dbo:abstract |
Memve'ele Hydroelectric Power Station is a 211 megawatt hydroelectric power station in Cameroon. Construction of this dam began in April 2012 and the dam produced its first 80 megawatts in April 2019. Full commercial operations are expected to begin once the 225 kiloVolt high voltage transmission line to Yaounde is completed. (en) |
dbo:buildingStartDate |
June 2012 |
dbo:buildingStartYear |
2012-01-01 (xsd:gYear) |
dbo:country |
dbr:Cameroon |
dbo:location |
dbr:Vallée-du-Ntem dbr:South_Region_(Cameroon) |
dbo:openingYear |
2019-01-01 (xsd:gYear) |
dbo:owner |
dbr:Government_of_Cameroon |
dbo:part |
dbr:Memve'ele_Hydroelectric_Power_Station__PowerStation__1 |
dbo:purpose |
P |
dbo:river |
dbr:Ntem_River |
dbo:status |
O |
dbo:wikiPageExternalLink |
http://arsel-cm.org/provisional-reception-of-the-memveele-hydroelectric-dam/%3Flang=en |
dbo:wikiPageID |
70044874 (xsd:integer) |
dbo:wikiPageLength |
8748 (xsd:nonNegativeInteger) |
dbo:wikiPageRevisionID |
1071310851 (xsd:integer) |
dbo:wikiPageWikiLink |
dbr:Cameroon dbc:Energy_infrastructure_under_construction dbr:Vallée-du-Ntem dbr:List_of_power_stations_in_Cameroon dbr:Nachtigal_Hydroelectric_Power_Station dbr:Consortium dbc:Power_stations_in_Cameroon dbr:Sinohydro dbc:Hydroelectric_power_stations_in_Cameroon dbr:African_Development_Bank dbr:Ebolowa dbr:Exim_Bank_of_China dbr:Government_of_Cameroon dbc:South_Region_(Cameroon) dbr:South_Region_(Cameroon) dbr:Yaounde dbr:Yaoundé dbr:Engineering,_procurement_and_construction dbr:Ntem_River |
dbp:constructionBegan |
June 2012 (en) |
dbp:cost |
8.316E8 |
dbp:country |
dbr:Cameroon |
dbp:damCrosses |
dbr:Ntem_River |
dbp:location |
Nyabissan, Ntem Valey Département, South Region (Cameroon) (en) |
dbp:locationMap |
Cameroon#Africa#World (en) |
dbp:locationMapCaption |
Map of Cameroon showing the location of Memve'ele HPP (en) |
dbp:name |
Memve'ele Hydroelectric Power Station (en) |
dbp:opening |
April 2019 (en) |
dbp:operator |
Electricity Development Corporation (en) |
dbp:owner |
dbr:Government_of_Cameroon |
dbp:plantAnnualGen |
1187.0 |
dbp:plantCommission |
December 2022 Expected (en) |
dbp:purpose |
P (en) |
dbp:status |
O (en) |
dbp:wikiPageUsesTemplate |
dbt:Authority_control dbt:Convert dbt:Coord dbt:EngvarB dbt:Portal dbt:Reflist dbt:Short_description dbt:Stack dbt:Use_dmy_dates dbt:Infobox_dam |
dcterms:subject |
dbc:Energy_infrastructure_under_construction dbc:Power_stations_in_Cameroon dbc:Hydroelectric_power_stations_in_Cameroon dbc:South_Region_(Cameroon) |
georss:point |
2.3963888888888887 10.398888888888889 |
rdf:type |
owl:Thing dbo:Infrastructure wikidata:Q12323 dbo:Dam geo:SpatialThing dbo:ArchitecturalStructure |
rdfs:comment |
Memve'ele Hydroelectric Power Station is a 211 megawatt hydroelectric power station in Cameroon. Construction of this dam began in April 2012 and the dam produced its first 80 megawatts in April 2019. Full commercial operations are expected to begin once the 225 kiloVolt high voltage transmission line to Yaounde is completed. (en) |
rdfs:label |
Memve'ele Hydroelectric Power Station (en) |
owl:sameAs |
wikidata:Memve'ele Hydroelectric Power Station https://global.dbpedia.org/id/GUz34 |
geo:geometry |
POINT(10.398888587952 2.3963890075684) |
geo:lat |
2.396389 (xsd:float) |
geo:long |
10.398889 (xsd:float) |
prov:wasDerivedFrom |
wikipedia-en:Memve'ele_Hydroelectric_Power_Station?oldid=1071310851&ns=0 |
foaf:isPrimaryTopicOf |
wikipedia-en:Memve'ele_Hydroelectric_Power_Station |
foaf:name |
Memve'ele Hydroelectric Power Station (en) |
is dbo:wikiPageWikiLink of |
dbr:Nachtigal_Hydroelectric_Power_Station |
is foaf:primaryTopic of |
wikipedia-en:Memve'ele_Hydroelectric_Power_Station |