Dita Fitri - Academia.edu (original) (raw)

Papers by Dita Fitri

Research paper thumbnail of Structural Damage Identification Methods in Truss Bridge Structures Using Vibration Analysis: A Review

E3S web of conferences, Dec 31, 2022

Developing countries will always engage in infrastructure development in various regions, and one... more Developing countries will always engage in infrastructure development in various regions, and one notable aspect of this development is the construction of steel frame bridges. Bridges are complex structures with a myriad of challenges. The increasing number of cases of steel frame bridge collapses has prompted humans to become more conscious of Structural Health Monitoring (SHM) activities. In order to implement this, the development of a straightforward structural damage detection method has been pursued, suitable for both simple and highly complex structures, commonly referred to as Vibration-Based Damage Detection (VBDD). Various algorithms have been proposed to achieve the goal of identifying structural damage, enabling prompt and accurate decision-making in handling such situations. This article delves into the discussion of several proposed algorithms for achieving this objective.

Research paper thumbnail of Analysis Mooring System Configuration of Submerged Floating Tunnel

Submerged Floating Tunnels (SFT) is a tubular structure that is submerged and floating in depth r... more Submerged Floating Tunnels (SFT) is a tubular structure that is submerged and floating in depth remains through the system of anchors consisting of a cable connected to the seabed. SFT structure imposed its own weight and is assisted by the buoyancy or uplift caused by water, cross sectin of the tunnel is designed so that buoyancy can overcome the structural weight and experienced a lift force that causes the floating structure. Fastening system (mooring system) also play a role which is to inhibit the SFT structure, minimize displacement and stress caused by environmental burden, such as earthquakes and hydrodynamic load that can aggravate the condition SFT structure in case of crossing the sea with SFT system. SFT will give a fairly small impact on the environment as it floated in the water, and with built using a modular system, the SFT (Submerged Floating Tunnels) can reach a distance long enough and does not cause pollution. Basically the same as the force that occurs archimides principle, where the objects are in the water to get a compressive force to the top. Cross sectional analysis SFT, will be modeled by 7 different models that have been in previous studies. The model's of SFT with steel cable to hold the structure in order to remain strong with the inclination selected. Analysis is done by modeling the triangle wiring configuration with different angle of incliflation cable. The analysis by comparing the test model were made earlier with prototype analyzed numerically. The expected structure did not undergo excessive deformation due to the environmental burden. Therefore, the structure of the SFT will be done with the Abaqus as finite element analysis. So, obvious deformation occurred in the cable. Therefore, it was expected to obtain the optimum angle of inclination was 54º.

Research paper thumbnail of Studi Komparasi Parameter Respons Spectrum Gempa Sni 1726-2012 Terhadap Sni 1726-2019 Dengan Studi Kasus Gedung C Stie Perbanas

Indonesia has standardized plans for earthquake-resistant building namely SNI 1726-2012. The deve... more Indonesia has standardized plans for earthquake-resistant building namely SNI 1726-2012. The development of ASCE 7 as the reference for SNI 1726 has triggered the renewal of standard in 2019 to be SNI 1726-2019,Therefore, the renewal has underpinned the comparative study on Building C of STIE PERBANAS. This research aimed at investigating the differences of respons spectrum analysis and loading combination, due to the changes of earthquake map by supporting program SAP2000. The research results demonstrated that the values of S S and S 1 in SNI 1726-2019 improved 2.242% and 23.08% consecutively. As a result, vertical earthquake increased the coefficient of maximum dead load in the combination SNI 1726-2019 by 0.797%.

Research paper thumbnail of Analysis Mooring System Configuration of Submerged Floating Tunnel

Aptech Proceeding International Seminar on Applied Technology, Science & Arts : Development of Green Agro-Industry to Support Human Life Sustainability, Apr 18, 2017

Submerged Floating Tunnels (SFT) is a tubular structure that is submerged and floating in depth r... more Submerged Floating Tunnels (SFT) is a tubular structure that is submerged and floating in depth remains through the system of anchors consisting of a cable connected to the seabed. SFT structure imposed its own weight and is assisted by the buoyancy or uplift caused by water, cross sectin of the tunnel is designed so that buoyancy can overcome the structural weight and experienced a lift force that causes the floating structure. Fastening system (mooring system) also play a role which is to inhibit the SFT structure, minimize displacement and stress caused by environmental burden, such as earthquakes and hydrodynamic load that can aggravate the condition SFT structure in case of crossing the sea with SFT system. SFT will give a fairly small impact on the environment as it floated in the water, and with built using a modular system, the SFT (Submerged Floating Tunnels) can reach a distance long enough and does not cause pollution. Basically the same as the force that occurs archimides principle, where the objects are in the water to get a compressive force to the top. Cross sectional analysis SFT, will be modeled by 7 different models that have been in previous studies. The model's of SFT with steel cable to hold the structure in order to remain strong with the inclination selected. Analysis is done by modeling the triangle wiring configuration with different angle of incliflation cable. The analysis by comparing the test model were made earlier with prototype analyzed numerically. The expected structure did not undergo excessive deformation due to the environmental burden. Therefore, the structure of the SFT will be done with the Abaqus as finite element analysis. So, obvious deformation occurred in the cable. Therefore, it was expected to obtain the optimum angle of inclination was 54º.

