Research paper thumbnail of Bending Capacity Analysis of High-strength Reinforced Concrete Beams Using Environmentally Friendly Synthetic Fiber Composites

Procedia Engineering, 2015

The research was conducted to determine the bending capacity of high-strength reinforced concrete... more The research was conducted to determine the bending capacity of high-strength reinforced concrete beams with the addition of three environmentally friendly synthetic fibers i.e., polypropylene fiber, tie wire fiber, and used rubber tires fiber. Four beams with a dimension of 15 x 30 x 220 cm were tested, including a beam for specimen without fiber as comparison. Specimens were designed to experience bending failure. Yield point of steel (fy) used for flexural and shear reinforcement was 407.43 MPa. The diameter of flexural tensile reinforcement was 15.8 mm, 11.9 mm for the compressive reinforcement, as well as 11.9 mm for the shear reinforcement. Concrete proportion incorporated 8% silica fume and 1.5% polycarboxylate ethers based superplasticizer ViscoCrete 10 from the cement weight. The maximum diameter of split was 15.9 mm, having 550 kg/m3 cement content and w/cratio 0.30. The target compressive strength was 70 MPa for cylinder 15/30 cm. The results showed that all beams experienced flexural failure as planned. Addition of fibers enhanced the bending behavior significantly, especially in flexural capacity, deflection and ductility. In comparison with high-strength reinforced concrete beam without fibers, the beam with polypropylene fiber had the increase of flexural strength of 115.24%, deflection of 306.56% and ductility of 298.9%; with tie wire fibers resulted in the increase of flexural strength of 117.39%, deflection of 160.52% and ductility of 148.0%; as well as with used rubber tires fiber produced the enhance of flexural strength of 112.13%, deflection of 184.56% and ductility of 178.3%. It can be concluded that the use of such environmentally friendly synthetic fibers can reduce the brittleness of high strength concrete, in which polypropylene fiber had delivered the best value and can be used very effectively than the other two types of fibers.

Research paper thumbnail of Perilaku Geser Balok Beton Bertulang Mutu Tinggi Dengan Variasi Fly Ash Batu Bara, Pasir Pozzolan Dan Bongkahan Cangkang Sawit

Jurnal Arsip Rekayasa Sipil dan Perencanaan

The utilization of high strength concrete particularly on construction is an option in structural... more The utilization of high strength concrete particularly on construction is an option in structural elements. High Strength Concrete (BMT) is a compressive strength exceeding 6000 psi or 41 MPa. High quality concrete can be obtained by mixing superplasticizers (high range water reducers) and cementitious mineral additives in the form of fly ash, pozzofume (super fly ash), and microscopy (silicafume). In this study, it will used the substitution of cement material using coal fly ash, fly ash pozzolan sand and palm shell ash fly ash, fine aggregates using pozzolan sand, coarse aggregates palm shell. The aim of this study is to compare the shear behavior of normal high quality reinforced concrete beams and beams with the addition of material substitution. The high quality reinforced concrete beam specimens were designed to experience shear failure by strengthening the bending area. Reinforced concrete beam specimens of beam size 150 mm x 300 mm x 2200 mm with shear reinforcement diameter...

Research paper thumbnail of Characteristics and Design of Inong Balee Fort Binding Mortar For Restoration Purposes

Elkawnie

Inong Balee Fort is one of the Islamic Kingdom of Aceh heritage built-in 1599 by Admiral Malahaya... more Inong Balee Fort is one of the Islamic Kingdom of Aceh heritage built-in 1599 by Admiral Malahayati but several parts of the fortress wall have currently been damaged and the stone removed. Indonesian Government plans to restore the fort and this makes it necessary to examine the characteristics of the fortress mortar with a focus on the chemical composition and mineralogical elements. Therefore, mortar powder samples obtained from the fort walls were tested through X-Ray Diffraction (XRD) and the results showed the main composition of mortar is CaCO 3 and SiO 2 from a mixture of lime and sand while the others are P 2 O 5 , MgCO 3 , and Al 2 O 3. Meanwhile, two mortar mixtures including 1 lime: 2 sand and 1 cement: 2 lime: 3 sand were designed for restoration purposes and they were both found by the XRD analysis results to have a diffraction pattern similar to Inong Balee Fort mortar. However, mortar with 1 lime: 2 sand has a very low compressive strength subsequently it does not meet the specifications of the SNI 6882:2014 and ASTM C270-19a while mortar with 1 cement: 2 lime: 3 sand has a compressive strength which meets the specifications. Therefore, a mortar with 1 cement: 2 lime: 3 sand is recommended to be used for the restoration of Inong Balee Fort.

Research paper thumbnail of Kesesuaian Pemanfaatan Ruang Dan Penyelenggaraan Penataan Ruang DI Koridor Jalan Teuku Nyak Arief Kota Banda Aceh

Jurnal Arsip Rekayasa Sipil dan Perencanaan

Teuku Nyak Arief road corridor is a secondary arterial road that is included in the planned patte... more Teuku Nyak Arief road corridor is a secondary arterial road that is included in the planned pattern of protected area and cultivation area (City of Banda Aceh Qanun Number 2 of 2018). The use of space along the Teuku Nyak Arief road corridor was found by several misuse of the activity function. In this case the protected area has the blame for the function of restaurants/cafes in the non green open space zone, and in the cultivation area there is a misuse of the function of the processed metal product industry, and the wood industry in the trade and service zones. This study aims to identify the suitability of space utilization in the Teuku Nyak Arief road corridor, the form of spatial planning in the corridor desired by the building owner, and the policy in controlling space utilization so that the corridor is in accordance with the spatial detail plan. This study uses quantitative methods through questionnaires and qualitative methods through observation and interviews. The level ...

Research paper thumbnail of Studi Perbandingan Stress Ratio Pada Portal Baja Menggunakan Bracing Dengan Effective Length Method (Elm) Dan Direct Analisys Method (Dam)

Jurnal Arsip Rekayasa Sipil dan Perencanaan

In the design of high and low-rise buildings, structural systems should consider the requirements... more In the design of high and low-rise buildings, structural systems should consider the requirements of strength, stifness, and stability. The addition of bracing affects the stiffness of the structure of the building. In SNI 03-1729-2002 there is an Effective Length Method (ELM) method which only recommends first-order analysis with amplification factor. However, currently there is a new structural design regulation that is SNI 1729: 2015 which refers to the American Institute of Steel Contruction (AISC 2010) where the steel structure stability planning has taken into account the second-order effect directly. This study aims to compare the application of Direct Analysis Method (DAM) and Effective Length Method (ELM) on 2D simple structure, where the comparison of both methods is focused on stress ratio value, which aims to determine more effective and efficient method in designing of braced steel frame structure. The difference values of stress ratio obtained in this study varies from...

