RM 1 (IM 1) (original) (raw)

Please make a donation to support Gunter's Space Page.
Thank you very much for visiting Gunter's Space Page. I hope that this site is useful and informative for you.
If you appreciate the information provided on this site, please consider supporting my work by making a simple and secure donation via PayPal. Please help to run the website and keep everything free of charge. Thank you very much.

RM 1 [NASA]

RM 1 (Research Module 1, IM 1, Issledovatel'ny Modul') was a Russian science module of the International space station ISS. Due to the deletion of several modules, it was eventually planned to take the place originally reserved for the UDM (Universal Docking Module), which was originally planned as a hub for two RM type modules.

The RM 1 was be based on the TKS-type of module. In contrast to earlier configurations, the RM 1 was to have three solar panels as a remedy to the power-shortfall of the Russian segment caused by the cancellation of the SPP (Solar Power Platform). Additionally it was to get a multi-port docking adaptor to allow the docking of Soyuz-TMAand Progress-M supply ships.

RM 1 has been cancelled in 2007 leaving the MLM as the only large Russian research module. A second research module RM 2 has been cancelled earlier.

Nation: Russia
Type / Application: Space Station module
Operator: Rosaviakosmos
Contractors: GKNPTs Khrunichev
Equipment:
Configuration: TKS Type
Propulsion:
Power: 3 deployable solar arrays, batteries
Lifetime: 15 years
Mass: 20300 kg
Orbit: 400 km × 400 km, 51.6� (typical)
Satellite COSPAR Date LS Launch Vehicle Remarks
RM 1 (IM 1) - cancelled Ba Proton-M
RM 2 (IM 2) - cancelled Ba Proton-M

Further ISS missions: ISS complex

Pressurized elements: BEAM Bishop (NanoRacks Airlock Module) CAM - cancelled CM (FGB, Zarya) COF (Columbus) Cupola DC 1, 2 (SO 1, 2 / Pirs) DSM - cancelled Hab - cancelled ICM - cancelled IDA 1, 2, 3 JAM (Quest) JLP (JEM-ELM-PS) JPM (JEM-PM, Kibo) Lab (Destiny) LSM - cancelled LUNA (UrtheCast 2) - cancelled MLM-U (Nauka) MPM (Enterprise) - cancelled MRM 1 (Rassvet) MRM 2 (Poisk) Node 1 (Unity) Node 2, 3 (Harmony, Tranquility) Oka-T 1 - cancelled PMA 1, 2, 3 PMM (Leonardo) RM 1, 2 - cancelled ShK SM (Zvesda, DOS 8) SPP (NEP) - cancelled UDM (USM) - cancelled UM (Prichal) Unpressurized elements: Bartolomeo (CEPHFISS) iROSA 1A, 1B, 2A, 2B, 3A, 3B, 4A, 4B ITS-S0 ITS-S1, P1 ITS-S3/4, P3/4 ITS-S5, P5 ITS-S6, P6 ITS-Z1 JEF (JEM-EF) JLE (JEM-ELM-ES) Attached payloads: AMS 02 ASIM AWE CALET CATS CLARREO Pathfinder (CPF) CODEX CREAM ECOSTRESS EMIT GEDI GEROS-ISS HDEV HISUI HREP ICS-EF ILLUMA-T iSIM MAXI MCE MISSE 1, ..., 8 MISSE-FF 1, 2 MUSES NICER OCO 3 OPALS RapidScat ROSA RRM3 SAGE 3 SCaN-Testbed SDS SEDA-AP SMILES STP-H3 STP-H4 STP-H5 STP-H6 STP-H7 STP-H8 STP-H9 TSIS 1 UrtheCast 1 Logistics: ATV Cygnus Cygnus (enh.) Dragon CRS-1,... CRS-20 Dragon CRS-21,... CRS-35 Dream Chaser Cargo ELC HTV (Kounotori) HTV-X MPLM Progress-M Progress-M (mod) Progress-M1 Progress-MS Soyuz-GVK

Cite this page: