Integrated planning of spare parts and service engineers with partial backlogging (original) (raw)
Related papers
Optimizing spare parts inventory in shipping industry
OR in spare parts management: A review
European Journal of Operational Research, 2017
Material and capacity requirements planning with dynamic lead times
International Journal of Production Research, 2012
Dynamic planning and multicriteria scheduling of turned parts' production
Tehnicki Vjesnik, 2010
Integrated Operations (Re-)Scheduling from Mine to Ship
International Conference on Automated Planning and Scheduling, 2013
Maintenance Planning Optimization Based on PHM Information and Spare Parts Availability
Annual Conference of the PHM Society, 2013
Service differentiation in spare parts supply through dedicated stocks
Annals of Operations Research, 2013
Capacity planning and lead time management
International Journal of Production Economics, 1996
Inventory management and production planning and scheduling
1998
IFAC Proceedings Volumes, 2009
Rescheduling due to machine disruption to minimize the total weighted completion time
Journal of Scheduling, 2018
Integrated Production and Predictive Maintenance Planning based on Prognostic Information
2019
Planning in assembly systems — A common modeling for products and resources
Proceedings of 2012 IEEE 17th International Conference on Emerging Technologies & Factory Automation (ETFA 2012), 2012
Production planning with load dependent lead times
4OR, 2005
A Production Planning Model for an Aluminum Company
Journal of King Saud University - Engineering Sciences, 1994
International Journal of Production Economics, 2018
Mathematics, 2023
Joint planning of service engineers and spare parts
European Journal of Operational Research, 2018
Optimization of Production Planning for a Flexible Assembly Technology on a Mechatronics Line
Studies in Informatics and Control, 2021
Joint Optimization of Maintenance and Production Policies
2014
An Optimization Tool for Process Planning and Scheduling
IFIP Advances in Information and Communication Technology, 2014
Project scheduling and equipment planning with random breakdowns
RAIRO - Operations Research, 2017
Last time buy and repair decisions for spare parts
European Journal of Operational Research, 2015
Decision Support for Material Procurement
Operations Research Proceedings, 2020
A post-prognostic decision approach for production and maintenance planning
HAL (Le Centre pour la Communication Scientifique Directe), 2018
Service parts inventory control with lateral transshipment that takes time
2010
An Automated Assembly Process Planning System
Procedia CIRP, 2016
2016
Dynamic scheduling for complex engineer-to-order products
International Journal of Production Research, 2007
Production Scheduling on Practical Problems
Production Scheduling, 2012
Stage due date planning for multistage assembly systems
International Journal of Production Research, 2001
A Deteriorating Supply Chain Planning wi
Order fulfilment process improvement in a ceramic industry
Procedia Manufacturing, 2019
Multi-Project Scheduling Cost Optimization in a Machine Manufacturer Engineer-to-Order
Makara Journal of Technology, 2016
Planning Complex Engineer-To-Order Products
Recent Advances in Integrated Design and Manufacturing in Mechanical Engineering, 2003