Research paper thumbnail of Modifikasi Jembatan Mataraman II Malang Menggunakan Struktur Gelagar Beton Bertulang

Rekayasa : jurnal sipil, Jul 31, 2019

Jembatan Mataraman II yang terletak di Kabupaten Malang memiliki panjang ± 40,8 m dengan lebar ± ... more Jembatan Mataraman II yang terletak di Kabupaten Malang memiliki panjang ± 40,8 m dengan lebar ± 11m. Jembatan ini semula didesain dengan standar bangunan atas tipe precast concrete I girder, metode girder precast, metode ini direkomendasikan pada jembatan Mataraman II, karena ekonomis, memperpendek waktu konstruksi dan workability. Jembatan eksisting ini didesain dengan tinggi I girder 1700 mm yang memiliki mutu beton precast concrete I girder K-500 (f'c 415 kg/cm2). Metode jembatan beton bertulang direkomendasikan pada jembatan ini, karena kriteria jembatan Mataraman II ini merupakan jembatan bentang pendek, sehingga jembatan beton bertulang cocok diterapkan dalam kasus ini. Selain itu juga, material yang digunakan memiliki sifat tahan lama, lebih ekonomis, dan mudah pemeliharaannya. Jembatan ini didesain dengan membangun abutment baru yang berjarak ± 2m dari abutment lama dikarenakan agar tidak mengganggu lebar mulut sungai, sehingga panjang jembatan menjadi 44,80m. Dikarenakan panjang jembatan > 25m maka kurang efektif dalam penggunaan gelagar beton bertulang, oleh karena itu direncanakan pilar yang berjarak ± 10m dari rencana abutment baru. Perencanaan abutment direncanakan dengan didukung pondasi sumuran, dikarenakan pada kedalaman 4 m-5 m harga N-SPT didapatkan N > 50 (tanah keras).

Research paper thumbnail of Penambahan Stressing Bar Pada Perencanaan Struktur Baja Gedung Parkir di Institut Teknologi Adhi Tama Surabaya

Prosiding Seminar Nasional Sains dan Teknologi Terapan, Sep 28, 2019

Perencanaan pada gedung parkir terpusat di Institut Teknologi Adhi Tama Surabaya dengan acuan dat... more Perencanaan pada gedung parkir terpusat di Institut Teknologi Adhi Tama Surabaya dengan acuan data survey SRP volume puncak kendaraan oleh made dkk (2017) jumlah kendaraan yang parkir 1299 motor, angka ini akan meningkat pada kondisi tertentu hingga mencapai 2000 kendaraan. Gedung parkir terpusat direncanakan dengan menggunakan metode strukrur baja konvensional, dalam perencanaan ini dilakukan peninjauan salah satu girder-nya yang direncanakan dengan penambahan stressing bar (baja pratengang) pada sayap bawah girder. Berdasarkan hasil perbandingan dalam perencanaan dengan menggunakan metode strukrur baja konvensional profil girder menggunakan WF350x175x7x11 dengan ratio momen 0.8, metode ini mendapatkan profil yang lebih besar dibandingkan dengan cara penambahan stressing bar (baja pratengan) yang menggunakan profil girder WF300x150x6.5x7 didapatkan ratio momen 0.87 dengan strand mutu G270 diameter 9.5 mm dan tarikan sebesar 9272.81 kg. Dalam penggunaan profil WF300x150x6.5x9 dengan penambahan stressing bar dapat mengefisiensi berat tiap balok utamanya hingga ±25%. Tetapi dengan penambahan stressing bar pada balok utama akan menambah waktu dalam pelaksanaannya di lapangan.

Research paper thumbnail of Modifikasi Struktur Jembatan Sumber Sari, Kalimantan Timur dengan menggunakan Sistem Busur

Jurnal Teknik Sipil, May 29, 2020

Indonesia is an island nation, and is crossed by rivers in each of its islands. Bridges have an i... more Indonesia is an island nation, and is crossed by rivers in each of its islands. Bridges have an important role in Indonesia, both long and short span bridges connecting inter islands and with river barriers have been built in Indonesia. This research focuses on Bridge Design using a steel bow system that contains artistic value, besides having a strong structure, this bridge also has a high aesthetic value. Sumber Sari Bridge, located in West Kutai, East Kalimantan has a span of 82 m with 2 vehicle lanes each 4 m wide. This bridge is a long span bridge. The initial stage of planning is the planning of the upper building consisting of vehicle floors and sidewalks, longitudinal girder and transverse girder, then the construction of the main bearer. Analysis using the SAP 2000 program is carried out after knowing the burdens that work on the construction to get the forces inside that work, especially for the main bearer construction and secondary construction. After the forces are known the magnitude of the voltage control calculations and connection calculations are performed. For the lower structure, an abutment (head of the bridge) is planned with a pile foundation.

Research paper thumbnail of Modifikasi Struktur Jembatan Sumber Sari, Kalimantan Timur dengan menggunakan Sistem Busur

Jurnal Teknik Sipil, 2020

Indonesia merupakan negara kepulauan, serta dilewati oleh sungai-sungai di setiap pulaunya. Jemba... more Indonesia merupakan negara kepulauan, serta dilewati oleh sungai-sungai di setiap pulaunya. Jembatan memiliki peranan yang penting di Indonesia, jembatan bentang panjang maupun bentang pendek yang menghubungkan antar pulau maupun dengan hambatan sungai telah banyak dibangun di Indonesia. Penelitian ini fokus pada Perencanaan Jembataan dengan menggunakan sistem busur baja yang mengandung nilai seni, selain memiliki struktur yang kuat, jembatan ini juga memiliki nilai estetika yang tinggi. Jembatan Sumber Sari, yang terletak di Kutai Barat, Kalimantan Timur memiliki bentang 82 m dengan 2 lajur kendaraan masing-masing selebar 4 m. Jembatan ini merupakan Jembatan bentang Panjang. Tahap awal perencanaan adalah perencanaan bangunan atas yang terdiri dari lantai kendaraan dan trotoar, gelagar memanjang dan gelagar melintang, kemudian konstruksi pemikul utama. Analisa dengan menggunakan program SAP 2000 dilakukan setelah dketahui beban – beban yang bekerja pada konstruksi tersebut untuk men...

