The Zongo II Power Station, also Zongo 2 Power Station, is a hydroelectric power station across the Inkisi River that harnesses the energy of the Zongo Falls in the Democratic Republic of the Congo. Construction began on 14 March 2012 and concluded in 2018. The power station was officially inaugurated on 22 June 2018 by the President of the DR Congo, at that time, Joseph Kabila.
Property | Value |
---|---|
dbo:abstract | The Zongo II Power Station, also Zongo 2 Power Station, is a hydroelectric power station across the Inkisi River that harnesses the energy of the Zongo Falls in the Democratic Republic of the Congo. Construction began on 14 March 2012 and concluded in 2018. The power station was officially inaugurated on 22 June 2018 by the President of the DR Congo, at that time, Joseph Kabila. (en) ГЕС Зонго II — гідроелектростанція на заході Демократичної Республіки Конго. Розташована після ГЕС Зонго I, становить нижній ступінь каскаду на річці (ліва притока Конго). У межах проекту Інкісі перекрили гравітаційною греблею висотою 25 метрів. Вона спрямовує воду до дериваційного тунелю, що прямує приблизно 3 км через пагорб на лівобережжі Інкісі, який відділяє її нижню течію від Конго. Машинний зал буде обладнано трьома турбінами потужністю по 50 МВт, які працюватимуть при напорі у 105 метрів. Відпрацьована вода потраплятиме одразу в Конго. Спорудження станції здійснює китайська корпорація Sinohydro, а фінансування у розмірі 360 млн доларів США забезпечив Експортно-імпортній банк Китаю. Гідроагрегат № 3 запустили в роботу у вересні 2017 року. На той час готовність двох інших гадроагрегатів становила 45 % та 65 %. (uk) |
dbo:buildingStartDate | 2012 |
dbo:buildingStartYear | 2012-01-01 (xsd:gYear) |
dbo:description | Gravity dam (en) |
dbo:location | dbr:Democratic_Republic_of_the_Congo dbr:Kongo_Central |
dbo:openingYear | 2018-01-01 (xsd:gYear) |
dbo:part | dbr:Zongo_II_Hydroelectric_Power_Station__PowerStation__1 |
dbo:river | dbr:Inkisi_River |
dbo:wikiPageExternalLink | https://www.zawya.com/mena/en/project/090720013743/150-mw-zongo-ii-hydropower-project/ |
dbo:wikiPageID | 68067943 (xsd:integer) |
dbo:wikiPageLength | 7092 (xsd:nonNegativeInteger) |
dbo:wikiPageRevisionID | 1030861288 (xsd:integer) |
dbo:wikiPageWikiLink | dbr:Democratic_Republic_of_the_Congo dbc:Energy_infrastructure_completed_in_2018 dbr:Joseph_Kabila dbr:Inkisi_River dbr:List_of_power_stations_in_the_Democratic_Republic_of_the_Congo dbr:Congo_River dbr:Matadi dbr:Engineering,_procurement,_and_construction dbr:Sinohydro dbr:Power_purchase_agreement dbc:Hydroelectric_power_stations_in_the_Democratic_Republic_of_the_Congo dbr:Exim_Bank_of_China dbr:Gravity_dam dbc:2018_establishments_in_the_Democratic_Republic_of_the_Congo dbr:Atlantic_Ocean dbc:Kongo_Central dbr:Société_Nationale_d'Électricité dbr:Kinshasa dbr:Kongo_Central |
dbp:constructionBegan | 2012 (xsd:integer) |
dbp:cost | 3.6E8 (dbd:usDollar) |
dbp:damCrosses | dbr:Inkisi_River |
dbp:damType | dbr:Gravity_dam |
dbp:location | Zongo, Central Kongo Province, Democratic Republic of the Congo (en) |
dbp:locationMap | Democratic Republic of the Congo#Africa#World (en) |
dbp:locationMapCaption | Placement on map is approximate (en) Location of Zongo II Power Station (en) |
dbp:name | Zongo II Dam (en) |
dbp:opening | 2018 (xsd:integer) |
dbp:plantCommission | 2018 (xsd:integer) |
dbp:plantTurbines | 3 (xsd:integer) |
dbp:wikiPageUsesTemplate | dbt:Authority_control dbt:Convert dbt:Coord dbt:EngvarB dbt:Portal dbt:Reflist dbt:Short_description dbt:Stack dbt:Use_dmy_dates dbt:Kongo_Central dbt:Infobox_dam |
dct:subject | dbc:Energy_infrastructure_completed_in_2018 dbc:Hydroelectric_power_stations_in_the_Democratic_Republic_of_the_Congo dbc:2018_establishments_in_the_Democratic_Republic_of_the_Congo dbc:Kongo_Central |
georss:point | -4.7825 14.90611111111111 |
rdf:type | owl:Thing dbo:Infrastructure wikidata:Q12323 dbo:Dam geo:SpatialThing dbo:ArchitecturalStructure |
rdfs:comment | The Zongo II Power Station, also Zongo 2 Power Station, is a hydroelectric power station across the Inkisi River that harnesses the energy of the Zongo Falls in the Democratic Republic of the Congo. Construction began on 14 March 2012 and concluded in 2018. The power station was officially inaugurated on 22 June 2018 by the President of the DR Congo, at that time, Joseph Kabila. (en) ГЕС Зонго II — гідроелектростанція на заході Демократичної Республіки Конго. Розташована після ГЕС Зонго I, становить нижній ступінь каскаду на річці (ліва притока Конго). У межах проекту Інкісі перекрили гравітаційною греблею висотою 25 метрів. Вона спрямовує воду до дериваційного тунелю, що прямує приблизно 3 км через пагорб на лівобережжі Інкісі, який відділяє її нижню течію від Конго. Машинний зал буде обладнано трьома турбінами потужністю по 50 МВт, які працюватимуть при напорі у 105 метрів. Відпрацьована вода потраплятиме одразу в Конго. (uk) |
rdfs:label | Zongo II Hydroelectric Power Station (en) ГЕС Зонго II (uk) |
owl:sameAs | wikidata:Zongo II Hydroelectric Power Station dbpedia-uk:Zongo II Hydroelectric Power Station https://global.dbpedia.org/id/7EGdx |
geo:geometry | POINT(14.90611076355 -4.7824997901917) |
geo:lat | -4.782500 (xsd:float) |
geo:long | 14.906111 (xsd:float) |
prov:wasDerivedFrom | wikipedia-en:Zongo_II_Hydroelectric_Power_Station?oldid=1030861288&ns=0 |
foaf:isPrimaryTopicOf | wikipedia-en:Zongo_II_Hydroelectric_Power_Station |
foaf:name | Zongo II Dam (en) |
is dbo:wikiPageWikiLink of | dbr:List_of_power_stations_in_the_Democratic_Republic_of_the_Congo dbr:List_of_waterfalls_by_flow_rate |
is foaf:primaryTopic of | wikipedia-en:Zongo_II_Hydroelectric_Power_Station |