Research paper thumbnail of Evaluasi Komponen Fisik Bangunan Pasar Sayur Dan Buah Peunayong Kota Banda Aceh Terhadap Upaya Relokasi

Jurnal Arsip Rekayasa Sipil dan Perencanaan

Peunayong area is a trade and service area, as well as a heritage tourist area located in Kuta Al... more Peunayong area is a trade and service area, as well as a heritage tourist area located in Kuta Alam Subdistrict, Banda Aceh City. Since it was inaugurated in 2007 until now Peunayong Vegetable and Fruit Market is not working properly. Traders only want to sell on the first floor, and along the corridor of RA road. Kartini, while the second and third floors are not occupied. In addressing the issue, the Banda Aceh City Government seeks to relocate the Peunayong Market to an integrated market in Lampulo, which is currently under construction. This study aims to identify the factors that cause traders not to occupy the market building of Peunayong Vegetables and Fruits, to identify buyers' perceptions of relocation of Peunayong Vegetable and Fruit Market, and to evaluate the physical, non-physical, and Peunayong Vegetables Market. This research uses qualitative method through observation and interview, and quantitative method through questionnaires distribution. Respondents in this...

Research paper thumbnail of Analisis Kapasitas Puntir Elemen Balok Beton Mutu Tinggi Dengan Substitusi Aditif, Agregat Halus Serta Agregat Kasar (Penggunaan Fly Ash Batu Bara, Pasir Pozzolan Dan Cangkang Sawit)

Jurnal Arsip Rekayasa Sipil dan Perencanaan

Along with the construction development which is not symmetrical and both the column and the beam... more Along with the construction development which is not symmetrical and both the column and the beam made small then the torsion load highly affect the building structure. The torsion load often occurs in the building components such as beam, column and the joint of column and beam. The loads of floor plates and small beam will create a torsion moment on the certain beam. Earthquake can cause dangerous torsion force in all elements of building constructions. Like the load outside the center of the mass in which the torsion stress can be very high. This research aims to find out the torsion capacity on hybrid high performance concrete beam element in which the hybrid high performance concrete using additive alternative materials, by using 7 test objects variations, the size of the test objects used is 20 x 25 x 120 cm3 and the test done for 28 days of concrete period. From the test output obtained that the highest torsion moment found out in Test object number 6 (BU6) using pozzolanic ...

Research paper thumbnail of Studi Komparasi Variasi Jenis Superplasticizer Terhadap Sifat Mekanis Beton Mutu Tinggi Dengan Menggunakan Fly Ash Abu Cangkang Kelapa Sawit Sebagai Aditif

Jurnal Arsip Rekayasa Sipil dan Perencanaan

Nowadays, a construction uses a lot of concrete with highly strong power that is needed to suppor... more Nowadays, a construction uses a lot of concrete with highly strong power that is needed to support materials supporting the construction. With the improvement of concrete technology nowadays it is possible that high quality concrete with the suppression of 70 MPa. Aceh Province, which is located, at the most tip of Sumatera Island has a great number of natural resources and materials that can be used in order to make concrete. These available resources are used for making high quality concrete with the pressure of 70 MPa. This research is going to explore the characteristic of concrete mechanic comprises of the strength of its pressure, the strength of its tight pressure, the bow strength and the sliding strength that can be reached by using additional material of palm nutshell as an additife replacement as apart of concrete use and the variation of the variety of superplasticizer optimum percentage of Sikament LN, Sikament NN and Viscocrete-10 by rude aggregation with maximum measu...

Research paper thumbnail of Kualitas Ruang Terbuka Publik Lapangan Blang Padang Kota Banda Aceh

Jurnal Arsip Rekayasa Sipil dan Perencanaan

Public open space is a shared space used by the community for individual or group activities. Qua... more Public open space is a shared space used by the community for individual or group activities. Quality public open spaces are public spaces that are able to meet needs, protect rights and give meaning to the people who visit them. Blang Padang Field is a tourist zone and public space used by visitors for recreation, sports and selling. Blang Padang as a venue for state ceremonies, religious and military activities. The condition of the physical structure and some of the facilities in it are inadequate as a public space such as a public toilet and seats. Its multi-functional use creates several problems such as parking problems and traffic jams. The method used is quantitative and qualitative using a Likert scale, with descriptive analysis. The data used were observations, questionnaires, and interviews, and data from related agencies. The quality of the Blang Padang Field Public Open Space based on the fulfillment of the needs aspect with a value of 2.97 and the quality of the rights...

Research paper thumbnail of Analisis Aplikasi Struktur Truss Berpenampang Melintang Segitiga Untuk Jembatan Jalan Raya

Jurnal Teknik Sipil Unaya

Truss structure which is often used for primary girder of bridge of highway is a Warren or Pratt... more Truss structure which is often used for primary girder of bridge of highway is a Warren or Pratt type, what is its use combined with two horizontal truss attached below and above functioning as truss of wind bracing. Though have space dimension, but its structure is not pure of truss space, practically its analysis is done to each truss, vertical and horizontal which is considered as plane truss. Truss structure with a trianggular cross section type represent other alternative from structure truss which can is also used as a highway bridge structure, and this type truss represent purification truss space. Beside that, structurally entire element truss together have the contribution to arrest forced from all direction, and cause this type truss is more stable in arrest torsion and shear compared to a other structure truss bridge type. Method used to analyse structure of truss that is stiffness matrix method by means of assist calculation of Microsoft Excel 2007. Result to be rea...