Research paper thumbnail of Pengaruh Penggunaan Zat Aditif Tipe C Pada Kuat Tekan Beton

Jurnal Teknik Sipil, 2021

Dalam industri konstruksi pengembangan dan penggunaan semen campuran semakin meningkat. Hal ini b... more Dalam industri konstruksi pengembangan dan penggunaan semen campuran semakin meningkat. Hal ini bertujuan untuk meminimalisir penggunaan semen. Penggunaan Fly ash sebagai material pengganti untuk mengurangi jumlah semen, memiliki kelebihan, diantaranya menghemat biaya dan mengurangi dampak negatif pada lingkungan. Akan tetapi, berdasarkan penelitian mutakhir, didapatkan bahwa penggunaan fly ash diatas 30% akan menurunkan kuat tekan beton. Penggunaan zat aditif berfungsi untuk kemudahan pengerjaan ataupun mempercepat pengikatan pada beton dengan maksud mempersingkat waktu pelaksanaan konstruksi di lapangan. Zat aditif tipe C (Accelerator) digunakan untuk mengurangi lamanya waktu pengeringan (hidrasi), dan mempercepat pencapaian kekuatan beton. Dalam penelitian ini, dilakukan pembesaran prosentase penggunaan fly ash dengan tetap mempertahankan tercapainya mutu beton rencana, yaitu dengan cara penambahan zat aditf tipe C dari berat total bahan pengikat. Prosentase penggunaan fly ash t...

Research paper thumbnail of Penambahan Stressing Bar Pada Perencanaan Struktur Baja Gedung Parkir di Institut Teknologi Adhi Tama Surabaya

Perencanaan pada gedung parkir terpusat di Institut Teknologi Adhi Tama Surabaya dengan acuan dat... more Perencanaan pada gedung parkir terpusat di Institut Teknologi Adhi Tama Surabaya dengan acuan data survey SRP volume puncak kendaraan oleh made dkk (2017) jumlah kendaraan yang parkir 1299 motor, angka ini akan meningkat pada kondisi tertentu hingga mencapai 2000 kendaraan. Gedung parkir terpusat direncanakan dengan menggunakan metode strukrur baja konvensional, dalam perencanaan ini dilakukan peninjauan salah satu girder-nya yang direncanakan dengan penambahan stressing bar (baja pratengang) pada sayap bawah girder. Berdasarkan hasil perbandingan dalam perencanaan dengan menggunakan metode strukrur baja konvensional profil girder menggunakan WF350x175x7x11 dengan ratio momen 0.8, metode ini mendapatkan profil yang lebih besar dibandingkan dengan cara penambahan stressing bar (baja pratengan) yang menggunakan profil girder WF300x150x6.5x7 didapatkan ratio momen 0.87 dengan strand mutu G270 diameter 9.5 mm dan tarikan sebesar 9272.81 kg. Dalam penggunaan profil WF300x150x6.5x9 dengan...

Research paper thumbnail of Analisa Perbandingan Kolom Komposit Inside Steel dan Outside Steel terhadap Kapasitas Tahanan Aksial dan Momen

Reka Buana : Jurnal Ilmiah Teknik Sipil dan Teknik Kimia, 2020

ABSTRAK Penggunaan kolom komposit telah banyak digunakan di berbagai bangunan bangunan tinggi. Da... more ABSTRAK Penggunaan kolom komposit telah banyak digunakan di berbagai bangunan bangunan tinggi. Dan pada umumnya, Kolom komposit dibagi menjadi 2 macam, yaitu kolom komposit inside steel dan outside steel dengan struktur baja terbungkus oleh beton disebut dengan kolom inside steel atau bisa saja disebut Concrete Encased Column. Sedangkan untuk baja yang berisi beton disebut dengan kolom outside steel atau juga disebut Concrete Filled Column. Penggunaan struktur kolom komposit outside steel sebagai kolom utama dalam mendukung beban lateral pada struktur rangka bangunan belum lazim digunakan dalam perkembangan konstruksi saat ini. Oleh karena itu, perlu dilakukan analisa kekuatan dari 2 macam kolom komposit agar diketahui jenis kolom komposit yang paling efektif dan memiliki kekuatan paling tinggi. Perhitungan yang dilakukan dengan menggunakan perhitungan manual pada kolom komposit inside steel dan outside steel yang berbentuk kotak, sedangkan untuk perhitungan dengan menggunakan progr...

