La Barrancosa Dam (original) (raw)
The La Barrancosa Dam, formerly known as Jorge Cepernic Dam, is a concrete-face rock-fill dam being built on the Santa Cruz River about 115 km (71 mi) west of Puerto Santa Cruz in Santa Cruz Province, Argentina. It was renamed after the former governor of Santa Cruz Jorge Cepernic. A consortium led by China's Gezhouba Group was awarded the contract to build the Jorge Cepernic Dam and the Néstor Kirchner Dam upstream in August 2013. The consortium will also fund the construction. Both dams are expected to cost nearly US$4.8 billion. It will be built by the firm Electroingeniería, led by Osvaldo Acosta and Gerardo Ferreyra. The primary purpose of the dam is hydroelectric power generation and its power station will have an installed capacity of 600 MW.
Property | Value |
---|---|
dbo:Infrastructure/length | 2.9 |
dbo:abstract | The La Barrancosa Dam, formerly known as Jorge Cepernic Dam, is a concrete-face rock-fill dam being built on the Santa Cruz River about 115 km (71 mi) west of Puerto Santa Cruz in Santa Cruz Province, Argentina. It was renamed after the former governor of Santa Cruz Jorge Cepernic. A consortium led by China's Gezhouba Group was awarded the contract to build the Jorge Cepernic Dam and the Néstor Kirchner Dam upstream in August 2013. The consortium will also fund the construction. Both dams are expected to cost nearly US$4.8 billion. It will be built by the firm Electroingeniería, led by Osvaldo Acosta and Gerardo Ferreyra. The primary purpose of the dam is hydroelectric power generation and its power station will have an installed capacity of 600 MW. In July 2015 machines arrived in Santa Cruz for the construction of the dams. (en) ГЕС Ла-Барранкоса (ісп. La Barrancosa) — гідроелектростанція, що споруджується у південній Аргентині в провінції Санта-Крус. Знаходячись нижче від місця будівництва ГЕС Кондор-Кліфф, становитиме нижній ступінь у каскаді на річці Санта-Крус, яка тече з Анд на схід в Атлантичний океан. Проект передбачав зведення кам'яно-накидної греблі з бетонним облицюванням висотою 44 метри та встановлення п'яти турбін загальною потужністю 600 МВт. Проте у виданому в 2013 році дозволі Міністерства федерального планування висоту цієї споруди зменшили до 41 метра при довжині 2445 метрів, а загальну потужність станції визначили як 360 МВт (три турбіни). Машинний зал обладнають турбінами типу Каплан, які при напорі у 34,7 метра забезпечуватимуть виробництво 1921 млн кВт-год електроенергії на рік. Видача продукції здійснюватиметься до підстанції 132/500 кВ. За часів президентства Крістіни Кіршнер ГЕС була перейменована на честь губернатора провінції Санта-Крус Хорхе Сеперника, який помер 2010 року. 1 листопада 2017 року президент Маурісіо Макрі своїм указом повернув ГЕС початкову назву Ла-Барранкоса. Будівництво розпочалося у липні 2015 року. Завершення проекту очікується у 2022 році. (uk) |
dbo:buildingStartDate | July 2015 |
dbo:buildingStartYear | 2015-01-01 (xsd:gYear) |
dbo:description | Embankment, concrete-face rock-fill (en) |
dbo:height | 43.500000 (xsd:double) |
dbo:lake | dbr:La_Barrancosa_Dam__Lake__1 |
dbo:length | 2900.000000 (xsd:double) |
dbo:location | dbr:Puerto_Santa_Cruz dbr:Santa_Cruz_Province,_Argentina |
dbo:part | dbr:La_Barrancosa_Dam__PowerStation__1 |
dbo:purpose | Power |
dbo:river | dbr:Santa_Cruz_River_(Argentina) |
dbo:status | UC |
dbo:volume | 6900000.000000 (xsd:double) |
dbo:wikiPageID | 42607541 (xsd:integer) |
dbo:wikiPageLength | 4552 (xsd:nonNegativeInteger) |
dbo:wikiPageRevisionID | 941946658 (xsd:integer) |