Research paper thumbnail of Analisis Perpindahan Pada Struktur Bangunan Menggunakan Base Isolator DI Wilayah Gempa Kuat

Portal: Jurnal Teknik Sipil

The meeting of three major tectonic plates makes Indonesia prone to earthquakes, be it the Indo-A... more The meeting of three major tectonic plates makes Indonesia prone to earthquakes, be it the Indo-Australian plate, the Eurasian plate, and the Pacific plate. Earthquakes are caused by the release of energy generated by the pressure caused by moving plates. Its essence is not earthquake that damage building but anticipation of building which must be in earthquake resistant design. In this case, the building structure must be designed to be earthquake resistant. One of earthquake resistant building technology is technology with base isolator system. This study aims to determine the displacement analysis that occurs due to the effects of earthquake on the structure of the building. Both in the use of base isolator and without using base isolator. The design of this structure is done by analyzing the time dynamic history load in the SRPMK building (struktur rangka pemikul momen khusus). With 10 storey floor building, regular shape, in SRPMK building. The structural elements reviewed in a...

Research paper thumbnail of Analysis of Post-Combustion High-Strength Concrete Compressive Strength Using Polypropylene Fibers

MEDIA KOMUNIKASI TEKNIK SIPIL

High-strength concrete is vulnerable to high temperatures due to its high density. The use of pol... more High-strength concrete is vulnerable to high temperatures due to its high density. The use of polypropylene fibers could prevent structure explosion by forming canals due to melted fibers during fire, thus release its thermal stress. This study aims to determine the effect of polypropylene fibers on compressive strength of high-strength concrete after combustion at 400ºC for five hours. High-strength concrete was made by w/c-ratio 0.3 with cement amount 550 kg/m3 and added with silica fume 8% and superplasticizer 4% by cement weight. The variations of polypropylene fibers were 0%, 0.2% and 0.4% of concrete volume. The compression test was carried out on standard cylinders Ø15/30 cm of combustion and without combustion specimens at 7 and 28 days. The results showed that compressive strength of high-strength concretes without using polypropylene fibers decreased in post-combustion compared with specimens without combustion, i.e., 0.81% at 7 days and 23.42% at 28 days. Conversely, the ...

Research paper thumbnail of Pendidikan Mitigasi Bencana Berbasis Lingkungan Masyarakat Terhadap Titik Evakuasi Bencana Tsunami

BIOTIK: Jurnal Ilmiah Biologi Teknologi dan Kependidikan

Gempa bumi tanggal 11 April 2012 di Kota Banda Aceh dan sekitarnya masih menunjukkan minimnya per... more Gempa bumi tanggal 11 April 2012 di Kota Banda Aceh dan sekitarnya masih menunjukkan minimnya persiapan masyarakat mengenai kesiapsiagaan menghadapi bencana. Penyebaran informasi dan pendidikan masyarakat terkait ilmu kebencanaan yang belum maksimal menjadi salah satu faktor penyebab. Minimnya persiapan dalam menghadapi bencana dapat dilihat dari kemacetan yang terjadi pada saat itu. Kemacetan terjadi di beberapa ruas jalan saat warga Kota Banda Aceh melakukan evakuasi akibat gempa bumi 11 April 2012. Jalur evakuasi dan titik evakuasi yang ada tidak memadai. Untuk menganalisa kejadian tersebut, survey dan observasi lapangan menjadi metode yang mungkin dilakukan dalam mengevaluasi kejadian darurat yang sudah terjadi. Masyarakat dan instansi terkait menjadi objek survey. Kajian yang berlokasi di Kecamatan Baiturrahman ini dilakukan dengan tujuan menentukan jalur evakuasi dan titik evakuasi alternatif. Kecamatan Kutaraja dan Meuraksa menjadi bagian dari kajian ini disebabkan sebagian w...

Research paper thumbnail of Strategi Pemanfaatan Tempat Evakuasi Sementara Kecamatan Peukan Bada Kabupaten Aceh Besar

Jurnal Arsip Rekayasa Sipil dan Perencanaan

The disaster phenomenon has encouraged regions to rearrange community life including in Aceh Besa... more The disaster phenomenon has encouraged regions to rearrange community life including in Aceh Besar district which is an area affected by earthquake and tsunami. Nowadays the government concern to handling a natural disaster by constructing the Temporary Evacuation Shelter (TES). Therefore, this study aiming at gaining society perception of TES, and determining the main factor and the strategies on the use of TES. The benefits are to provide information and input to the Government and the management of TES. Quantitative and qualitative methods were used in this study. The questionnaire was distributed to the target respondents as much as 233 questionnaires. Furthermore, Focused Group Discussion (FGD) held by invited society figure and stakeholders to obtain the strategies of the use of TES. Results from the analysis questionnaire data indicate that people secured with the existence of TES. The main factor is the availability of TES facilities. The conclusion from FGD is introducing T...

Research paper thumbnail of Optimalisasi Pengelolaan Kawasan Pasar Ulee Kareng Kota Banda Aceh

Jurnal Arsip Rekayasa Sipil dan Perencanaan

The purpose of this study is to determine the factors that affect the less optimal management of ... more The purpose of this study is to determine the factors that affect the less optimal management of Ulee Kareng Market, evaluate the role of market managers and provide better solutions to the management of Ulee Kareng Market. This research was using a qualitative method by both observation and interview, and also a quantitative method for the distribution of questionnaires. Numbers of respondents in this research were as many as 163 persons. The statistical analysis used in data processing consists of validity, reliability tests and statistics descriptive. The SPSS software was used to analyze data in this study. The result of factors analysis reveals that causing less optimal management are insufficient in utilizing available parking area, clogged drainage, scattered rubbish and lack of control of street vendors. Furthermore, the Strengths, Weakness, Opportunities, Threats (SWOT) analysis is conducted to explore strategy used in the market. The result from the SWOT analyze suggested ...

Research paper thumbnail of Analisis Kuat Tarik Belah Beton Menggunakan Air Campuran Suhu Ekstrim Yang Ditambahkan Accelerator Dan Retarder

Jurnal Teknik Sipil

In recent decades global warming has been occurring in the world. The need for concrete as constr... more In recent decades global warming has been occurring in the world. The need for concrete as construction material is continuously increasing, 60% of the world's civil-engineering infrastructures are made of concrete. The aim of this study was to determine the effect of using extreme water temperature as mixed water in concrete on concrete splitting tensile strength added by accelerator and retarder. Water used is hot water (100°C), cold water (10°C), and normal temperature water (23°C). Accelerator and retarder used are 0%; 0 ,25%; 0,50% and 0,75% by cement weight. Concrete was made with FAS 0,35; 0,40; and 0,45.Tensile strength testing using a 15/30 cm concrete cylinder totaling 135 specimens, varied in FAS and percentage of admixture (accelerator and retarder), each variation has 5 specimens and tested at 28 days. The results showed that concrete using extreme temperature of mixed water using accelerator and retarder could affect concrete tensile strength compared to normal concrete without using admixture. In concrete mixture using cold water, an increase in tensile strength occurred at FAS 0,35; 0,40; and 0,45 with addition of 0,25% accelerator, which was 0,41%; 0,43% and 2,3% compared to using normal water temperature without accelerator addition. For hot water mixture, an increase in tensile strength at FAS 0,35; 0,40; and 0,45 with using 0,25% retarder, which was 4,49%; 6,04%; and 2,76% compared to concrete using normal water temperature without retarder addition.

