Combination of Aco and Pso to Minimize Makespan in Ordered Flowshop Scheduling Problems (original) (raw)
Related papers
A new heuristic for the flowshop scheduling problem to minimize makespan and maximum tardiness
International Journal of Production Research, 2009
Optimization of makespan for no-wait flowshop scheduling problems using efficient matheuristics
Omega, 2016
Genetic Algorithm for Permutation Flowshop Scheduling Problem to Minimize the Makespan
2014
Flowshop Scheduling Problem for 10-Jobs, 10-Machines By Heuristics Models Using Makespan Criterion
Applied Mathematics and Computation, 2006
Scheduling batch processing machines in a no-wait flow shop using ACO to minimise the makespan
International Journal of Industrial and Systems Engineering, 2017
A hybrid approach for minimizing makespan in permutation flowshop scheduling
Journal of Systems Science and Systems Engineering, 2017
Flowshop-scheduling problems with makespan criterion: a review
2005
Makespan minimization of a flowshop sequence-dependent group scheduling problem
A three-phase algorithm for flowshop scheduling with blocking to minimize makespan
Computers & Operations Research, 2012
Journal of marine science and technology, 2006
A heuristic algorithm for scheduling in a flow shop environment to minimize makespan
Scheduling a two-stage flowshop under makespan constraint
Mathematical and Computer …, 2006
European Journal of Operational Research, 2005
IAEME PUBLICATION, 2020
An improved heuristic for permutation flowshop scheduling
International Journal of Information and Communication Technology, 2007
Minimizing makespan for solving the distributed no-wait flowshop scheduling problem
Computers & Industrial Engineering
Adaptation and parameters studies of CS algorithm for flow shop scheduling problem
International Journal of Electrical and Computer Engineering (IJECE)
International Journal of Electrical and Computer Engineering (IJECE), 2021
A search algorithm for the generalized flowshop scheduling problem
Computers & Operations Research, 1975
PSO and simulated annealing for the two-machine flowshop scheduling problem with coupled-operations
European J. of Industrial Engineering, 2018
Modified Heuristics for Scheduling in Flow Shop to Minimize Makespan
Journal of Al-Rafidain University College For Sciences ( Print ISSN: 1681-6870 ,Online ISSN: 2790-2293 ), 2021
New hard benchmark for flowshop scheduling problems minimising makespan
2014
An Application On Flowshop Scheduling
2013
Minimizing makespan for a no-wait flowshop using genetic algorithm
Sadhana, 2012
Computers & Industrial Engineering, 2004
A multicriteria flowshop scheduling problem with setup times
2007
An Improved Algorithm for Minimizing Makespan on Flowshops with Uncertain Processing Times
2021
A high performing metaheuristic for multi-objective flowshop scheduling problem
Computers & Operations Research, 2014
ACO-LS Algorithm for Solving No-wait Flow Shop Scheduling Problem
Communications in Computer and Information Science, 2015
ICMIEE-PI-14016310 000 Minimization of Makespan in Flow Shop Scheduling Using Heuristics
2014
Chaos Solitons & Fractals, 2008