Irapuan Gloria Junior | Universidade Paulista (original) (raw)
Papers by Irapuan Gloria Junior
Journal of Global Information Management, 2018
The development of information technology projects is no longer limited to the domestic sphere. T... more The development of information technology projects is no longer limited to the domestic sphere. This study identifies the differentiation of risk categories between global and domestic projects through an exploratory research carried out by way of a systematic literature review. 1367 risks were identified in 37 articles and classified within 22 categories. The major concern regard of domestic project management was client (external risk) and scope (internal risk) and about global project management was psychic distance (external) and coordination and control (internal). The main difference between the risk categories for each project type refers to the psychic distance category that was identified almost exclusively in global projects, which makes external risks more numerous than in domestic projects. In the other hand, it makes risks as client, supplier and stakeholders be underestimated. The results indicate that the project managers should focus their attention on different risks depending on the type of IT project, global or domestic.
Entre as empresas da indústria de cosméticos é possível perceber uma macrotendência sendo estabel... more Entre as empresas da indústria de cosméticos é possível perceber uma macrotendência sendo estabelecida com a busca de produtos sustentáveis. Desta forma as empresas precisam se adaptar adequando-se a certificação de selos de sustentabilidade disponíveis no mercado. A metodologia desta pesquisa é um estudo de caso único, qualitativo e interpretativista. Possui como objetivos apresentar os principais processos de certificação dos selos de certificação existentes e identificar os impactos que a doção desses selos causam na empresa no setor de HPPC. Os resultados foram a apresentação dos processos de certificação dos selos ECOCERT e IBD e uma lista de 9 impactos na empresa. As contribuições para a academia é a de apresentar que há uma alteração não apenas no setor produtivo, mas em outros processos, a contribuição para a prática foi para que os gestores de outras empresas, que desejam obter o selo, possam entender os impactos oriundos desta ação.
Em um mundo cada vez mais competitivo, em que o fator tempo impacta cada vez mais nos projetos. A... more Em um mundo cada vez mais competitivo, em que o fator tempo impacta cada vez mais nos projetos. A abordagem Canvas é uma alternativa gráfica para acelerar o processo de criação junto a equipe para o desenvolvimento de um novo negócio, uma iinovação tecnológica, uma nova campanha de marketing ou e a geração de jogos digitais, totalizando 26 modelos identificados. Apensar da quantidade dessas ferramentas a sua aplicação ainda é bem pequena junto a gerentes de projetos, desenvolvedores e inovadores. Diante disso esta pesquisa possui como objetivos: (1) identificar os modelos mais conhecidos e utilizados; (2) identificar os motivos para a adoção do modelo Canvas; e (3) identificar as barreiras para a adoção do modelo Canvas. Utiliza estudo de casos múltiplos e utiliza a triangulação de dados com entrevistas, questionário e a literatura. Como resultados foram identificadas 12 ferramentas mais conhecidas, 9 utilizadas, os 12 motivadores para a utilização dos modelos Canvas e 3 barreiras a serem transpostas. As limitações desta pesquisa são a quantidade de entrevistados e a limitação de 26 Canvas. A contribuição para a prática está na demonstração das opções disponíveis no mercado para os gestores poderem utilizar, os argumentos a serem citados mediante aos achados dos motivos de adoção e os possíveis problemas que poderão ter relacionados nas barreiras identificadas. A academia pode utilizar as barreiras e os motivos identificados para estudos de mitigação e potencialização
This paper shows the study of the canvas approach to the profiles of team members. It has a quali... more This paper shows the study of the canvas approach to the profiles of team members. It has a qualitative character. The objective is to identification the professional profile that uses the canvas approach. The results relate 12 Canvas Models and its interaction with 6 consulted professional profiles. The main contribution is the identification of relations between the use of the tools and professional profiles. However, the sequence of use idealized by the Canvas creators is not followed by the professional in practice.
Abstract: The number of projects coming to failure is high, especially those with degree of techn... more Abstract: The number of projects coming to failure is high, especially those with degree of technological dependence and are global. This research identifies the specific risks that can be found in global projects of Information Technology (IT). the inductive approach with exploratory character is used to raise the risk of local IT projects, which will be faced with the risks found in the literature of global IT projects. The originality of this research is separation of specific risks in global IT projects, eliminating the risks found in other technology-related projects. The result is a set of specific risks of global IT projects. The contribution to the academy is a list of risks to be searched. The implication for practice is the creation of mitigation plans the risks of research by project managers.