Research paper thumbnail of Sub-activity Time-Cost Trade-off Model of Building Structural Beam on the Projects in the North Aceh Region

Aceh International Journal of Science and Technology

Problems for both delayed and accelerated activities in scheduling are common in most projects. T... more Problems for both delayed and accelerated activities in scheduling are common in most projects. This problem can implicate on the additional construction cost with different trends as a specific model. A model can provide valuable information to project acceleration judgement. This research aims to develop the TCTO sub-activity model of formwork, rebar work, and concrete work of the building structural beam on the projects in the North Aceh region. We have collected 33 data sourced from the project cost plan report and respondents judgment in the reviewed area. Descriptive statistics and the regression analysis are used to generate the TCTO model. The results show that the activity duration of the structural beam as broken down into sub-activities of formwork, rebar work and concrete work can be compressed until reaching 40%, 50%, and 40% of its normal duration, respectively. The additional cost of the compressed duration for each sub-activity shows the direct incremental cost per d...

Research paper thumbnail of Pengaruh Bahan Tambah Fly Ash Batu Bara Terhadap Kuat Tekan Beton Mutu Tinggi

Jurnal Teknik Sipil dan Teknologi Konstruksi

Perkembangan daerah Barat Selatan Provinsi Aceh semakin baik, karena pada saat ini telah berdiri ... more Perkembangan daerah Barat Selatan Provinsi Aceh semakin baik, karena pada saat ini telah berdiri pembangkit listrik tenaga uap (PLTU 2 x 110 W) dengan menggunakan bahan bakar batu bara yang menghasilkan limbah hasil pembakaran tanur yaitu abu terbang batu bara (fly ash) dimana pemanfaatan limbah tersebut masih perlu dikembangkan terus menerus. Salah satunya adalah sebagai bahan tambah (additive) pengganti silica fume untuk menghasilkan beton mutu tinggi. Dalam penelitian ini digunakan zat tambah yaitu abu terbang batu bara, dimana jumlah yang ditambahkan adalah 0 %, 5 %, 8 %, 10 % dan 15 % terhadap berat semen, juga digunakan superplastizer (Viscocrete N 10) sebanyak 1,5 % dari berat semen. Beton direncanakan dengan faktor air semen (FAS) sebesar 0,3. Pengujian dilakukan terhadap kuat tekan beton pada umur 28 dan 56 hari. Pengujian kuat tekan dilakukan pada benda uji silinder beton dengan diameter 15 cm dan tinggi 30 cm. Jumlah benda uji 30 buah, setiap variabel meng...

Research paper thumbnail of Kuat Tekan Beton Mutu Tinggi Hybrid Dengan Substitusi Semen Dan Agregat Halus Serta Penambahan Nano Material Bijih Besi

Jurnal Arsip Rekayasa Sipil dan Perencanaan

Beton adalah salah satu unsur utama dalam konstruksi bangunan. Dalam pembangunan gedung bertingka... more Beton adalah salah satu unsur utama dalam konstruksi bangunan. Dalam pembangunan gedung bertingkat tinggi serta infrastruktur lainnya yang bersifat massal dibutuhkan beton dengan kekuatan tinggi, beton mutu tinggi adalah pilihan yang tepat. Beton mutu tinggi yang tercantum pada SNI 03-6468-2000 didefinisikan sebagai beton yang mempunyai kuat tekan yang disyaratkan lebih besar sama dengan 41,4 MPa. Untuk memperoleh beton mutu tinggi hal yang perlu dilakukan adalah meningkatkan mutu material pembentuknya. Peningkatan mutu beton dapat dilakukan dengan penambahan atau mensubstitusikan bahan lain (additive) kedalam campuran beton. Pada penelitian ini, peneliti mensubstitusikan semen dengan menggunakan fly ash batu bara, pasir pozzolan, dan cangkang sawit, substitusi agregat halus menggunakan pasir pozzolan dan bongkahan cangkang sawit, dan agregat kasar pada campuran beton mutu tinggi dengan fly ash batu bara, cangkang sawit, pasir pozzolan, serta menambahkan nanomaterial bijih besi sebagai filler.Tujuan dari penelitian ini adalah untuk mengetahui kuat tekan beton mutu tinggi hybrid (BMT-H) yang menggunakan fly ash batu bara, cangkang sawit, dan pasir pozzolan sebagai substitusi semen, substitusi agregat halus dan agregat kasar serta penambahan filler nanomaterial bijih besi dan dibandingkan dengan beton mutu tinggi normal (BMT-N).

Research paper thumbnail of Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity

MATEC Web of Conferences

A Project Estimator cannot claim that his/her estimated duration is better than others. They can ... more A Project Estimator cannot claim that his/her estimated duration is better than others. They can determine the reasonable duration based on deterministic and probabilistic factors affecting the duration and then specify how to achieve it. This condition provides an overview that the activity duration changeable stochastically as a result of uncertainty-factors. However, we have a presumption that the activities duration will be normally distributed based on variation of its production rate per day (PRPD). The purpose of this study are (i) estimating the normal duration of the project activities using PRPD; and (ii) conducting the hypothesis testing for the PRPD normality of the project activities in South of Aceh. Hypothesis testing toward six-activities from 50 projects in South of Aceh will be used to achieve research objectives. Result shows PRPD normally distributed with skewness value still falling inside tolerance range of-1/+1. We argue that the normal duration of activity can be estimated more quickly involving its normal PRPD. An estimator does not need to predict what the factors affecting the duration estimation, especially in the bidding/tender process. They only need the normal PRPD as a standard value, to estimate, to assess and to verify the normality level of actual duration for the purpose of project decision.

