFchevron_right
The capacitated lot sizing problem with overtime decisions and setup times
Linet Özdamar
IIE Transactions, 2000
View PDFchevron_right
IIE Transactions The capacitated lot sizing problem with overtime decisions and setup times
Linet Özdamar
View PDFchevron_right
Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities
Knut Haase
International Journal of Production Economics, 2000
View PDFchevron_right
Multi-Item Capacity Constrained Dynamic Lot-Sizing and Sequencing with Setup Time
Ahsan Hasin
Journal of Mechanical Engineering, 2010
View PDFchevron_right
Rolling-horizon lot-sizing when set-up times are sequence-dependent
Alistair Clark
International Journal of Production …, 2000
View PDFchevron_right
Hybrid heuristics for the capacitated lot sizing and loading problem with setup times and overtime decisions
Linet Ozdamar
European Journal of Operational Research, 1998
View PDFchevron_right
Capacitated lot sizing under setup learning
Amitabh Raturi, Eleni Pratsini
European Journal of Operational Research, 1994
View PDFchevron_right
An Efficient MIP Model for the Capacitated Lot-sizing and Scheduling Problem with Sequence-dependent Setups," A. Kovacs, K. Brown and S. A. Tarim, International Journal of Production Economics, 118, pp.282-291, 2009
S. Armagan Tarim
View PDFchevron_right
Capacitated lot-sizing and scheduling with sequence-dependent, period-overlapping and non-triangular setups
Alistair Clark
2011
View PDFchevron_right
An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
Joseph Geunes
European Journal of Operational Research, 2011
View PDFchevron_right
An efficient MIP model for the capacitated lot-sizing and scheduling problem with sequence-dependent setups
S. Armagan Tarim
International Journal of Production Economics, 2009
View PDFchevron_right
Three Mathematical Models for a Integrated Lot Sizing and Scheduling Problem
Socorro Rangel
2014
View PDFchevron_right
A Lagrangean relaxation approach for capacitated lot sizing problem with setup times
Jaideep Motwani
International Journal of Operational Research, 2013
View PDFchevron_right
Multi item multi period capacitated lot sizing problem with backorders and setup considerations: strong and weak formulations
Mayank Verma
2010
View PDFchevron_right
On alternative mixed integer programming formulations and LP-based heuristics for lot-sizing with setup times
Haldun Sural
Journal of the Operational Research Society, 2006
View PDFchevron_right
Multi-item lot-sizing with joint set-up costs
Michal Tzur
Mathematical Programming, 2009
View PDFchevron_right
A New Branching Rule to Solve the Capacitated Lot Sizing and Scheduling Problem with Sequence Dependent Setups
Willy Oliveira
TEMA (São Carlos), 2018
View PDFchevron_right
Production Lot Sizing and Scheduling with Non-Triangular Sequence-Dependent Setup Times
Masoumeh Mahdieh
2012
View PDFchevron_right
The capacitated lot sizing problem: a review of models and algorithms
Behrooz Karimi
Omega-international Journal of Management Science, 2003
View PDFchevron_right
International Journal of Production Research Modeling industrial lot sizing problems: a review Raf Jans & Zeger Degraeve Modeling industrial lot sizing problems: a review
Ayesha Alam
View PDFchevron_right
Setup Cost Reduction in (Q, r) Policy with Lot Size, Setup Time and Lead-Time Interactions
Moncer Hariga
The Journal of the Operational Research Society, 2000
View PDFchevron_right
Capacitated Two-Stage Multi-Item Production/Inventory Model with Joint Setup Costs
shoshi anily
Operations Research, 1991
View PDFchevron_right