Contamination at a Megasite Scale (original) (raw)

paper cover icon

Contamination at a Megasite Scale

2015

Janusz KrupanekJanusz Krupanek

Abstract

Abstract: To manage complex groundwater problems at the so-called megasites, a risk-based Integrated Management Strategy (IMS) of the European WELCOME project is currently applied to three megasites in Tarnowskie Góry (PL), Bitterfeld (D) and Port of Rotterdam (NL).

Janusz Krupanek hasn't uploaded this paper.

Let Janusz know you want this paper to be uploaded.

Ask for this paper to be uploaded.