Resumo: O número de projetos que chegam ao insucesso é alto, principalmente os que possuem grau de dependência tecnológica e são globais. Esta pesquisa identifica os riscos específicos que podem ser encontrados em projetos globais de Tecnologia de Informação (TI). É utilizada a abordagem indutiva com caráter exploratório para levantar os riscos de projetos locais de TI, os quais serão confrontados com os riscos encontrados na literatura de projetos globais de TI. A originalidade desta pesquisa está separação dos riscos específicos em projetos globais de TI, eliminando os riscos encontrados em outros projetos relacionados à tecnologia. O resultado é um conjunto de riscos específicos de projetos globais de TI. A contribuição para a academia é uma lista de riscos a serem pesquisados. A implicação para a prática é a criação de planos de mitigação dos riscos da pesquisa pelos gerentes de projetos.
ABSTRACT The increasing use of rapid development of digital games project promotes the need for r... more ABSTRACT The increasing use of rapid development of digital games project promotes the need for risk identification to assist in the success of these projects. The purpose of this work is to identify risks in rapidly developing projects of digital games, to establish a possible relationship with the risks identified in the literature and propose mitigation of the risks found. The character of the research was exploratory, with the application of a literature review and semi-structured interviews. The results include a list of 19 identified risks, its relationship to literature and 5 proposals for mitigation of identified risks. The theoretical implication is a list of risks to be studied and as practical application is the use of fast development projects in digital games for project managers, team leaders and the like.
Resumo: A crescente utilização de projetos de desenvolvimento rápido de jogos digitais promove a necessidade de identificação de riscos para auxiliar no sucesso destes projetos. O intuito deste trabalho está na identificar os riscos em projetos de desenvolvimento rápido de jogos digitais, em estabelecer uma possível relação com os riscos identificados na literatura e propor mitigações para os riscos encontrados. O caráter da pesquisa foi exploratório, com a aplicação de uma revisão da literatura e entrevistas semi-estruturadas. Os resultados incluem uma lista com 19 riscos identificados, sua relação com a literatura e 5 propostas de mitigações dos riscos identificados. Como implicação teórica estão uma lista de riscos a serem estudados e como aplicação prática está na utilização em projetos de desenvolvimento rápidos em jogos digitais por gerentes de projetos, líderes de equipes e similares.
This paper identifies risks of scope and organizational risks in IT projects during the merger pe... more This paper identifies risks of scope and organizational risks in IT projects during the merger period in telecommunications companies and proposes actions for risk mitigation. It adopts an interpretive epistemology in an exploratory case study. The results include a list of unique risks about IT projects in such period, and recommendations for mitigating the risks, which were identified through the research. The theoretical contribution is a list of risks during the merger of telecommunications companies, and to the practical part, this contribution enables project managers to apply the identified findings and mitigations to the risk management in IT projects in a similar setting.
Resumo: A pesquisa possui a intenção de identificar as principais características dos Game Design... more Resumo: A pesquisa possui a intenção de identificar as principais características dos Game Design Documents (GDD) de jogos digitais no período de 1997 a 2014. A metodologia utilizada foi a pesquisa bibliográfica. Os objetivos foram de identificar os itens relevantes nos principais GDD do mercado e propor uma estrutura de um GDD que reúna os principais aspectos dos itens identificado em um documento que tenha como foco o desenvolvimento de jogos. O resultado foi a elaboração de uma estrutura de um documento que pode ser aplicada no desenvolvimento de qualquer jogo. As contribuições são de uma nova estrutura para estudos e para aplicação no mercado.
Abstract: The research has the intention to identify the main features of Game Design Documents (GDD) digital games from 1997 to 2014. The methodology used in this bibliographic research. The objectives were to identify the relevant items in the main GDD market and propose a structure bringing together key aspects of the identified items. The result was the development of a structure of a document that can be applied in the development of any game. Contributions are a new structure for studies and market application.
This paper identifies risks associated with stakeholders in IT projects in the period of merger i... more This paper identifies risks associated with stakeholders in IT projects in the period of merger in telecommunications companies and proposes mitigation actions. It adopts an interpretive epistemology in an exploratory case study. The results include a list of unique risks in IT projects in such a period and recommendations for mitigating the risks identified in the study. The theoretical contribution is a list of risks during the merger of telecommunications companies, and the contribution to the practice enables project managers apply the findings identified and mitigations in the risk management in IT projects in a similar setting.