Research paper thumbnail of Pile Foundation Analysis on High – Rise Building using Finite Element-Spring Method on Sandy Clay Soil

IOP Conference Series: Materials Science and Engineering, 2019

It is a common thing used by a planner to get the pile foundation needs with the finite element p... more It is a common thing used by a planner to get the pile foundation needs with the finite element program. The output generated from the finite element program is then processed to produce the required number of piles on the planned structure. The finite element program that is often used is SAP2000. From several cases in the field, there were differences in the results of the number of piles needed between the analysis using the manual calculation method with the Nakazawa method. So, in this paper a comparison of the need for piles based on the manual calculation method with Nakazawa method will be compared, which is devoted to soft soil material according to soil data. The results showed that the number of pile requirements based on the Nakazawa method (n = 244 pieces) was much smaller than the manual calculation method (n = 320 pieces). This shows that the analysis of pile needs is more effective with the use of the Nakazawa method.

Research paper thumbnail of Penggunaan Beam Bracing Sebagai Pengganti Shear Wall Pada Proyek Pembangunan Gedung Bertingkat Tinggi

Pembangunan gedung bertingkat telah menjadi prioritas utama, keterbatasan lahan yang tersedia mak... more Pembangunan gedung bertingkat telah menjadi prioritas utama, keterbatasan lahan yang tersedia maka dibuat bangunan yang memaksimalkan penggunaan lahan dengan membuat bangunan yang bertingkat misalnya bangunan tinggi. Pada bangunan tinggi material utama biasanya yang digunakan yaitu shear wall. Penggunaan shear wall memiliki banyak kekurangan dan penelitian ini penggunaan shear wall diganti dengan pengaku beam bracing. Fungsi bracing adalah untuk memperkuat struktur secara keseluruhan. Tujuan dari penelitian ini untuk mendapatkan hasil kontrol Analisa penggunaan beam Bracing sebagai pengganti shear wall. Permodelan dan Analisa Struktur menggunakan SAP2000 v.14.2.5 dengan 4 desain yang sudah disempurnakan. Hasil analisa dari penelitian tersebut desain 4 (Sistem Rangka dan Bracing) memenuhi persyaratan periode getar fundamental yang terjadi. Selisih nilai gaya geser dasar (base shear) dari hitungan manual dan SAP2000 dengan nilai rata-rata selisih berkisar 3,5%. Penurunan nilai simpangan horisontal arah X dan Y paling besar pada Desain 4 yaitu sebesar 75,91% dan 19,73%. Dengan hasil analisis tersebut dapat disimpulkan bahwa Desain 4 (Sistem Rangka dan Bracing) mampu digunakan sebagai pengganti Shear Wall berdasarkan nilai-nilai simpangan horisontal arah X dan Y.

Research paper thumbnail of Modifikasi Jembatan Mataraman II Malang Menggunakan Struktur Gelagar Beton Bertulang

Rekayasa: Jurnal Teknik Sipil, 2019

Jembatan Mataraman II yang terletak di Kabupaten Malang memiliki panjang ± 40,8 m dengan lebar ± ... more Jembatan Mataraman II yang terletak di Kabupaten Malang memiliki panjang ± 40,8 m dengan lebar ± 11m. Jembatan ini semula didesain dengan standar bangunan atas tipe precast concrete I girder, metode girder precast, metode ini direkomendasikan pada jembatan Mataraman II, karena ekonomis, memperpendek waktu konstruksi dan workability. Jembatan eksisting ini didesain dengan tinggi I girder 1700 mm yang memiliki mutu beton precast concrete I girder K-500 (f’c 415 kg/cm2). Metode jembatan beton bertulang direkomendasikan pada jembatan ini, karena kriteria jembatan Mataraman II ini merupakan jembatan bentang pendek, sehingga jembatan beton bertulang cocok diterapkan dalam kasus ini. Selain itu juga, material yang digunakan memiliki sifat tahan lama, lebih ekonomis, dan mudah pemeliharaannya. Jembatan ini didesain dengan membangun abutment baru yang berjarak ± 2m dari abutment lama dikarenakan agar tidak mengganggu lebar mulut sungai, sehingga panjang jembatan menjadi 44,80m. Dikarenakan p...

Research paper thumbnail of Analysis Mooring System Configuration of Submerged Floating Tunnel

IPTEK Journal of Proceedings Series, 2017

Submerged Floating Tunnels (SFT) is a tubular structure that is submerged and floating in depth r... more Submerged Floating Tunnels (SFT) is a tubular structure that is submerged and floating in depth remains through the system of anchors consisting of a cable connected to the seabed. SFT structure imposed its own weight and is assisted by the buoyancy or uplift caused by water, cross sectin of the tunnel is designed so that buoyancy can overcome the structural weight and experienced a lift force that causes the floating structure. Fastening system (mooring system) also play a role which is to inhibit the SFT structure, minimize displacement and stress caused by environmental burden, such as earthquakes and hydrodynamic load that can aggravate the condition SFT structure in case of crossing the sea with SFT system. SFT will give a fairly small impact on the environment as it floated in the water, and with built using a modular system, the SFT (Submerged Floating Tunnels) can reach a distance long enough and does not cause pollution. Basically the same as the force that occurs archimides principle, where the objects are in the water to get a compressive force to the top. Cross sectional analysis SFT, will be modeled by 7 different models that have been in previous studies. The model's of SFT with steel cable to hold the structure in order to remain strong with the inclination selected. Analysis is done by modeling the triangle wiring configuration with different angle of incliflation cable. The analysis by comparing the test model were made earlier with prototype analyzed numerically. The expected structure did not undergo excessive deformation due to the environmental burden. Therefore, the structure of the SFT will be done with the Abaqus as finite element analysis. So, obvious deformation occurred in the cable. Therefore, it was expected to obtain the optimum angle of inclination was 54º.