dbo:wikiPageWikiLink | dbr:Puerto_Santa_Cruz dbr:Santa_Cruz_Province,_Argentina dbr:Santa_Cruz_River_(Argentina) dbr:Hydroelectric dbr:Jorge_Cepernic dbr:Néstor_Kirchner_Dam dbr:Gezhouba_Group dbc:Buildings_and_structures_in_Santa_Cruz_Province,_Argentina dbc:Buildings_and_structures_under_construction_in_Argentina dbc:Concrete-face_rock-fill_dams dbc:Dams_in_Argentina dbr:Watt dbc:Dams_under_construction dbr:Concrete-face_rock-fill_dam dbr:Kaplan-type |
dbp:constructionBegan | July 2015 (en) |
dbp:country | Argentina (en) |
dbp:damCrosses | dbr:Santa_Cruz_River_(Argentina) |
dbp:damType | Embankment, concrete-face rock-fill (en) |
dbp:location | dbr:Puerto_Santa_Cruz dbr:Santa_Cruz_Province,_Argentina |
dbp:locationMap | Argentina (en) |
dbp:name | Jorge Cepernic Dam (en) |
dbp:plantAnnualGen | 1866.0 |
dbp:plantCapacity | 600.0 |
dbp:plantTurbines | 5 (xsd:integer) |
dbp:purpose | Power (en) |
dbp:status | UC (en) |
dbp:wikiPageUsesTemplate | dbt:Convert dbt:Coord dbt:Reflist dbt:Infobox_dam dbt:Argentina-struct-stub |
dcterms:subject | dbc:Buildings_and_structures_in_Santa_Cruz_Province,_Argentina dbc:Buildings_and_structures_under_construction_in_Argentina dbc:Concrete-face_rock-fill_dams dbc:Dams_in_Argentina dbc:Dams_under_construction |
georss:point | -50.19215555555556 -70.12073333333333 |
rdf:type | owl:Thing dbo:Infrastructure wikidata:Q12323 dbo:Dam geo:SpatialThing dbo:ArchitecturalStructure |
rdfs:comment | The La Barrancosa Dam, formerly known as Jorge Cepernic Dam, is a concrete-face rock-fill dam being built on the Santa Cruz River about 115 km (71 mi) west of Puerto Santa Cruz in Santa Cruz Province, Argentina. It was renamed after the former governor of Santa Cruz Jorge Cepernic. A consortium led by China's Gezhouba Group was awarded the contract to build the Jorge Cepernic Dam and the Néstor Kirchner Dam upstream in August 2013. The consortium will also fund the construction. Both dams are expected to cost nearly US$4.8 billion. It will be built by the firm Electroingeniería, led by Osvaldo Acosta and Gerardo Ferreyra. The primary purpose of the dam is hydroelectric power generation and its power station will have an installed capacity of 600 MW. (en) ГЕС Ла-Барранкоса (ісп. La Barrancosa) — гідроелектростанція, що споруджується у південній Аргентині в провінції Санта-Крус. Знаходячись нижче від місця будівництва ГЕС Кондор-Кліфф, становитиме нижній ступінь у каскаді на річці Санта-Крус, яка тече з Анд на схід в Атлантичний океан. Машинний зал обладнають турбінами типу Каплан, які при напорі у 34,7 метра забезпечуватимуть виробництво 1921 млн кВт-год електроенергії на рік. Видача продукції здійснюватиметься до підстанції 132/500 кВ. Будівництво розпочалося у липні 2015 року. Завершення проекту очікується у 2022 році. (uk) |
rdfs:label | La Barrancosa Dam (en) ГЕС Ла-Барранкоса (uk) |
owl:sameAs | wikidata:La Barrancosa Dam dbpedia-fa:La Barrancosa Dam dbpedia-uk:La Barrancosa Dam https://global.dbpedia.org/id/f77F |
geo:geometry | POINT(-70.120735168457 -50.192153930664) |
geo:lat | -50.192154 (xsd:float) |
geo:long | -70.120735 (xsd:float) |
prov:wasDerivedFrom | wikipedia-en:La_Barrancosa_Dam?oldid=941946658&ns=0 |
foaf:isPrimaryTopicOf | wikipedia-en:La_Barrancosa_Dam |
foaf:name | Jorge Cepernic Dam (en) |
is dbo:wikiPageRedirects of | dbr:Jorge_Cepernic_(dam) dbr:Jorge_Cepernic_Dam |
is dbo:wikiPageWikiLink of | dbr:List_of_projects_of_the_Belt_and_Road_Initiative dbr:Lázaro_Báez dbr:Jorge_Cepernic_(dam) dbr:Jorge_Cepernic_Dam |
is foaf:primaryTopic of | wikipedia-en:La_Barrancosa_Dam |