GOLS RESUMO Este estudo analisa as obras planejadas na Copa do Mundo de 2014 realizadas no Brasil... more GOLS RESUMO Este estudo analisa as obras planejadas na Copa do Mundo de 2014 realizadas no Brasil sob os aspectos da tríplice restrição. Possui caráter exploratório no tocante ao levantamento das obras realizadas, atrasadas e canceladas disponibilizadas por diversas fontes. A metodologia utilizada é um estudo de caso único exploratório, de natureza qualitativa e com unidade de análise as obras para a Copa do Mundo de 2014 no Brasil. Utilizou pesquisa bibliográfica com vistas ao referencial teórico sobre copa e os dados disponíveis a respeito do evento, utilizando dados oficiais e outras fontes midiáticas. Os objetivos são de apresentar uma lista com as 10 principais obras por status, analisar sob o ponto de vista da tríplice restrição as obras especificadas para a copa e elencar as principais obras concluídas. Os resultados indicam que a gestão do evento não obteve sucesso em relação às questões de escopo, tempo e custo previstos para o evento. A implicação para a academia é da análise sobre a gestão de projetos feita pelo governo federal em grandes eventos. Em relação à contribuição prática é a apresentação do panorama da gestão de grandes eventos a serem incorporados nas matrizes de riscos dos gerentes de projetos. ABSTRACT This study analyzes the works planned in the 2014 World Cup held in Brazil in the aspect of the triple constraint. Have exploratory regarding the survey of works completed, late and canceled available from various sources. The methodology used is a single case study exploratory, qualitative analysis and unit works for the World Cup 2014 in Brazil. Used bibliographical research aiming at the theoretical framework on pantry and available data about the event, using official data and other media sources. The objectives are to present a list of major works by status, analyze under the triple constraint point of view the works specified for the league and list the major works completed. The results indicate that the management of the event was not successful efforts regarding scope, cost and time expected for the event. The implication to the academy is the analysis of the project management made by the federal government at large events. Regarding the practical contribution is the presentation of the overview of the management of major events to be incorporated into the matrices risk of project managers.
In any organization, dealing with lessons learned is a complex issue that involves people, proces... more In any organization, dealing with lessons learned is a complex issue that involves people, processes and technologies. Although lessons learned processes are already well established in the project management community, the use of modern web technologies to support them is still in its infancy. This paper introduces a new model to manage lessons learned in PMBoK process groups. This model draws upon interdisciplinary literature, which embeds lessons learned processes, shared context and Web 2.0 service models. The model is supported by Web 2.0 technologies and centered in PMBoK process groups to allow a thorough overview of the project. An exploratory focus group was set up to validate the model qualitatively within a constructivist ontology and an interpretive epistemology. The adoption of this model can help academics and practitioners using PMBoK process groups to acquire a better understanding of managing lessons learned in projects. Copyr ight © 2016, SciKA. General per missio n t o republish in pr int or elect ronic forms, but not for profit , all or p art of t his mat er ial is grant ed, provided t hat t he Int ernat ional Jour nal o f I nfor mat io n S yst ems and Pro ject Manage ment copyr ight notice is given and t hat reference made t o t he publicat ion, t o it s dat e of issue, and t o t he fact t hat reprint ing pr ivileges we re grant ed by per miss io n o f SciKA-Associat ion for Pro mot ion and D isseminat io n o f Scient ific Knowledge.