Research paper thumbnail of Structural Damage Identification Methods in Truss Bridge Structures Using Vibration Analysis: A Review

E3S web of conferences, Dec 31, 2022

Developing countries will always engage in infrastructure development in various regions, and one... more Developing countries will always engage in infrastructure development in various regions, and one notable aspect of this development is the construction of steel frame bridges. Bridges are complex structures with a myriad of challenges. The increasing number of cases of steel frame bridge collapses has prompted humans to become more conscious of Structural Health Monitoring (SHM) activities. In order to implement this, the development of a straightforward structural damage detection method has been pursued, suitable for both simple and highly complex structures, commonly referred to as Vibration-Based Damage Detection (VBDD). Various algorithms have been proposed to achieve the goal of identifying structural damage, enabling prompt and accurate decision-making in handling such situations. This article delves into the discussion of several proposed algorithms for achieving this objective.

Research paper thumbnail of Analysis Mooring System Configuration of Submerged Floating Tunnel

Submerged Floating Tunnels (SFT) is a tubular structure that is submerged and floating in depth r... more Submerged Floating Tunnels (SFT) is a tubular structure that is submerged and floating in depth remains through the system of anchors consisting of a cable connected to the seabed. SFT structure imposed its own weight and is assisted by the buoyancy or uplift caused by water, cross sectin of the tunnel is designed so that buoyancy can overcome the structural weight and experienced a lift force that causes the floating structure. Fastening system (mooring system) also play a role which is to inhibit the SFT structure, minimize displacement and stress caused by environmental burden, such as earthquakes and hydrodynamic load that can aggravate the condition SFT structure in case of crossing the sea with SFT system. SFT will give a fairly small impact on the environment as it floated in the water, and with built using a modular system, the SFT (Submerged Floating Tunnels) can reach a distance long enough and does not cause pollution. Basically the same as the force that occurs archimides principle, where the objects are in the water to get a compressive force to the top. Cross sectional analysis SFT, will be modeled by 7 different models that have been in previous studies. The model's of SFT with steel cable to hold the structure in order to remain strong with the inclination selected. Analysis is done by modeling the triangle wiring configuration with different angle of incliflation cable. The analysis by comparing the test model were made earlier with prototype analyzed numerically. The expected structure did not undergo excessive deformation due to the environmental burden. Therefore, the structure of the SFT will be done with the Abaqus as finite element analysis. So, obvious deformation occurred in the cable. Therefore, it was expected to obtain the optimum angle of inclination was 54º.

Research paper thumbnail of Studi Komparasi Parameter Respons Spectrum Gempa Sni 1726-2012 Terhadap Sni 1726-2019 Dengan Studi Kasus Gedung C Stie Perbanas

Indonesia has standardized plans for earthquake-resistant building namely SNI 1726-2012. The deve... more Indonesia has standardized plans for earthquake-resistant building namely SNI 1726-2012. The development of ASCE 7 as the reference for SNI 1726 has triggered the renewal of standard in 2019 to be SNI 1726-2019,Therefore, the renewal has underpinned the comparative study on Building C of STIE PERBANAS. This research aimed at investigating the differences of respons spectrum analysis and loading combination, due to the changes of earthquake map by supporting program SAP2000. The research results demonstrated that the values of S S and S 1 in SNI 1726-2019 improved 2.242% and 23.08% consecutively. As a result, vertical earthquake increased the coefficient of maximum dead load in the combination SNI 1726-2019 by 0.797%.

Research paper thumbnail of Analysis Mooring System Configuration of Submerged Floating Tunnel

Aptech Proceeding International Seminar on Applied Technology, Science & Arts : Development of Green Agro-Industry to Support Human Life Sustainability, Apr 18, 2017

Submerged Floating Tunnels (SFT) is a tubular structure that is submerged and floating in depth r... more Submerged Floating Tunnels (SFT) is a tubular structure that is submerged and floating in depth remains through the system of anchors consisting of a cable connected to the seabed. SFT structure imposed its own weight and is assisted by the buoyancy or uplift caused by water, cross sectin of the tunnel is designed so that buoyancy can overcome the structural weight and experienced a lift force that causes the floating structure. Fastening system (mooring system) also play a role which is to inhibit the SFT structure, minimize displacement and stress caused by environmental burden, such as earthquakes and hydrodynamic load that can aggravate the condition SFT structure in case of crossing the sea with SFT system. SFT will give a fairly small impact on the environment as it floated in the water, and with built using a modular system, the SFT (Submerged Floating Tunnels) can reach a distance long enough and does not cause pollution. Basically the same as the force that occurs archimides principle, where the objects are in the water to get a compressive force to the top. Cross sectional analysis SFT, will be modeled by 7 different models that have been in previous studies. The model's of SFT with steel cable to hold the structure in order to remain strong with the inclination selected. Analysis is done by modeling the triangle wiring configuration with different angle of incliflation cable. The analysis by comparing the test model were made earlier with prototype analyzed numerically. The expected structure did not undergo excessive deformation due to the environmental burden. Therefore, the structure of the SFT will be done with the Abaqus as finite element analysis. So, obvious deformation occurred in the cable. Therefore, it was expected to obtain the optimum angle of inclination was 54º.

