Test MATLAB Job Scheduler Cluster Connectivity in Admin Center - MATLAB & Simulink (original) (raw)

Main Content

Admin Center lets you test communications between your MATLAB® Job Scheduler node, worker nodes, and the node where Admin Center is running.

The tests check these areas of connectivity in the cluster:

First click Test Connectivity to open the Connectivity Testing dialog box. By default, the dialog box displays the results of the last test. To run new tests and update the display, click Run.

During test execution, Admin Center displays a progress dialog box.

Progress of connectivity testing

When the tests are complete, the Running Tests dialog box automatically closes and Admin Center displays the test results in the Connectivity Testing dialog box.

Results of connectivity test

The possible test result symbols are described in the following table.

Test Result Description
Test passed.
Test passed, extra information is available.
Test passed, but generated a warning.
Test failed.
Test was skipped, possibly because prerequisite tests did not pass.

Tests that include failures or other results might look like the following figure.

Results of connectivity test with some failures

To get details about the test results, double-click any of the symbols in the test results. To see the raw data from the tests, use the Log tab.

The results of the tests that run on only the client are in the lower-left corner of the dialog box. To get details about the client-only test results, click More Info.

See Also

Topics