Cameron Britt, P.E. - WWC Engineering | LinkedIn (original) (raw)
Casper, Wyoming, United States Contact Info
237 followers 234 connections
Activity
Experience & Education
WWC Engineering
View Cameron’s full experience
See their title, tenure and more.
More activity by Cameron
View Cameron’s full profile
Other similar profiles
Explore more posts
- Christian H. Small tip for how I make quicker H&H model updates… Right now, I’m working on a project that uses a 2-D PCSWMM model. It has: 1,200 junctions 50 MILES of conduits 121,000 2-D nodes Not surprisingly, it functions slower than I’d like… 😣 Here’s what I do to make my model updates quicker. (Things like: adding more pipes, streams, retention basins, or refining and breaking up subcatchments.). I build the updates in a separate “blank” model that doesn’t have any of the 2-D components. Then, once I’m done building the new components, I bring them into the larger model. I don’t have to deal with a slower moving model. And I can do updates and finish QA/QC on the new bits much quicker. It might seem obvious, but it makes a big time difference and doesn’t test my patience.
- Selçuk Doğulu The biggest industrial "divorce" is about to happen. Iron, the father, is separating from Steel, the mother. However, Iron has promised to continue supporting by providing feed in the form of HBI (Hot Briquetted Iron). The Downstream, their children will stay with their mother for now. Rising energy and labor costs in Japan, Europe, and several other regions have made traditional iron-making no longer feasible. As a result, new eco-friendly iron hub projects are being developed in areas where current energy costs remain reasonable and, more importantly, where there is significant potential for low-cost renewable energy. This shift is occurring much faster than anyone anticipated. This will create a significant business opportunity for companies that act quickly. P.S. : Our couple gives a sad impression because they were living happily together in an “integrated” form for centuries. No worries, this is not a sad story, will have a happy ending, especially for the family’s sustainability and the children’s benefit. Illustration credit: Gencraft based on my description. #iron and #steel #decarbonization #sustainability #emiratessteel #uae #abudhabi #middleeast #europe #japan #industry #mena #türkiye #germany #austria #netherlands #sweden #italy #belgium #france #luxembourg
- Steven M. Rienks, P.E., PMP For those of us involved in the SUE (Subsurface Utility Engineering) profession… Illinois DOT has included the following contract language in their Scope of Work: “Subsurface Utility Engineering (SUE) standards referred to within this scope of work are in accordance with the ASCE/UESI/CI 38-22 Standard Guideline for Investigating and Documenting Existing Utilities.” What does the Utility Report to IDOT include? Refer to ASCE/UESI/CI 38-22 Chapter C4 Engineer and Owner Tasks. C4.1.16 Preparing the Utility Report. The Utility Report should include the following, but not necessarily all, inclusive information: • Project description (e.g., project limits, type of work, existing utilities); • Contract requirements relative to utilities; • Metadata; • Methods used to collect and depict subsurface Utility information; • List of Utility Owners or other entities that have information on utilities within the project limits that were contacted and results of the contact; • Description of the types and thoroughness of research applied to obtain information from the Utility Owners and other entities; • Types of equipment selected and used to collect information; • Types of software used to depict information; • Areas swept, areas, not swept, and suspect areas; • Utilities found and documented (type, attributes, etc.); • Linear feet designated, number of Test Holes excavated, and other pertinent results; • Problems encountered and unresolved issues (such as unidentified utilities, inconclusive information, or conflicting information); • Detailed efforts and actions taken to identify ownership and type of designated unknown utilities; • Conflict analysis setup (e.g., Utility conflict matrix, potential conflicts, resolved conflicts, or remaining conflicts to be addressed during design) if part of the Scope of Work; • Recommended additional or future work; and • Pictures, images, and lidar data that may convey information more accurately than graphical deliverables. Tell us which other State DOTs have this contract language. #asce/uesi/ci 38-22
Explore collaborative articles
We’re unlocking community knowledge in a new way. Experts add insights directly into each article, started with the help of AI.