Research paper thumbnail of Modifikasi Jembatan Mataraman II Malang Menggunakan Struktur Gelagar Beton Bertulang

Rekayasa : jurnal sipil, Jul 31, 2019

Jembatan Mataraman II yang terletak di Kabupaten Malang memiliki panjang ± 40,8 m dengan lebar ± ... more Jembatan Mataraman II yang terletak di Kabupaten Malang memiliki panjang ± 40,8 m dengan lebar ± 11m. Jembatan ini semula didesain dengan standar bangunan atas tipe precast concrete I girder, metode girder precast, metode ini direkomendasikan pada jembatan Mataraman II, karena ekonomis, memperpendek waktu konstruksi dan workability. Jembatan eksisting ini didesain dengan tinggi I girder 1700 mm yang memiliki mutu beton precast concrete I girder K-500 (f'c 415 kg/cm2). Metode jembatan beton bertulang direkomendasikan pada jembatan ini, karena kriteria jembatan Mataraman II ini merupakan jembatan bentang pendek, sehingga jembatan beton bertulang cocok diterapkan dalam kasus ini. Selain itu juga, material yang digunakan memiliki sifat tahan lama, lebih ekonomis, dan mudah pemeliharaannya. Jembatan ini didesain dengan membangun abutment baru yang berjarak ± 2m dari abutment lama dikarenakan agar tidak mengganggu lebar mulut sungai, sehingga panjang jembatan menjadi 44,80m. Dikarenakan panjang jembatan > 25m maka kurang efektif dalam penggunaan gelagar beton bertulang, oleh karena itu direncanakan pilar yang berjarak ± 10m dari rencana abutment baru. Perencanaan abutment direncanakan dengan didukung pondasi sumuran, dikarenakan pada kedalaman 4 m-5 m harga N-SPT didapatkan N > 50 (tanah keras).

Research paper thumbnail of Penambahan Stressing Bar Pada Perencanaan Struktur Baja Gedung Parkir di Institut Teknologi Adhi Tama Surabaya

Prosiding Seminar Nasional Sains dan Teknologi Terapan, Sep 28, 2019

Perencanaan pada gedung parkir terpusat di Institut Teknologi Adhi Tama Surabaya dengan acuan dat... more Perencanaan pada gedung parkir terpusat di Institut Teknologi Adhi Tama Surabaya dengan acuan data survey SRP volume puncak kendaraan oleh made dkk (2017) jumlah kendaraan yang parkir 1299 motor, angka ini akan meningkat pada kondisi tertentu hingga mencapai 2000 kendaraan. Gedung parkir terpusat direncanakan dengan menggunakan metode strukrur baja konvensional, dalam perencanaan ini dilakukan peninjauan salah satu girder-nya yang direncanakan dengan penambahan stressing bar (baja pratengang) pada sayap bawah girder. Berdasarkan hasil perbandingan dalam perencanaan dengan menggunakan metode strukrur baja konvensional profil girder menggunakan WF350x175x7x11 dengan ratio momen 0.8, metode ini mendapatkan profil yang lebih besar dibandingkan dengan cara penambahan stressing bar (baja pratengan) yang menggunakan profil girder WF300x150x6.5x7 didapatkan ratio momen 0.87 dengan strand mutu G270 diameter 9.5 mm dan tarikan sebesar 9272.81 kg. Dalam penggunaan profil WF300x150x6.5x9 dengan penambahan stressing bar dapat mengefisiensi berat tiap balok utamanya hingga ±25%. Tetapi dengan penambahan stressing bar pada balok utama akan menambah waktu dalam pelaksanaannya di lapangan.

Research paper thumbnail of Modifikasi Struktur Jembatan Sumber Sari, Kalimantan Timur dengan menggunakan Sistem Busur

Jurnal Teknik Sipil, May 29, 2020

Indonesia is an island nation, and is crossed by rivers in each of its islands. Bridges have an i... more Indonesia is an island nation, and is crossed by rivers in each of its islands. Bridges have an important role in Indonesia, both long and short span bridges connecting inter islands and with river barriers have been built in Indonesia. This research focuses on Bridge Design using a steel bow system that contains artistic value, besides having a strong structure, this bridge also has a high aesthetic value. Sumber Sari Bridge, located in West Kutai, East Kalimantan has a span of 82 m with 2 vehicle lanes each 4 m wide. This bridge is a long span bridge. The initial stage of planning is the planning of the upper building consisting of vehicle floors and sidewalks, longitudinal girder and transverse girder, then the construction of the main bearer. Analysis using the SAP 2000 program is carried out after knowing the burdens that work on the construction to get the forces inside that work, especially for the main bearer construction and secondary construction. After the forces are known the magnitude of the voltage control calculations and connection calculations are performed. For the lower structure, an abutment (head of the bridge) is planned with a pile foundation.

Research paper thumbnail of Modifikasi Struktur Jembatan Sumber Sari, Kalimantan Timur dengan menggunakan Sistem Busur

Jurnal Teknik Sipil, 2020

Indonesia merupakan negara kepulauan, serta dilewati oleh sungai-sungai di setiap pulaunya. Jemba... more Indonesia merupakan negara kepulauan, serta dilewati oleh sungai-sungai di setiap pulaunya. Jembatan memiliki peranan yang penting di Indonesia, jembatan bentang panjang maupun bentang pendek yang menghubungkan antar pulau maupun dengan hambatan sungai telah banyak dibangun di Indonesia. Penelitian ini fokus pada Perencanaan Jembataan dengan menggunakan sistem busur baja yang mengandung nilai seni, selain memiliki struktur yang kuat, jembatan ini juga memiliki nilai estetika yang tinggi. Jembatan Sumber Sari, yang terletak di Kutai Barat, Kalimantan Timur memiliki bentang 82 m dengan 2 lajur kendaraan masing-masing selebar 4 m. Jembatan ini merupakan Jembatan bentang Panjang. Tahap awal perencanaan adalah perencanaan bangunan atas yang terdiri dari lantai kendaraan dan trotoar, gelagar memanjang dan gelagar melintang, kemudian konstruksi pemikul utama. Analisa dengan menggunakan program SAP 2000 dilakukan setelah dketahui beban – beban yang bekerja pada konstruksi tersebut untuk men...

