Bi-objective Optimization for Just in Time Scheduling: Application to the Two-Stage Assembly Flow Shop Problem (original) (raw)
Related papers
10th International Industrial engineering Conference
2009 IEEE International Conference on Industrial Engineering and Engineering Management, 2009
Two-stage flow-shop scheduling problem with non-identical second stage assembly machines
Fariborz Jolai, S.m.t. Fatemi Ghomi
The International Journal of Advanced Manufacturing Technology, 2013
Two-machine flow shop scheduling to minimize the sum of maximum earliness and tardiness
International Journal of Production Economics, 2009
Three meta-heuristics to solve the no-wait two-stage assembly flow-shop scheduling problem
Two new meta-heuristics for a bi-objective supply chain scheduling problem in flow-shop environment
Applied Soft Computing, 2016
Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines
Malaysian Journal of Mathematical Sciences
Two Stage Assembly Flowshop Scheduling Problem Minimizing Total Tardiness
World Academy of Science, Engineering and Technology, International Journal of Industrial and Manufacturing Engineering, 2016
Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times
2010
Journal of Industrial Engineering, International, 2012
Computers & Industrial Engineering, 2018
International Journal of Industrial and Systems Engineering, 2017
Journal of Industrial Engineering International, 2012
Assembly flowshop scheduling problem to minimize total tardiness
2012
Some heuristics for the hybrid flow shop scheduling problem with setup and assembly operations
Optimal scheduling of the 3-machine assembly-type flow shop
RAIRO - Operations Research, 1999
The International Journal of Advanced …, 2008
Heuristics for production scheduling problem with machining and assembly operations
International Journal of Industrial Engineering Computations, 2012
International Journal of Advanced Manufacturing Technology, Vol. 37, 2008, 354 - 370
A two-phase fuzzy programming model for a complex bi-objective no-wait flow shop scheduling
international journal of industrial engineering computations, 2012
Earliness/tardiness minimization in a no-wait flow shop with sequence-dependent setup times
Journal of Project Management, 2022
Two‐machine open shop scheduling with secondary criteria
International Transactions in Operational Research, 2003
Bi-criteria scheduling of a flowshop manufacturing cell with sequence dependent setup times
European J. of Industrial Engineering, 2007
An enumerative algorithm for two-machine flow shop problems with earliness and tardiness penalties
2014
Optimizing a multi-objectives flow shop scheduling problem by a novel genetic algorithm
International Journal of Industrial Engineering Computations, 2013
Metaheuristic approaches to the hybrid flow shop scheduling problem with a cost-related criterion