Research paper thumbnail of Bending Capacity Analysis of High-strength Reinforced Concrete Beams Using Environmentally Friendly Synthetic Fiber Composites

Procedia Engineering, 2015

The research was conducted to determine the bending capacity of high-strength reinforced concrete... more The research was conducted to determine the bending capacity of high-strength reinforced concrete beams with the addition of three environmentally friendly synthetic fibers i.e., polypropylene fiber, tie wire fiber, and used rubber tires fiber. Four beams with a dimension of 15 x 30 x 220 cm were tested, including a beam for specimen without fiber as comparison. Specimens were designed to experience bending failure. Yield point of steel (fy) used for flexural and shear reinforcement was 407.43 MPa. The diameter of flexural tensile reinforcement was 15.8 mm, 11.9 mm for the compressive reinforcement, as well as 11.9 mm for the shear reinforcement. Concrete proportion incorporated 8% silica fume and 1.5% polycarboxylate ethers based superplasticizer ViscoCrete 10 from the cement weight. The maximum diameter of split was 15.9 mm, having 550 kg/m3 cement content and w/cratio 0.30. The target compressive strength was 70 MPa for cylinder 15/30 cm. The results showed that all beams experienced flexural failure as planned. Addition of fibers enhanced the bending behavior significantly, especially in flexural capacity, deflection and ductility. In comparison with high-strength reinforced concrete beam without fibers, the beam with polypropylene fiber had the increase of flexural strength of 115.24%, deflection of 306.56% and ductility of 298.9%; with tie wire fibers resulted in the increase of flexural strength of 117.39%, deflection of 160.52% and ductility of 148.0%; as well as with used rubber tires fiber produced the enhance of flexural strength of 112.13%, deflection of 184.56% and ductility of 178.3%. It can be concluded that the use of such environmentally friendly synthetic fibers can reduce the brittleness of high strength concrete, in which polypropylene fiber had delivered the best value and can be used very effectively than the other two types of fibers.

Research paper thumbnail of Perilaku Geser Balok Beton Bertulang Mutu Tinggi Dengan Variasi Fly Ash Batu Bara, Pasir Pozzolan Dan Bongkahan Cangkang Sawit

Jurnal Arsip Rekayasa Sipil dan Perencanaan

The utilization of high strength concrete particularly on construction is an option in structural... more The utilization of high strength concrete particularly on construction is an option in structural elements. High Strength Concrete (BMT) is a compressive strength exceeding 6000 psi or 41 MPa. High quality concrete can be obtained by mixing superplasticizers (high range water reducers) and cementitious mineral additives in the form of fly ash, pozzofume (super fly ash), and microscopy (silicafume). In this study, it will used the substitution of cement material using coal fly ash, fly ash pozzolan sand and palm shell ash fly ash, fine aggregates using pozzolan sand, coarse aggregates palm shell. The aim of this study is to compare the shear behavior of normal high quality reinforced concrete beams and beams with the addition of material substitution. The high quality reinforced concrete beam specimens were designed to experience shear failure by strengthening the bending area. Reinforced concrete beam specimens of beam size 150 mm x 300 mm x 2200 mm with shear reinforcement diameter...

Research paper thumbnail of Characteristics and Design of Inong Balee Fort Binding Mortar For Restoration Purposes

Elkawnie

Inong Balee Fort is one of the Islamic Kingdom of Aceh heritage built-in 1599 by Admiral Malahaya... more Inong Balee Fort is one of the Islamic Kingdom of Aceh heritage built-in 1599 by Admiral Malahayati but several parts of the fortress wall have currently been damaged and the stone removed. Indonesian Government plans to restore the fort and this makes it necessary to examine the characteristics of the fortress mortar with a focus on the chemical composition and mineralogical elements. Therefore, mortar powder samples obtained from the fort walls were tested through X-Ray Diffraction (XRD) and the results showed the main composition of mortar is CaCO 3 and SiO 2 from a mixture of lime and sand while the others are P 2 O 5 , MgCO 3 , and Al 2 O 3. Meanwhile, two mortar mixtures including 1 lime: 2 sand and 1 cement: 2 lime: 3 sand were designed for restoration purposes and they were both found by the XRD analysis results to have a diffraction pattern similar to Inong Balee Fort mortar. However, mortar with 1 lime: 2 sand has a very low compressive strength subsequently it does not meet the specifications of the SNI 6882:2014 and ASTM C270-19a while mortar with 1 cement: 2 lime: 3 sand has a compressive strength which meets the specifications. Therefore, a mortar with 1 cement: 2 lime: 3 sand is recommended to be used for the restoration of Inong Balee Fort.

Research paper thumbnail of Kesesuaian Pemanfaatan Ruang Dan Penyelenggaraan Penataan Ruang DI Koridor Jalan Teuku Nyak Arief Kota Banda Aceh

Jurnal Arsip Rekayasa Sipil dan Perencanaan

Teuku Nyak Arief road corridor is a secondary arterial road that is included in the planned patte... more Teuku Nyak Arief road corridor is a secondary arterial road that is included in the planned pattern of protected area and cultivation area (City of Banda Aceh Qanun Number 2 of 2018). The use of space along the Teuku Nyak Arief road corridor was found by several misuse of the activity function. In this case the protected area has the blame for the function of restaurants/cafes in the non green open space zone, and in the cultivation area there is a misuse of the function of the processed metal product industry, and the wood industry in the trade and service zones. This study aims to identify the suitability of space utilization in the Teuku Nyak Arief road corridor, the form of spatial planning in the corridor desired by the building owner, and the policy in controlling space utilization so that the corridor is in accordance with the spatial detail plan. This study uses quantitative methods through questionnaires and qualitative methods through observation and interviews. The level ...

Research paper thumbnail of Studi Perbandingan Stress Ratio Pada Portal Baja Menggunakan Bracing Dengan Effective Length Method (Elm) Dan Direct Analisys Method (Dam)

Jurnal Arsip Rekayasa Sipil dan Perencanaan

In the design of high and low-rise buildings, structural systems should consider the requirements... more In the design of high and low-rise buildings, structural systems should consider the requirements of strength, stifness, and stability. The addition of bracing affects the stiffness of the structure of the building. In SNI 03-1729-2002 there is an Effective Length Method (ELM) method which only recommends first-order analysis with amplification factor. However, currently there is a new structural design regulation that is SNI 1729: 2015 which refers to the American Institute of Steel Contruction (AISC 2010) where the steel structure stability planning has taken into account the second-order effect directly. This study aims to compare the application of Direct Analysis Method (DAM) and Effective Length Method (ELM) on 2D simple structure, where the comparison of both methods is focused on stress ratio value, which aims to determine more effective and efficient method in designing of braced steel frame structure. The difference values of stress ratio obtained in this study varies from...