Research paper thumbnail of Pengaruh Penggunaan Zat Aditif Tipe C Pada Kuat Tekan Beton

Jurnal Teknik Sipil, 2021

Dalam industri konstruksi pengembangan dan penggunaan semen campuran semakin meningkat. Hal ini b... more Dalam industri konstruksi pengembangan dan penggunaan semen campuran semakin meningkat. Hal ini bertujuan untuk meminimalisir penggunaan semen. Penggunaan Fly ash sebagai material pengganti untuk mengurangi jumlah semen, memiliki kelebihan, diantaranya menghemat biaya dan mengurangi dampak negatif pada lingkungan. Akan tetapi, berdasarkan penelitian mutakhir, didapatkan bahwa penggunaan fly ash diatas 30% akan menurunkan kuat tekan beton. Penggunaan zat aditif berfungsi untuk kemudahan pengerjaan ataupun mempercepat pengikatan pada beton dengan maksud mempersingkat waktu pelaksanaan konstruksi di lapangan. Zat aditif tipe C (Accelerator) digunakan untuk mengurangi lamanya waktu pengeringan (hidrasi), dan mempercepat pencapaian kekuatan beton. Dalam penelitian ini, dilakukan pembesaran prosentase penggunaan fly ash dengan tetap mempertahankan tercapainya mutu beton rencana, yaitu dengan cara penambahan zat aditf tipe C dari berat total bahan pengikat. Prosentase penggunaan fly ash t...

Research paper thumbnail of Penambahan Stressing Bar Pada Perencanaan Struktur Baja Gedung Parkir di Institut Teknologi Adhi Tama Surabaya

Perencanaan pada gedung parkir terpusat di Institut Teknologi Adhi Tama Surabaya dengan acuan dat... more Perencanaan pada gedung parkir terpusat di Institut Teknologi Adhi Tama Surabaya dengan acuan data survey SRP volume puncak kendaraan oleh made dkk (2017) jumlah kendaraan yang parkir 1299 motor, angka ini akan meningkat pada kondisi tertentu hingga mencapai 2000 kendaraan. Gedung parkir terpusat direncanakan dengan menggunakan metode strukrur baja konvensional, dalam perencanaan ini dilakukan peninjauan salah satu girder-nya yang direncanakan dengan penambahan stressing bar (baja pratengang) pada sayap bawah girder. Berdasarkan hasil perbandingan dalam perencanaan dengan menggunakan metode strukrur baja konvensional profil girder menggunakan WF350x175x7x11 dengan ratio momen 0.8, metode ini mendapatkan profil yang lebih besar dibandingkan dengan cara penambahan stressing bar (baja pratengan) yang menggunakan profil girder WF300x150x6.5x7 didapatkan ratio momen 0.87 dengan strand mutu G270 diameter 9.5 mm dan tarikan sebesar 9272.81 kg. Dalam penggunaan profil WF300x150x6.5x9 dengan...

Research paper thumbnail of Analisa Perbandingan Kolom Komposit Inside Steel dan Outside Steel terhadap Kapasitas Tahanan Aksial dan Momen

Reka Buana : Jurnal Ilmiah Teknik Sipil dan Teknik Kimia, 2020

ABSTRAK Penggunaan kolom komposit telah banyak digunakan di berbagai bangunan bangunan tinggi. Da... more ABSTRAK Penggunaan kolom komposit telah banyak digunakan di berbagai bangunan bangunan tinggi. Dan pada umumnya, Kolom komposit dibagi menjadi 2 macam, yaitu kolom komposit inside steel dan outside steel dengan struktur baja terbungkus oleh beton disebut dengan kolom inside steel atau bisa saja disebut Concrete Encased Column. Sedangkan untuk baja yang berisi beton disebut dengan kolom outside steel atau juga disebut Concrete Filled Column. Penggunaan struktur kolom komposit outside steel sebagai kolom utama dalam mendukung beban lateral pada struktur rangka bangunan belum lazim digunakan dalam perkembangan konstruksi saat ini. Oleh karena itu, perlu dilakukan analisa kekuatan dari 2 macam kolom komposit agar diketahui jenis kolom komposit yang paling efektif dan memiliki kekuatan paling tinggi. Perhitungan yang dilakukan dengan menggunakan perhitungan manual pada kolom komposit inside steel dan outside steel yang berbentuk kotak, sedangkan untuk perhitungan dengan menggunakan progr...

