dbo:abstract |
Yangcheng Power Station (Chinese: 阳城电厂) is a coal-fired power station in Beiliu, Shanxi, China. It has an installed capacity of 3,300 MW. The plant was first commissioned in 1996. Construction on phase one of the plant began in 2001 and ended in 2007. The plant is the site of the world's two largest dry cooling towers. (en) |
dbo:buildingStartDate |
2002 |
dbo:buildingStartYear |
2002-01-01 (xsd:gYear) |
dbo:country |
dbr:People's_Republic_of_China |
dbo:installedCapacity |
3300000000.000000 (xsd:double) |
dbo:location |
dbr:Shanxi |
dbo:openingYear |
1996-01-01 (xsd:gYear) |
dbo:owner |
dbr:Datang_International_Power_Generation_Company |
dbo:status |
Operational |
dbo:wikiPageID |
69656696 (xsd:integer) |
dbo:wikiPageLength |
2179 (xsd:nonNegativeInteger) |
dbo:wikiPageRevisionID |
1063702386 (xsd:integer) |
dbo:wikiPageWikiLink |
dbr:Beiliu,_Shanxi dbr:List_of_coal_power_stations dbr:List_of_power_stations_in_China dbr:People's_Republic_of_China dbr:Cooling_tower dbr:Megawatt dbr:List_of_largest_power_stations_in_the_world dbr:1996 dbr:Datang_International_Power_Generation_Company dbc:Coal-fired_power_stations_in_China dbr:2002 dbr:China dbr:Coal dbc:Buildings_and_structures_in_Shanxi dbr:Shanxi |
dbp:commissioned |
1996 (xsd:integer) |
dbp:constructionBegan |
2002 (xsd:integer) |
dbp:country |
dbr:People's_Republic_of_China |
dbp:location |
dbr:Shanxi |
dbp:name |
Yangcheng Power Station (en) 阳城电厂 (en) |
dbp:owner |
dbr:Datang_International_Power_Generation_Company |
dbp:psElectricalCapacity |
3300.0 (dbd:megawatt) |
dbp:psUnitsOperational |
2 (xsd:integer) 6 (xsd:integer) |
dbp:status |
Operational (en) |
dbp:thFuelPrimary |
dbr:Coal |
dbp:wikiPageUsesTemplate |
dbt:PRChina-powerstation-stub dbt:Coord dbt:Portal dbt:Reflist dbt:Short_description dbt:Zh dbt:Infobox_power_station |
dct:subject |
dbc:Coal-fired_power_stations_in_China dbc:Buildings_and_structures_in_Shanxi |
georss:point |
35.466944444444444 112.5725 |
rdf:type |
owl:Thing dbo:Infrastructure wikidata:Q159719 geo:SpatialThing dbo:ArchitecturalStructure dbo:PowerStation |
rdfs:comment |
Yangcheng Power Station (Chinese: 阳城电厂) is a coal-fired power station in Beiliu, Shanxi, China. It has an installed capacity of 3,300 MW. The plant was first commissioned in 1996. Construction on phase one of the plant began in 2001 and ended in 2007. The plant is the site of the world's two largest dry cooling towers. (en) |
rdfs:label |
Yangcheng Power Station (en) |
owl:sameAs |
wikidata:Yangcheng Power Station https://global.dbpedia.org/id/GFkAa |
geo:geometry |
POINT(112.57250213623 35.466945648193) |
geo:lat |
35.466946 (xsd:float) |
geo:long |
112.572502 (xsd:float) |
prov:wasDerivedFrom |
wikipedia-en:Yangcheng_Power_Station?oldid=1063702386&ns=0 |
foaf:isPrimaryTopicOf |
wikipedia-en:Yangcheng_Power_Station |
foaf:name |
Yangcheng Power Station (en) 阳城电厂 (en) |
is dbo:wikiPageWikiLink of |
dbr:List_of_coal-fired_power_stations dbr:List_of_power_stations_in_China dbr:List_of_major_power_stations_in_Shanxi |
is foaf:primaryTopic of |
wikipedia-en:Yangcheng_Power_Station |