dbo:abstract |
The Gribo–Popoli Power Station, also Gribo Popoli Power Station, is a hydroelectric power station under construction across the Sassandra River, in Ivory Coast. This renewable energy power station is owned and is under development by the Government of Ivory Coast, through its wholly owned subsidiary, CI-Energies, the national electricity utility parastatal company. With partial funding from the Exim Bank of China, the engineering, procurement and construction (EPC) contract was awarded to Sinohydro, the Chinese hydropower engineering and construction company. CI-Energies is the expected off-taker of the energy generated here. Construction is reported to have started in 2021, with commissioning anticipated in 2024. (en) |
dbo:buildingStartDate |
2021 |
dbo:buildingStartYear |
2021-01-01 (xsd:gYear) |
dbo:description |
Gravity dam (en) |
dbo:location |
dbr:Ivory_Coast |
dbo:openingYear |
2024-01-01 (xsd:gYear) |
dbo:part |
dbr:Gribo–Popoli_Hydroelectric_Power_Station__PowerStation__1 |
dbo:river |
dbr:Sassandra_River |
dbo:wikiPageExternalLink |
https://www.google.com/maps/place/5%C2%B041'53.0%22N+6%C2%B034'17.0%22W/@5.7147139,-6.6291977,42036m/data=!3m1!1e3!4m5!3m4!1s0x0:0xb9214e2de4e926e5!8m2!3d5.6980556!4d-6.5713889 |
dbo:wikiPageID |
70694989 (xsd:integer) |
dbo:wikiPageLength |
7041 (xsd:nonNegativeInteger) |
dbo:wikiPageRevisionID |
1095418011 (xsd:integer) |
dbo:wikiPageWikiLink |
dbr:Bas-Sassandra_District dbr:List_of_power_stations_in_Ivory_Coast dbr:Sinohydro dbc:Nawa_Region dbr:Sassandra_River dbr:Abidjan dbr:Exim_Bank_of_China dbc:Bas-Sassandra_District dbr:Gravity_dam dbr:Ivory_Coast dbr:Soubré dbr:Soubré_Department dbr:Soubré_Hydroelectric_Power_Station dbr:Parastatal dbr:Nawa_Region dbr:Government_of_Ivory_Coast dbr:Engineering,_procurement_and_construction dbr:San_Pedro,_Ivory_Coast |
dbp:constructionBegan |
2021 (xsd:integer) |
dbp:cost |
3.08E8 |
dbp:damCrosses |
dbr:Sassandra_River |
dbp:damType |
dbr:Gravity_dam |
dbp:location |
Ivory Coast (en) |
dbp:locationMap |
Ivory Coast#Africa#World (en) |
dbp:locationMapCaption |
Placement on map is approximate (en) Location of Gribo–Popoli Dam (en) |
dbp:name |
Gribo–Popoli Dam (en) |
dbp:opening |
2024 (xsd:integer) |
dbp:plantAnnualGen |
580.0 |
dbp:plantCommission |
2024 (xsd:integer) |
dbp:wikiPageUsesTemplate |
dbt:Authority_control dbt:Center dbt:Convert dbt:Coord dbt:EngvarB dbt:Portal dbt:Reflist dbt:Short_description dbt:Stack dbt:Use_dmy_dates dbt:Infobox_dam |
dcterms:subject |
dbc:Nawa_Region dbc:Bas-Sassandra_District |
georss:point |
5.698055555555555 -6.5713888888888885 |
rdf:type |
owl:Thing dbo:Infrastructure wikidata:Q12323 dbo:Dam geo:SpatialThing dbo:ArchitecturalStructure |
rdfs:comment |
The Gribo–Popoli Power Station, also Gribo Popoli Power Station, is a hydroelectric power station under construction across the Sassandra River, in Ivory Coast. This renewable energy power station is owned and is under development by the Government of Ivory Coast, through its wholly owned subsidiary, CI-Energies, the national electricity utility parastatal company. (en) |
rdfs:label |
Gribo–Popoli Hydroelectric Power Station (en) |
owl:sameAs |
wikidata:Gribo–Popoli Hydroelectric Power Station https://global.dbpedia.org/id/GVwFn |
geo:geometry |
POINT(-6.5713887214661 5.6980557441711) |
geo:lat |
5.698056 (xsd:float) |
geo:long |
-6.571389 (xsd:float) |
prov:wasDerivedFrom |
wikipedia-en:Gribo–Popoli_Hydroelectric_Power_Station?oldid=1095418011&ns=0 |
foaf:isPrimaryTopicOf |
wikipedia-en:Gribo–Popoli_Hydroelectric_Power_Station |
foaf:name |
Gribo–Popoli Dam (en) |
is dbo:wikiPageRedirects of |
dbr:Gribo-Popoli_Hydroelectric_Power_Station |
is dbo:wikiPageWikiLink of |
dbr:List_of_power_stations_in_Ivory_Coast dbr:Gribo-Popoli_Hydroelectric_Power_Station dbr:Soubré_Hydroelectric_Power_Station |
is foaf:primaryTopic of |
wikipedia-en:Gribo–Popoli_Hydroelectric_Power_Station |