Este estudo identifica riscos novos e potencializados em projetos de Tecnologia da Informação (TI... more Este estudo identifica riscos novos e potencializados em projetos de Tecnologia da Informação (TI) com equipes locais. O caráter é exploratório no tocante ao levantamento dos riscos junto aos gerentes de projeto de empresas de diversos setores, onde foram confrontados os riscos encontrados na literatura com os elencados nas entrevistas. Os resultados incluem os riscos que foram identificados pelos entrevistados e ausentes na literatura, denominados riscos novos, e os riscos que foram mencionados significativamente pela literatura e pela pesquisa, denominados riscos potencializados. A implicação para a prática permite às empresas incluírem em suas gestões de riscos dos projetos de TI os riscos novos identificados e maior atenção aos riscos potencializados indicados neste trabalho, e assim permitir a criação de planos de mitigação. A contribuição teórica é a identificação de riscos adicionais ao estado da arte na área de gestão de projetos de TI
One of the challenges in Project Management (PM) is the introduction of information technology in... more One of the challenges in Project Management (PM) is the introduction of information technology in PM methodologies. To deal with this issu, the use of Web 2.0 technologies to support virtual work and virtual management of projects has gained attention in recent years. At the same time, the adoption of agile methodologies has grown to better assist mainly the management of information technology projects. This paper proposes a conceptual contribution through the use of Web 2.0 technologies in Scrum methodology. It suggests Web 2.0 tools to fit each artifact and event Scrum, which provide an environment for virtual management of projects. Such tools support meetings and knowledge sharing. It also presents the research qustions (RQ) and methods that will be used to conduct this work. RQ1 is "How can Web 2.0 technologies be integrated into Scrum methodology to monitor projects and store and share knowledge generated in the meetings?" and RQ2 is "To what extent do Web 2.0 technologies improve the performance of Scrum teams?" To address RQ1 and RQ2, we will use multiple case study and action research methods, respectively.
As organizações sofrem pressões para atender as mudanças cada vez mais rápidas da sociedade. A gr... more As organizações sofrem pressões para atender as mudanças cada vez mais rápidas da sociedade. A grande utilização de tecnologia para o gerenciamento de informação faz com que uma nova forma de gestão de equipes seja criada como alternativa, em alguns projetos, das equipes tradicionais de fábrica de software. O novo formato denominado equipes virtuais é aplicada para suprir essas necessidades. A comparação das equipes tradicionais e virtuais é evidenciada. Apesar de algumas inconveniências, a equipe virtual pode ser aplicada em situações em que a competência requerida ao projeto não está disponível nas proximidades geográficas da organização. A convivência de equipes tradicionais e virtuais é possível
Este trabalho tem o intuito de preencher a lacuna de como pode ser aplicado o modelo diamante Nov... more Este trabalho tem o intuito de preencher a lacuna de como pode ser aplicado o modelo diamante Novidade-Tecnologia-Complexidade-Ritmo em um projeto de TI de um software de captura de dados de uma máquina de corrosão. É apresentado o conflito entre o que estava planejado e a sua execução. Os resultados incluem uma discussão dos motivos que levaram as divergências do planejado, a representação gráfica do projeto no modelo diamante e a respectiva versão adaptada.
This work aims to fill the gap as the diamond model Novelty-Complexity-Technology-Pace can be applied in an IT project of a software to capture data from one machine to corrosion. The conflict between what was planned and its implementation is presented. The results include a discussion of the reasons divergences than planned, the graphical representation of the project on the diamond model and its adapted version.
Foi-se há muito o tempo em que os projetos de Tecnologia da Informação restringiam-se ao âmbito ... more Foi-se há muito o tempo em que os projetos de Tecnologia da Informação
restringiam-se ao âmbito doméstico. O intuito deste estudo é identificar a diferenciação das
categorias de riscos entre projetos globais e domésticos. O caráter da pesquisa foi exploratório
realizado por meio de uma revisão sistemática da literatura: 503 riscos identificados em 16
artigos foram classificados em 23 categorias. Foi detectado que a principal diferença entre as
categoria de cada tipo de projeto refere-se às características de distância psíquica, categoria
exclusiva dos projetos globais. Ademais, a distância psíquica também impactou outras
categorias nos projetos globais.
Books by Irapuan Gloria Junior
Este livro teve como origem a necessidade de compartilhar parte de pesquisas que estão sendo real... more Este livro teve como origem a necessidade de compartilhar parte de pesquisas que estão sendo realizadas. Apresentada no formato de capítulos, possui diversos temas, como Tecnologia da Informação, Gestão do conhecimento, Gestão da Qualidade e da área financeira.
O leitor identificará a liberdade concedida a cada autor-pesquisador na criação dos capítulos, mas com o rigor científico que lhe é peculiar.
Os conjuntos dos capítulos foram criados segundo as áreas definidas pela associação do setor para que, desta forma, o leitor possa dirigir-se diretamente ao assunto que mais lhe agrade e ao mesmo tempo, ser inserido naturalmente aos rótulos empregados pelos engenheiros de produção.