Research paper thumbnail of Evaluasi Komponen Fisik Bangunan Pasar Sayur Dan Buah Peunayong Kota Banda Aceh Terhadap Upaya Relokasi

Jurnal Arsip Rekayasa Sipil dan Perencanaan

Peunayong area is a trade and service area, as well as a heritage tourist area located in Kuta Al... more Peunayong area is a trade and service area, as well as a heritage tourist area located in Kuta Alam Subdistrict, Banda Aceh City. Since it was inaugurated in 2007 until now Peunayong Vegetable and Fruit Market is not working properly. Traders only want to sell on the first floor, and along the corridor of RA road. Kartini, while the second and third floors are not occupied. In addressing the issue, the Banda Aceh City Government seeks to relocate the Peunayong Market to an integrated market in Lampulo, which is currently under construction. This study aims to identify the factors that cause traders not to occupy the market building of Peunayong Vegetables and Fruits, to identify buyers' perceptions of relocation of Peunayong Vegetable and Fruit Market, and to evaluate the physical, non-physical, and Peunayong Vegetables Market. This research uses qualitative method through observation and interview, and quantitative method through questionnaires distribution. Respondents in this...

Research paper thumbnail of Analisis Kapasitas Puntir Elemen Balok Beton Mutu Tinggi Dengan Substitusi Aditif, Agregat Halus Serta Agregat Kasar (Penggunaan Fly Ash Batu Bara, Pasir Pozzolan Dan Cangkang Sawit)

Jurnal Arsip Rekayasa Sipil dan Perencanaan

Along with the construction development which is not symmetrical and both the column and the beam... more Along with the construction development which is not symmetrical and both the column and the beam made small then the torsion load highly affect the building structure. The torsion load often occurs in the building components such as beam, column and the joint of column and beam. The loads of floor plates and small beam will create a torsion moment on the certain beam. Earthquake can cause dangerous torsion force in all elements of building constructions. Like the load outside the center of the mass in which the torsion stress can be very high. This research aims to find out the torsion capacity on hybrid high performance concrete beam element in which the hybrid high performance concrete using additive alternative materials, by using 7 test objects variations, the size of the test objects used is 20 x 25 x 120 cm3 and the test done for 28 days of concrete period. From the test output obtained that the highest torsion moment found out in Test object number 6 (BU6) using pozzolanic ...

Research paper thumbnail of Studi Komparasi Variasi Jenis Superplasticizer Terhadap Sifat Mekanis Beton Mutu Tinggi Dengan Menggunakan Fly Ash Abu Cangkang Kelapa Sawit Sebagai Aditif

Jurnal Arsip Rekayasa Sipil dan Perencanaan

Nowadays, a construction uses a lot of concrete with highly strong power that is needed to suppor... more Nowadays, a construction uses a lot of concrete with highly strong power that is needed to support materials supporting the construction. With the improvement of concrete technology nowadays it is possible that high quality concrete with the suppression of 70 MPa. Aceh Province, which is located, at the most tip of Sumatera Island has a great number of natural resources and materials that can be used in order to make concrete. These available resources are used for making high quality concrete with the pressure of 70 MPa. This research is going to explore the characteristic of concrete mechanic comprises of the strength of its pressure, the strength of its tight pressure, the bow strength and the sliding strength that can be reached by using additional material of palm nutshell as an additife replacement as apart of concrete use and the variation of the variety of superplasticizer optimum percentage of Sikament LN, Sikament NN and Viscocrete-10 by rude aggregation with maximum measu...

Research paper thumbnail of Kualitas Ruang Terbuka Publik Lapangan Blang Padang Kota Banda Aceh

Jurnal Arsip Rekayasa Sipil dan Perencanaan

Public open space is a shared space used by the community for individual or group activities. Qua... more Public open space is a shared space used by the community for individual or group activities. Quality public open spaces are public spaces that are able to meet needs, protect rights and give meaning to the people who visit them. Blang Padang Field is a tourist zone and public space used by visitors for recreation, sports and selling. Blang Padang as a venue for state ceremonies, religious and military activities. The condition of the physical structure and some of the facilities in it are inadequate as a public space such as a public toilet and seats. Its multi-functional use creates several problems such as parking problems and traffic jams. The method used is quantitative and qualitative using a Likert scale, with descriptive analysis. The data used were observations, questionnaires, and interviews, and data from related agencies. The quality of the Blang Padang Field Public Open Space based on the fulfillment of the needs aspect with a value of 2.97 and the quality of the rights...

Research paper thumbnail of Analisis Aplikasi Struktur Truss Berpenampang Melintang Segitiga Untuk Jembatan Jalan Raya

Jurnal Teknik Sipil Unaya

Truss structure which is often used for primary girder of bridge of highway is a Warren or Pratt... more Truss structure which is often used for primary girder of bridge of highway is a Warren or Pratt type, what is its use combined with two horizontal truss attached below and above functioning as truss of wind bracing. Though have space dimension, but its structure is not pure of truss space, practically its analysis is done to each truss, vertical and horizontal which is considered as plane truss. Truss structure with a trianggular cross section type represent other alternative from structure truss which can is also used as a highway bridge structure, and this type truss represent purification truss space. Beside that, structurally entire element truss together have the contribution to arrest forced from all direction, and cause this type truss is more stable in arrest torsion and shear compared to a other structure truss bridge type. Method used to analyse structure of truss that is stiffness matrix method by means of assist calculation of Microsoft Excel 2007. Result to be rea...

