|
Apr 1932 |
Old Screening Plant and Headgear, Dudley Colliery |
|
Apr 1932 |
New Screening Plant and Headgear under Construction at Dudley Colliery, with New Electric Winder House on Left |
|
Apr 1932 |
View of New Delaval Colliery showing (Between the dotted lines, marked x) the Screens and Headgear that were transported to Dudley Colliery |
|
May 1933 |
General view of winder at Dudley Colliery, showing the double drums |
|
May 1933 |
The Dudley winder from the motor end ; the 288-r.p.m. motor has a continuous rating of 330 H.P. and drives the drums at 29.4 r.p.m. through single-reduction gearing, the maximum rope speed being 18.5 ft. per sec. |
|
|
Dudley Colliery |