Agora, convido o leitor a conhecer um pouco mais sobre a Engenhaira da Produção por meio dos capítulos deste livro.
http://www.perse.com.br/novoprojetoperse/WF2_BookDetails.aspx?filesFolder=N1467768462574
Journal of Global Information Management, 2018
The development of information technology projects is no longer limited to the domestic sphere. T... more The development of information technology projects is no longer limited to the domestic sphere. This study identifies the differentiation of risk categories between global and domestic projects through an exploratory research carried out by way of a systematic literature review. 1367 risks were identified in 37 articles and classified within 22 categories. The major concern regard of domestic project management was client (external risk) and scope (internal risk) and about global project management was psychic distance (external) and coordination and control (internal). The main difference between the risk categories for each project type refers to the psychic distance category that was identified almost exclusively in global projects, which makes external risks more numerous than in domestic projects. In the other hand, it makes risks as client, supplier and stakeholders be underestimated. The results indicate that the project managers should focus their attention on different risks depending on the type of IT project, global or domestic.
Entre as empresas da indústria de cosméticos é possível perceber uma macrotendência sendo estabel... more Entre as empresas da indústria de cosméticos é possível perceber uma macrotendência sendo estabelecida com a busca de produtos sustentáveis. Desta forma as empresas precisam se adaptar adequando-se a certificação de selos de sustentabilidade disponíveis no mercado. A metodologia desta pesquisa é um estudo de caso único, qualitativo e interpretativista. Possui como objetivos apresentar os principais processos de certificação dos selos de certificação existentes e identificar os impactos que a doção desses selos causam na empresa no setor de HPPC. Os resultados foram a apresentação dos processos de certificação dos selos ECOCERT e IBD e uma lista de 9 impactos na empresa. As contribuições para a academia é a de apresentar que há uma alteração não apenas no setor produtivo, mas em outros processos, a contribuição para a prática foi para que os gestores de outras empresas, que desejam obter o selo, possam entender os impactos oriundos desta ação.
Em um mundo cada vez mais competitivo, em que o fator tempo impacta cada vez mais nos projetos. A... more Em um mundo cada vez mais competitivo, em que o fator tempo impacta cada vez mais nos projetos. A abordagem Canvas é uma alternativa gráfica para acelerar o processo de criação junto a equipe para o desenvolvimento de um novo negócio, uma iinovação tecnológica, uma nova campanha de marketing ou e a geração de jogos digitais, totalizando 26 modelos identificados. Apensar da quantidade dessas ferramentas a sua aplicação ainda é bem pequena junto a gerentes de projetos, desenvolvedores e inovadores. Diante disso esta pesquisa possui como objetivos: (1) identificar os modelos mais conhecidos e utilizados; (2) identificar os motivos para a adoção do modelo Canvas; e (3) identificar as barreiras para a adoção do modelo Canvas. Utiliza estudo de casos múltiplos e utiliza a triangulação de dados com entrevistas, questionário e a literatura. Como resultados foram identificadas 12 ferramentas mais conhecidas, 9 utilizadas, os 12 motivadores para a utilização dos modelos Canvas e 3 barreiras a serem transpostas. As limitações desta pesquisa são a quantidade de entrevistados e a limitação de 26 Canvas. A contribuição para a prática está na demonstração das opções disponíveis no mercado para os gestores poderem utilizar, os argumentos a serem citados mediante aos achados dos motivos de adoção e os possíveis problemas que poderão ter relacionados nas barreiras identificadas. A academia pode utilizar as barreiras e os motivos identificados para estudos de mitigação e potencialização
This paper shows the study of the canvas approach to the profiles of team members. It has a quali... more This paper shows the study of the canvas approach to the profiles of team members. It has a qualitative character. The objective is to identification the professional profile that uses the canvas approach. The results relate 12 Canvas Models and its interaction with 6 consulted professional profiles. The main contribution is the identification of relations between the use of the tools and professional profiles. However, the sequence of use idealized by the Canvas creators is not followed by the professional in practice.
Abstract: The number of projects coming to failure is high, especially those with degree of techn... more Abstract: The number of projects coming to failure is high, especially those with degree of technological dependence and are global. This research identifies the specific risks that can be found in global projects of Information Technology (IT). the inductive approach with exploratory character is used to raise the risk of local IT projects, which will be faced with the risks found in the literature of global IT projects. The originality of this research is separation of specific risks in global IT projects, eliminating the risks found in other technology-related projects. The result is a set of specific risks of global IT projects. The contribution to the academy is a list of risks to be searched. The implication for practice is the creation of mitigation plans the risks of research by project managers.