Research paper thumbnail of Analisis Perpindahan Pada Struktur Bangunan Menggunakan Base Isolator DI Wilayah Gempa Kuat

Portal: Jurnal Teknik Sipil

The meeting of three major tectonic plates makes Indonesia prone to earthquakes, be it the Indo-A... more The meeting of three major tectonic plates makes Indonesia prone to earthquakes, be it the Indo-Australian plate, the Eurasian plate, and the Pacific plate. Earthquakes are caused by the release of energy generated by the pressure caused by moving plates. Its essence is not earthquake that damage building but anticipation of building which must be in earthquake resistant design. In this case, the building structure must be designed to be earthquake resistant. One of earthquake resistant building technology is technology with base isolator system. This study aims to determine the displacement analysis that occurs due to the effects of earthquake on the structure of the building. Both in the use of base isolator and without using base isolator. The design of this structure is done by analyzing the time dynamic history load in the SRPMK building (struktur rangka pemikul momen khusus). With 10 storey floor building, regular shape, in SRPMK building. The structural elements reviewed in a...

Research paper thumbnail of Analysis of Post-Combustion High-Strength Concrete Compressive Strength Using Polypropylene Fibers

MEDIA KOMUNIKASI TEKNIK SIPIL

High-strength concrete is vulnerable to high temperatures due to its high density. The use of pol... more High-strength concrete is vulnerable to high temperatures due to its high density. The use of polypropylene fibers could prevent structure explosion by forming canals due to melted fibers during fire, thus release its thermal stress. This study aims to determine the effect of polypropylene fibers on compressive strength of high-strength concrete after combustion at 400ºC for five hours. High-strength concrete was made by w/c-ratio 0.3 with cement amount 550 kg/m3 and added with silica fume 8% and superplasticizer 4% by cement weight. The variations of polypropylene fibers were 0%, 0.2% and 0.4% of concrete volume. The compression test was carried out on standard cylinders Ø15/30 cm of combustion and without combustion specimens at 7 and 28 days. The results showed that compressive strength of high-strength concretes without using polypropylene fibers decreased in post-combustion compared with specimens without combustion, i.e., 0.81% at 7 days and 23.42% at 28 days. Conversely, the ...

Research paper thumbnail of Pendidikan Mitigasi Bencana Berbasis Lingkungan Masyarakat Terhadap Titik Evakuasi Bencana Tsunami

BIOTIK: Jurnal Ilmiah Biologi Teknologi dan Kependidikan

Gempa bumi tanggal 11 April 2012 di Kota Banda Aceh dan sekitarnya masih menunjukkan minimnya per... more Gempa bumi tanggal 11 April 2012 di Kota Banda Aceh dan sekitarnya masih menunjukkan minimnya persiapan masyarakat mengenai kesiapsiagaan menghadapi bencana. Penyebaran informasi dan pendidikan masyarakat terkait ilmu kebencanaan yang belum maksimal menjadi salah satu faktor penyebab. Minimnya persiapan dalam menghadapi bencana dapat dilihat dari kemacetan yang terjadi pada saat itu. Kemacetan terjadi di beberapa ruas jalan saat warga Kota Banda Aceh melakukan evakuasi akibat gempa bumi 11 April 2012. Jalur evakuasi dan titik evakuasi yang ada tidak memadai. Untuk menganalisa kejadian tersebut, survey dan observasi lapangan menjadi metode yang mungkin dilakukan dalam mengevaluasi kejadian darurat yang sudah terjadi. Masyarakat dan instansi terkait menjadi objek survey. Kajian yang berlokasi di Kecamatan Baiturrahman ini dilakukan dengan tujuan menentukan jalur evakuasi dan titik evakuasi alternatif. Kecamatan Kutaraja dan Meuraksa menjadi bagian dari kajian ini disebabkan sebagian w...

Research paper thumbnail of Strategi Pemanfaatan Tempat Evakuasi Sementara Kecamatan Peukan Bada Kabupaten Aceh Besar

Jurnal Arsip Rekayasa Sipil dan Perencanaan

The disaster phenomenon has encouraged regions to rearrange community life including in Aceh Besa... more The disaster phenomenon has encouraged regions to rearrange community life including in Aceh Besar district which is an area affected by earthquake and tsunami. Nowadays the government concern to handling a natural disaster by constructing the Temporary Evacuation Shelter (TES). Therefore, this study aiming at gaining society perception of TES, and determining the main factor and the strategies on the use of TES. The benefits are to provide information and input to the Government and the management of TES. Quantitative and qualitative methods were used in this study. The questionnaire was distributed to the target respondents as much as 233 questionnaires. Furthermore, Focused Group Discussion (FGD) held by invited society figure and stakeholders to obtain the strategies of the use of TES. Results from the analysis questionnaire data indicate that people secured with the existence of TES. The main factor is the availability of TES facilities. The conclusion from FGD is introducing T...

Research paper thumbnail of Optimalisasi Pengelolaan Kawasan Pasar Ulee Kareng Kota Banda Aceh

Jurnal Arsip Rekayasa Sipil dan Perencanaan

The purpose of this study is to determine the factors that affect the less optimal management of ... more The purpose of this study is to determine the factors that affect the less optimal management of Ulee Kareng Market, evaluate the role of market managers and provide better solutions to the management of Ulee Kareng Market. This research was using a qualitative method by both observation and interview, and also a quantitative method for the distribution of questionnaires. Numbers of respondents in this research were as many as 163 persons. The statistical analysis used in data processing consists of validity, reliability tests and statistics descriptive. The SPSS software was used to analyze data in this study. The result of factors analysis reveals that causing less optimal management are insufficient in utilizing available parking area, clogged drainage, scattered rubbish and lack of control of street vendors. Furthermore, the Strengths, Weakness, Opportunities, Threats (SWOT) analysis is conducted to explore strategy used in the market. The result from the SWOT analyze suggested ...

Research paper thumbnail of Analisis Kuat Tarik Belah Beton Menggunakan Air Campuran Suhu Ekstrim Yang Ditambahkan Accelerator Dan Retarder

Jurnal Teknik Sipil

In recent decades global warming has been occurring in the world. The need for concrete as constr... more In recent decades global warming has been occurring in the world. The need for concrete as construction material is continuously increasing, 60% of the world's civil-engineering infrastructures are made of concrete. The aim of this study was to determine the effect of using extreme water temperature as mixed water in concrete on concrete splitting tensile strength added by accelerator and retarder. Water used is hot water (100°C), cold water (10°C), and normal temperature water (23°C). Accelerator and retarder used are 0%; 0 ,25%; 0,50% and 0,75% by cement weight. Concrete was made with FAS 0,35; 0,40; and 0,45.Tensile strength testing using a 15/30 cm concrete cylinder totaling 135 specimens, varied in FAS and percentage of admixture (accelerator and retarder), each variation has 5 specimens and tested at 28 days. The results showed that concrete using extreme temperature of mixed water using accelerator and retarder could affect concrete tensile strength compared to normal concrete without using admixture. In concrete mixture using cold water, an increase in tensile strength occurred at FAS 0,35; 0,40; and 0,45 with addition of 0,25% accelerator, which was 0,41%; 0,43% and 2,3% compared to using normal water temperature without accelerator addition. For hot water mixture, an increase in tensile strength at FAS 0,35; 0,40; and 0,45 with using 0,25% retarder, which was 4,49%; 6,04%; and 2,76% compared to concrete using normal water temperature without retarder addition.