Research paper thumbnail of Pile Foundation Analysis on High – Rise Building using Finite Element-Spring Method on Sandy Clay Soil

IOP Conference Series: Materials Science and Engineering, 2019

It is a common thing used by a planner to get the pile foundation needs with the finite element p... more It is a common thing used by a planner to get the pile foundation needs with the finite element program. The output generated from the finite element program is then processed to produce the required number of piles on the planned structure. The finite element program that is often used is SAP2000. From several cases in the field, there were differences in the results of the number of piles needed between the analysis using the manual calculation method with the Nakazawa method. So, in this paper a comparison of the need for piles based on the manual calculation method with Nakazawa method will be compared, which is devoted to soft soil material according to soil data. The results showed that the number of pile requirements based on the Nakazawa method (n = 244 pieces) was much smaller than the manual calculation method (n = 320 pieces). This shows that the analysis of pile needs is more effective with the use of the Nakazawa method.

Research paper thumbnail of Penggunaan Beam Bracing Sebagai Pengganti Shear Wall Pada Proyek Pembangunan Gedung Bertingkat Tinggi

Pembangunan gedung bertingkat telah menjadi prioritas utama, keterbatasan lahan yang tersedia mak... more Pembangunan gedung bertingkat telah menjadi prioritas utama, keterbatasan lahan yang tersedia maka dibuat bangunan yang memaksimalkan penggunaan lahan dengan membuat bangunan yang bertingkat misalnya bangunan tinggi. Pada bangunan tinggi material utama biasanya yang digunakan yaitu shear wall. Penggunaan shear wall memiliki banyak kekurangan dan penelitian ini penggunaan shear wall diganti dengan pengaku beam bracing. Fungsi bracing adalah untuk memperkuat struktur secara keseluruhan. Tujuan dari penelitian ini untuk mendapatkan hasil kontrol Analisa penggunaan beam Bracing sebagai pengganti shear wall. Permodelan dan Analisa Struktur menggunakan SAP2000 v.14.2.5 dengan 4 desain yang sudah disempurnakan. Hasil analisa dari penelitian tersebut desain 4 (Sistem Rangka dan Bracing) memenuhi persyaratan periode getar fundamental yang terjadi. Selisih nilai gaya geser dasar (base shear) dari hitungan manual dan SAP2000 dengan nilai rata-rata selisih berkisar 3,5%. Penurunan nilai simpangan horisontal arah X dan Y paling besar pada Desain 4 yaitu sebesar 75,91% dan 19,73%. Dengan hasil analisis tersebut dapat disimpulkan bahwa Desain 4 (Sistem Rangka dan Bracing) mampu digunakan sebagai pengganti Shear Wall berdasarkan nilai-nilai simpangan horisontal arah X dan Y.

Research paper thumbnail of Modifikasi Jembatan Mataraman II Malang Menggunakan Struktur Gelagar Beton Bertulang

Rekayasa: Jurnal Teknik Sipil, 2019

Jembatan Mataraman II yang terletak di Kabupaten Malang memiliki panjang ± 40,8 m dengan lebar ± ... more Jembatan Mataraman II yang terletak di Kabupaten Malang memiliki panjang ± 40,8 m dengan lebar ± 11m. Jembatan ini semula didesain dengan standar bangunan atas tipe precast concrete I girder, metode girder precast, metode ini direkomendasikan pada jembatan Mataraman II, karena ekonomis, memperpendek waktu konstruksi dan workability. Jembatan eksisting ini didesain dengan tinggi I girder 1700 mm yang memiliki mutu beton precast concrete I girder K-500 (f’c 415 kg/cm2). Metode jembatan beton bertulang direkomendasikan pada jembatan ini, karena kriteria jembatan Mataraman II ini merupakan jembatan bentang pendek, sehingga jembatan beton bertulang cocok diterapkan dalam kasus ini. Selain itu juga, material yang digunakan memiliki sifat tahan lama, lebih ekonomis, dan mudah pemeliharaannya. Jembatan ini didesain dengan membangun abutment baru yang berjarak ± 2m dari abutment lama dikarenakan agar tidak mengganggu lebar mulut sungai, sehingga panjang jembatan menjadi 44,80m. Dikarenakan p...

Research paper thumbnail of Analysis Mooring System Configuration of Submerged Floating Tunnel

IPTEK Journal of Proceedings Series, 2017

Submerged Floating Tunnels (SFT) is a tubular structure that is submerged and floating in depth r... more Submerged Floating Tunnels (SFT) is a tubular structure that is submerged and floating in depth remains through the system of anchors consisting of a cable connected to the seabed. SFT structure imposed its own weight and is assisted by the buoyancy or uplift caused by water, cross sectin of the tunnel is designed so that buoyancy can overcome the structural weight and experienced a lift force that causes the floating structure. Fastening system (mooring system) also play a role which is to inhibit the SFT structure, minimize displacement and stress caused by environmental burden, such as earthquakes and hydrodynamic load that can aggravate the condition SFT structure in case of crossing the sea with SFT system. SFT will give a fairly small impact on the environment as it floated in the water, and with built using a modular system, the SFT (Submerged Floating Tunnels) can reach a distance long enough and does not cause pollution. Basically the same as the force that occurs archimides principle, where the objects are in the water to get a compressive force to the top. Cross sectional analysis SFT, will be modeled by 7 different models that have been in previous studies. The model's of SFT with steel cable to hold the structure in order to remain strong with the inclination selected. Analysis is done by modeling the triangle wiring configuration with different angle of incliflation cable. The analysis by comparing the test model were made earlier with prototype analyzed numerically. The expected structure did not undergo excessive deformation due to the environmental burden. Therefore, the structure of the SFT will be done with the Abaqus as finite element analysis. So, obvious deformation occurred in the cable. Therefore, it was expected to obtain the optimum angle of inclination was 54º.