Resumo: O número de projetos que chegam ao insucesso é alto, principalmente os que possuem grau de dependência tecnológica e são globais. Esta pesquisa identifica os riscos específicos que podem ser encontrados em projetos globais de Tecnologia de Informação (TI). É utilizada a abordagem indutiva com caráter exploratório para levantar os riscos de projetos locais de TI, os quais serão confrontados com os riscos encontrados na literatura de projetos globais de TI. A originalidade desta pesquisa está separação dos riscos específicos em projetos globais de TI, eliminando os riscos encontrados em outros projetos relacionados à tecnologia. O resultado é um conjunto de riscos específicos de projetos globais de TI. A contribuição para a academia é uma lista de riscos a serem pesquisados. A implicação para a prática é a criação de planos de mitigação dos riscos da pesquisa pelos gerentes de projetos.
ABSTRACT The increasing use of rapid development of digital games project promotes the need for r... more ABSTRACT The increasing use of rapid development of digital games project promotes the need for risk identification to assist in the success of these projects. The purpose of this work is to identify risks in rapidly developing projects of digital games, to establish a possible relationship with the risks identified in the literature and propose mitigation of the risks found. The character of the research was exploratory, with the application of a literature review and semi-structured interviews. The results include a list of 19 identified risks, its relationship to literature and 5 proposals for mitigation of identified risks. The theoretical implication is a list of risks to be studied and as practical application is the use of fast development projects in digital games for project managers, team leaders and the like.
Resumo: A crescente utilização de projetos de desenvolvimento rápido de jogos digitais promove a necessidade de identificação de riscos para auxiliar no sucesso destes projetos. O intuito deste trabalho está na identificar os riscos em projetos de desenvolvimento rápido de jogos digitais, em estabelecer uma possível relação com os riscos identificados na literatura e propor mitigações para os riscos encontrados. O caráter da pesquisa foi exploratório, com a aplicação de uma revisão da literatura e entrevistas semi-estruturadas. Os resultados incluem uma lista com 19 riscos identificados, sua relação com a literatura e 5 propostas de mitigações dos riscos identificados. Como implicação teórica estão uma lista de riscos a serem estudados e como aplicação prática está na utilização em projetos de desenvolvimento rápidos em jogos digitais por gerentes de projetos, líderes de equipes e similares.
This paper identifies risks of scope and organizational risks in IT projects during the merger pe... more This paper identifies risks of scope and organizational risks in IT projects during the merger period in telecommunications companies and proposes actions for risk mitigation. It adopts an interpretive epistemology in an exploratory case study. The results include a list of unique risks about IT projects in such period, and recommendations for mitigating the risks, which were identified through the research. The theoretical contribution is a list of risks during the merger of telecommunications companies, and to the practical part, this contribution enables project managers to apply the identified findings and mitigations to the risk management in IT projects in a similar setting.
Resumo: A pesquisa possui a intenção de identificar as principais características dos Game Design... more Resumo: A pesquisa possui a intenção de identificar as principais características dos Game Design Documents (GDD) de jogos digitais no período de 1997 a 2014. A metodologia utilizada foi a pesquisa bibliográfica. Os objetivos foram de identificar os itens relevantes nos principais GDD do mercado e propor uma estrutura de um GDD que reúna os principais aspectos dos itens identificado em um documento que tenha como foco o desenvolvimento de jogos. O resultado foi a elaboração de uma estrutura de um documento que pode ser aplicada no desenvolvimento de qualquer jogo. As contribuições são de uma nova estrutura para estudos e para aplicação no mercado.
Abstract: The research has the intention to identify the main features of Game Design Documents (GDD) digital games from 1997 to 2014. The methodology used in this bibliographic research. The objectives were to identify the relevant items in the main GDD market and propose a structure bringing together key aspects of the identified items. The result was the development of a structure of a document that can be applied in the development of any game. Contributions are a new structure for studies and market application.
This paper identifies risks associated with stakeholders in IT projects in the period of merger i... more This paper identifies risks associated with stakeholders in IT projects in the period of merger in telecommunications companies and proposes mitigation actions. It adopts an interpretive epistemology in an exploratory case study. The results include a list of unique risks in IT projects in such a period and recommendations for mitigating the risks identified in the study. The theoretical contribution is a list of risks during the merger of telecommunications companies, and the contribution to the practice enables project managers apply the findings identified and mitigations in the risk management in IT projects in a similar setting.