Research paper thumbnail of Sub-activity Time-Cost Trade-off Model of Building Structural Beam on the Projects in the North Aceh Region

Aceh International Journal of Science and Technology

Problems for both delayed and accelerated activities in scheduling are common in most projects. T... more Problems for both delayed and accelerated activities in scheduling are common in most projects. This problem can implicate on the additional construction cost with different trends as a specific model. A model can provide valuable information to project acceleration judgement. This research aims to develop the TCTO sub-activity model of formwork, rebar work, and concrete work of the building structural beam on the projects in the North Aceh region. We have collected 33 data sourced from the project cost plan report and respondents judgment in the reviewed area. Descriptive statistics and the regression analysis are used to generate the TCTO model. The results show that the activity duration of the structural beam as broken down into sub-activities of formwork, rebar work and concrete work can be compressed until reaching 40%, 50%, and 40% of its normal duration, respectively. The additional cost of the compressed duration for each sub-activity shows the direct incremental cost per d...

Research paper thumbnail of Pengaruh Bahan Tambah Fly Ash Batu Bara Terhadap Kuat Tekan Beton Mutu Tinggi

Jurnal Teknik Sipil dan Teknologi Konstruksi

Perkembangan daerah Barat Selatan Provinsi Aceh semakin baik, karena pada saat ini telah berdiri ... more Perkembangan daerah Barat Selatan Provinsi Aceh semakin baik, karena pada saat ini telah berdiri pembangkit listrik tenaga uap (PLTU 2 x 110 W) dengan menggunakan bahan bakar batu bara yang menghasilkan limbah hasil pembakaran tanur yaitu abu terbang batu bara (fly ash) dimana pemanfaatan limbah tersebut masih perlu dikembangkan terus menerus. Salah satunya adalah sebagai bahan tambah (additive) pengganti silica fume untuk menghasilkan beton mutu tinggi. Dalam penelitian ini digunakan zat tambah yaitu abu terbang batu bara, dimana jumlah yang ditambahkan adalah 0 %, 5 %, 8 %, 10 % dan 15 % terhadap berat semen, juga digunakan superplastizer (Viscocrete N 10) sebanyak 1,5 % dari berat semen. Beton direncanakan dengan faktor air semen (FAS) sebesar 0,3. Pengujian dilakukan terhadap kuat tekan beton pada umur 28 dan 56 hari. Pengujian kuat tekan dilakukan pada benda uji silinder beton dengan diameter 15 cm dan tinggi 30 cm. Jumlah benda uji 30 buah, setiap variabel meng...

Research paper thumbnail of Kuat Tekan Beton Mutu Tinggi Hybrid Dengan Substitusi Semen Dan Agregat Halus Serta Penambahan Nano Material Bijih Besi

Jurnal Arsip Rekayasa Sipil dan Perencanaan

Beton adalah salah satu unsur utama dalam konstruksi bangunan. Dalam pembangunan gedung bertingka... more Beton adalah salah satu unsur utama dalam konstruksi bangunan. Dalam pembangunan gedung bertingkat tinggi serta infrastruktur lainnya yang bersifat massal dibutuhkan beton dengan kekuatan tinggi, beton mutu tinggi adalah pilihan yang tepat. Beton mutu tinggi yang tercantum pada SNI 03-6468-2000 didefinisikan sebagai beton yang mempunyai kuat tekan yang disyaratkan lebih besar sama dengan 41,4 MPa. Untuk memperoleh beton mutu tinggi hal yang perlu dilakukan adalah meningkatkan mutu material pembentuknya. Peningkatan mutu beton dapat dilakukan dengan penambahan atau mensubstitusikan bahan lain (additive) kedalam campuran beton. Pada penelitian ini, peneliti mensubstitusikan semen dengan menggunakan fly ash batu bara, pasir pozzolan, dan cangkang sawit, substitusi agregat halus menggunakan pasir pozzolan dan bongkahan cangkang sawit, dan agregat kasar pada campuran beton mutu tinggi dengan fly ash batu bara, cangkang sawit, pasir pozzolan, serta menambahkan nanomaterial bijih besi sebagai filler.Tujuan dari penelitian ini adalah untuk mengetahui kuat tekan beton mutu tinggi hybrid (BMT-H) yang menggunakan fly ash batu bara, cangkang sawit, dan pasir pozzolan sebagai substitusi semen, substitusi agregat halus dan agregat kasar serta penambahan filler nanomaterial bijih besi dan dibandingkan dengan beton mutu tinggi normal (BMT-N).

Research paper thumbnail of Estimating the normal duration using normal Production Rate per Day (PRPD) of project activity

MATEC Web of Conferences

A Project Estimator cannot claim that his/her estimated duration is better than others. They can ... more A Project Estimator cannot claim that his/her estimated duration is better than others. They can determine the reasonable duration based on deterministic and probabilistic factors affecting the duration and then specify how to achieve it. This condition provides an overview that the activity duration changeable stochastically as a result of uncertainty-factors. However, we have a presumption that the activities duration will be normally distributed based on variation of its production rate per day (PRPD). The purpose of this study are (i) estimating the normal duration of the project activities using PRPD; and (ii) conducting the hypothesis testing for the PRPD normality of the project activities in South of Aceh. Hypothesis testing toward six-activities from 50 projects in South of Aceh will be used to achieve research objectives. Result shows PRPD normally distributed with skewness value still falling inside tolerance range of-1/+1. We argue that the normal duration of activity can be estimated more quickly involving its normal PRPD. An estimator does not need to predict what the factors affecting the duration estimation, especially in the bidding/tender process. They only need the normal PRPD as a standard value, to estimate, to assess and to verify the normality level of actual duration for the purpose of project decision.