dbo:Infrastructure/length |
0.525 (dbd:kilometre) |
dbo:abstract |
Le pont de Jinja, aussi appelé nouveau pont de Jinja, est un pont en construction dans la ville de Jinja en Ouganda. Il enjambe le Nil. Il doit servir de complément au pont situé sur le barrage des chutes d'Owen. 80 % du financement du barrage est d'origine japonaise via des prêts à taux zéro. Le restant est financé par l'état ougandais. Son coût est estimé à 125 millions de dollars. Sa construction a démarré en janvier 2014. * Portail des ponts * Portail de l’Ouganda (fr) The Source of the Nile Bridge, also New Jinja Bridge, which was commissioned on 17 October 2018, by the President of Uganda, is a cable-stayed bridge across the Victoria Nile in Uganda. It replaced the Nalubaale Bridge, which was built in 1954. (en) |
dbo:bridgeCarries |
Kampala–Jinja Expressway |
dbo:buildingStartDate |
January 2014 |
dbo:constructionMaterial |
dbr:Concrete dbr:Steel |
dbo:crosses |
dbr:Victoria_Nile |
dbo:length |
525.000000 (xsd:double) |
dbo:locatedInArea |
dbr:Uganda dbr:Njeru |
dbo:openingDate |
2018-10-17 (xsd:date) |
dbo:openingYear |
2018-01-01 (xsd:gYear) |
dbo:type |
dbr:Cable-stayed_bridge |
dbo:wikiPageExternalLink |
http://lesaspin2010.blogspot.com/2011/04/japan-to-fund-new-jinja-bridge.html http://www.aircargonews.net/news/single-view/news/emirates-bridges-the-gap-for-uganda.html%3FContinue=1 http://www.zenitaka.co.jp/english/works3.html http://www.worldhighways.com/sections/emergent/features/new-bridge-over-nile-will-help-landlocked-uganda https://www.google.com/search%3Fq=new+jinja+bridge&rlz=1C1CHBF_enUS814US814&source=lnms&tbm=isch&sa=X&ved=0ahUKEwiC98XBnOPdAhUJP60KHcKbAFEQ_AUIECgD&biw=780&bih=358 http://www.observer.ug/index.php%3Foption=com_content&view=article&id=10769:japan-finances-new-nile-bridge&catid=38:business&Itemid=68 http://www.monitor.co.ug/News/National/New-Nile-bridge-course-Unra/-/688334/3157886/-/866308z/-/index.html |
dbo:wikiPageID |
29464844 (xsd:integer) |
dbo:wikiPageLength |
14100 (xsd:nonNegativeInteger) |
dbo:wikiPageRevisionID |
1112996269 (xsd:integer) |
dbo:wikiPageWikiLink |
dbr:Cable-stayed_bridge dbr:President_of_Uganda dbc:Bridges_in_Uganda dbr:Democratic_Republic_of_the_Congo dbr:Uganda dbr:Uganda_National_Roads_Authority dbr:List_of_roads_in_Uganda dbr:Matadi dbr:Northern_Corridor dbr:Government_of_Japan dbr:Concrete dbc:Bridges_completed_in_2018 dbr:Boda_boda dbr:Yoweri_Museveni dbc:Bridges_over_the_Nile dbr:Njeru dbr:Parliament_of_Uganda dbr:Kampala–Jinja_Expressway dbr:Kampala–Jinja_Highway dbr:Steel dbr:Japan_International_Cooperation_Agency dbr:Atlantic_Ocean dbc:Cable-stayed_bridges dbr:Jinja,_Uganda dbr:Kampala dbr:The_Observer_(Uganda) dbc:Buikwe_District dbc:Jinja_District dbc:2018_establishments_in_Uganda dbc:Jinja,_Uganda dbr:Government_of_Uganda dbr:Hyundai_Engineering_&_Construction dbr:Indian_Ocean dbr:New_Karuma_Bridge dbr:Mukono–Kayunga–Njeru_Road dbr:Mukono–Kyetume–Katosi–Nyenga_Road dbr:Source_of_the_Nile dbr:Victoria_Nile dbr:Mombasa,_Kenya dbr:Uganda_Railways dbr:Nalubaale_Power_Station |
dbp:begin |
January 2014 (en) |
dbp:bridgeName |
Source of the Nile Bridge (en) |
dbp:carries |
dbr:Kampala–Jinja_Expressway |
dbp:crosses |
dbr:Victoria_Nile |
dbp:design |
dbr:Cable-stayed_bridge |
dbp:locale |
Njeru, Uganda to Jinja, Uganda (en) |
dbp:material |
dbr:Concrete dbr:Steel |
dbp:officialName |
Source of The Nile Bridge (en) |
dbp:open |
2018-10-17 (xsd:date) |
dbp:wikiPageUsesTemplate |
dbt:Authority_control dbt:Convert dbt:Coord dbt:Infobox_Bridge dbt:Reflist dbt:Short_description dbt:Jinja_District dbt:Buikwe_District |
dct:subject |
dbc:Bridges_in_Uganda dbc:Bridges_completed_in_2018 dbc:Bridges_over_the_Nile dbc:Cable-stayed_bridges dbc:Buikwe_District dbc:Jinja_District dbc:2018_establishments_in_Uganda dbc:Jinja,_Uganda |
georss:point |
0.438611 33.1875 |
rdf:type |
owl:Thing dbo:Infrastructure dbo:RouteOfTransportation wikidata:Q12280 geo:SpatialThing dbo:ArchitecturalStructure dbo:Bridge |
rdfs:comment |
Le pont de Jinja, aussi appelé nouveau pont de Jinja, est un pont en construction dans la ville de Jinja en Ouganda. Il enjambe le Nil. Il doit servir de complément au pont situé sur le barrage des chutes d'Owen. 80 % du financement du barrage est d'origine japonaise via des prêts à taux zéro. Le restant est financé par l'état ougandais. Son coût est estimé à 125 millions de dollars. Sa construction a démarré en janvier 2014. * Portail des ponts * Portail de l’Ouganda (fr) The Source of the Nile Bridge, also New Jinja Bridge, which was commissioned on 17 October 2018, by the President of Uganda, is a cable-stayed bridge across the Victoria Nile in Uganda. It replaced the Nalubaale Bridge, which was built in 1954. (en) |
rdfs:label |
Pont de Jinja (fr) Source of the Nile Bridge (en) |
owl:sameAs |
wikidata:Source of the Nile Bridge dbpedia-fr:Source of the Nile Bridge https://global.dbpedia.org/id/TkW3 |
geo:geometry |
POINT(33.1875 0.43861100077629) |
geo:lat |
0.438611 (xsd:float) |
geo:long |
33.187500 (xsd:float) |
prov:wasDerivedFrom |
wikipedia-en:Source_of_the_Nile_Bridge?oldid=1112996269&ns=0 |
foaf:isPrimaryTopicOf |
wikipedia-en:Source_of_the_Nile_Bridge |
foaf:name |
Source of the Nile Bridge (en) Source of The Nile Bridge (en) |
is dbo:wikiPageRedirects of |
dbr:New_Jinja_Bridge |
is dbo:wikiPageWikiLink of |
dbr:List_of_bridges_in_Uganda dbr:Karuma–Olwiyo–Pakwach–Nebbi–Arua_Road dbr:Nile dbr:Njeru dbr:Jinja,_Uganda dbr:Kiira_Motors_Corporation dbr:Nyenga,_Uganda dbr:New_Jinja_Bridge |
is foaf:primaryTopic of |
wikipedia-en:Source_of_the_Nile_Bridge |