GOLS RESUMO Este estudo analisa as obras planejadas na Copa do Mundo de 2014 realizadas no Brasil... more GOLS RESUMO Este estudo analisa as obras planejadas na Copa do Mundo de 2014 realizadas no Brasil sob os aspectos da tríplice restrição. Possui caráter exploratório no tocante ao levantamento das obras realizadas, atrasadas e canceladas disponibilizadas por diversas fontes. A metodologia utilizada é um estudo de caso único exploratório, de natureza qualitativa e com unidade de análise as obras para a Copa do Mundo de 2014 no Brasil. Utilizou pesquisa bibliográfica com vistas ao referencial teórico sobre copa e os dados disponíveis a respeito do evento, utilizando dados oficiais e outras fontes midiáticas. Os objetivos são de apresentar uma lista com as 10 principais obras por status, analisar sob o ponto de vista da tríplice restrição as obras especificadas para a copa e elencar as principais obras concluídas. Os resultados indicam que a gestão do evento não obteve sucesso em relação às questões de escopo, tempo e custo previstos para o evento. A implicação para a academia é da análise sobre a gestão de projetos feita pelo governo federal em grandes eventos. Em relação à contribuição prática é a apresentação do panorama da gestão de grandes eventos a serem incorporados nas matrizes de riscos dos gerentes de projetos. ABSTRACT This study analyzes the works planned in the 2014 World Cup held in Brazil in the aspect of the triple constraint. Have exploratory regarding the survey of works completed, late and canceled available from various sources. The methodology used is a single case study exploratory, qualitative analysis and unit works for the World Cup 2014 in Brazil. Used bibliographical research aiming at the theoretical framework on pantry and available data about the event, using official data and other media sources. The objectives are to present a list of major works by status, analyze under the triple constraint point of view the works specified for the league and list the major works completed. The results indicate that the management of the event was not successful efforts regarding scope, cost and time expected for the event. The implication to the academy is the analysis of the project management made by the federal government at large events. Regarding the practical contribution is the presentation of the overview of the management of major events to be incorporated into the matrices risk of project managers.
In any organization, dealing with lessons learned is a complex issue that involves people, proces... more In any organization, dealing with lessons learned is a complex issue that involves people, processes and technologies. Although lessons learned processes are already well established in the project management community, the use of modern web technologies to support them is still in its infancy. This paper introduces a new model to manage lessons learned in PMBoK process groups. This model draws upon interdisciplinary literature, which embeds lessons learned processes, shared context and Web 2.0 service models. The model is supported by Web 2.0 technologies and centered in PMBoK process groups to allow a thorough overview of the project. An exploratory focus group was set up to validate the model qualitatively within a constructivist ontology and an interpretive epistemology. The adoption of this model can help academics and practitioners using PMBoK process groups to acquire a better understanding of managing lessons learned in projects. Copyr ight © 2016, SciKA. General per missio n t o republish in pr int or elect ronic forms, but not for profit , all or p art of t his mat er ial is grant ed, provided t hat t he Int ernat ional Jour nal o f I nfor mat io n S yst ems and Pro ject Manage ment copyr ight notice is given and t hat reference made t o t he publicat ion, t o it s dat e of issue, and t o t he fact t hat reprint ing pr ivileges we re grant ed by per miss io n o f SciKA-Associat ion for Pro mot ion and D isseminat io n o f Scient ific Knowledge.
Este estudo identifica riscos novos e potencializados em projetos de Tecnologia da Informação (TI... more Este estudo identifica riscos novos e potencializados em projetos de Tecnologia da Informação (TI) com equipes locais. O caráter é exploratório no tocante ao levantamento dos riscos junto aos gerentes de projeto de empresas de diversos setores, onde foram confrontados os riscos encontrados na literatura com os elencados nas entrevistas. Os resultados incluem os riscos que foram identificados pelos entrevistados e ausentes na literatura, denominados riscos novos, e os riscos que foram mencionados significativamente pela literatura e pela pesquisa, denominados riscos potencializados. A implicação para a prática permite às empresas incluírem em suas gestões de riscos dos projetos de TI os riscos novos identificados e maior atenção aos riscos potencializados indicados neste trabalho, e assim permitir a criação de planos de mitigação. A contribuição teórica é a identificação de riscos adicionais ao estado da arte na área de gestão de projetos de TI
One of the challenges in Project Management (PM) is the introduction of information technology in... more One of the challenges in Project Management (PM) is the introduction of information technology in PM methodologies. To deal with this issu, the use of Web 2.0 technologies to support virtual work and virtual management of projects has gained attention in recent years. At the same time, the adoption of agile methodologies has grown to better assist mainly the management of information technology projects. This paper proposes a conceptual contribution through the use of Web 2.0 technologies in Scrum methodology. It suggests Web 2.0 tools to fit each artifact and event Scrum, which provide an environment for virtual management of projects. Such tools support meetings and knowledge sharing. It also presents the research qustions (RQ) and methods that will be used to conduct this work. RQ1 is "How can Web 2.0 technologies be integrated into Scrum methodology to monitor projects and store and share knowledge generated in the meetings?" and RQ2 is "To what extent do Web 2.0 technologies improve the performance of Scrum teams?" To address RQ1 and RQ2, we will use multiple case study and action research methods, respectively.
As organizações sofrem pressões para atender as mudanças cada vez mais rápidas da sociedade. A gr... more As organizações sofrem pressões para atender as mudanças cada vez mais rápidas da sociedade. A grande utilização de tecnologia para o gerenciamento de informação faz com que uma nova forma de gestão de equipes seja criada como alternativa, em alguns projetos, das equipes tradicionais de fábrica de software. O novo formato denominado equipes virtuais é aplicada para suprir essas necessidades. A comparação das equipes tradicionais e virtuais é evidenciada. Apesar de algumas inconveniências, a equipe virtual pode ser aplicada em situações em que a competência requerida ao projeto não está disponível nas proximidades geográficas da organização. A convivência de equipes tradicionais e virtuais é possível
Este trabalho tem o intuito de preencher a lacuna de como pode ser aplicado o modelo diamante Nov... more Este trabalho tem o intuito de preencher a lacuna de como pode ser aplicado o modelo diamante Novidade-Tecnologia-Complexidade-Ritmo em um projeto de TI de um software de captura de dados de uma máquina de corrosão. É apresentado o conflito entre o que estava planejado e a sua execução. Os resultados incluem uma discussão dos motivos que levaram as divergências do planejado, a representação gráfica do projeto no modelo diamante e a respectiva versão adaptada.
This work aims to fill the gap as the diamond model Novelty-Complexity-Technology-Pace can be applied in an IT project of a software to capture data from one machine to corrosion. The conflict between what was planned and its implementation is presented. The results include a discussion of the reasons divergences than planned, the graphical representation of the project on the diamond model and its adapted version.
Foi-se há muito o tempo em que os projetos de Tecnologia da Informação restringiam-se ao âmbito ... more Foi-se há muito o tempo em que os projetos de Tecnologia da Informação
restringiam-se ao âmbito doméstico. O intuito deste estudo é identificar a diferenciação das
categorias de riscos entre projetos globais e domésticos. O caráter da pesquisa foi exploratório
realizado por meio de uma revisão sistemática da literatura: 503 riscos identificados em 16
artigos foram classificados em 23 categorias. Foi detectado que a principal diferença entre as
categoria de cada tipo de projeto refere-se às características de distância psíquica, categoria
exclusiva dos projetos globais. Ademais, a distância psíquica também impactou outras
categorias nos projetos globais.
Este livro teve como origem a necessidade de compartilhar parte de pesquisas que estão sendo real... more Este livro teve como origem a necessidade de compartilhar parte de pesquisas que estão sendo realizadas. Apresentada no formato de capítulos, possui diversos temas, como Tecnologia da Informação, Gestão do conhecimento, Gestão da Qualidade e da área financeira.
O leitor identificará a liberdade concedida a cada autor-pesquisador na criação dos capítulos, mas com o rigor científico que lhe é peculiar.
Os conjuntos dos capítulos foram criados segundo as áreas definidas pela associação do setor para que, desta forma, o leitor possa dirigir-se diretamente ao assunto que mais lhe agrade e ao mesmo tempo, ser inserido naturalmente aos rótulos empregados pelos engenheiros de produção.
Agora, convido o leitor a conhecer um pouco mais sobre a Engenhaira da Produção por meio dos capítulos deste livro.
http://www.perse.com.br/novoprojetoperse/WF2_BookDetails.aspx?filesFolder=N1467768462574